05-521-01_Rev 0.pdf

PDF 935 KB Posted

Attached to
NOAA Ship Ronald H. Brown: Mid-Life Refit Federal contract opportunity
Solicitation number
1305M221RNMAN01155
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document package includes a technical drawing and specifications for a federal contract opportunity to perform a mid-life refit of the NOAA Ship Ronald H. Brown.

The technical drawing depicts proposed modifications to the ship's fire main piping system, including replacing an existing fire pump and strainer. The material schedule and equipment list provide additional details on piping materials and components.

The federal contract opportunity seeks a firm-fixed price contract to upgrade and overhaul multiple ship systems, such as repowering, bow thruster, science refrigeration, HVAC, tank level indicators, and exterior vent renewals. Much of the ship's piping and identified steel will also be replaced. Interested vendors must submit any inquiries by June 28, 2021 and proposals by August 6, 2021 to the identified contracting and contract specialist emails. The refit work will be awarded under FAR Part 12 for commercial items in conjunction with FAR Part 15 negotiations. The NOAA Ship Ronald H. Brown is owned by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship Ronald H. Brown: Mid-Life Refit, newest first.
File Type Posted
SF30_Amendment_0008_RBML_Complete.pdf PDF
SF30_Amendment_0007_RBML_Complete.pdf PDF
SF30_Amendment_0006_RBML_Complete.pdf PDF
20065.01-02-501-01_Bow Thruster Equipment Removal and Installation Plan_Rev(-) signed.pdf PDF
WP-27 Transducer Modifications V1.pdf PDF
428711_EM 124 - SAT procedure.pdf PDF
RB-528- 6932929.pdf PDF
WP-11 Ships Stores Refrigeration Equipment Replacement V1.pdf PDF
WP 07B - AC Controls Upgrades V1.pdf PDF
SF30_Amendment_0004_RBML_Complete.pdf PDF
18038.02-10A-514-01 AC Spaces General Electrical Modifications_Rev-_20201023.pdf PDF
429347_HAT PROCEDURE SBP 27 and SBP 29.pdf PDF
428709_em124_hat_procedure.pdf PDF
SF30_Amendment_0003_RBML_Complete.pdf PDF
Tech Man RB-437-00.pdf PDF
Keen-K4RHX100M2-43-4.625-Inch-Implr-Pump-Data.pdf PDF
18038.02-12-514-01 Chilled Water Diagram_Rev- signed.pdf PDF
6932929.pdf PDF
20065.01-01-201-01 Machinery Arrangements_Rev(P1).pdf PDF
20065.01-01-536-01 FW Cooling Diagram_Rev(P1).pdf PDF
Consolidated References_07142021.pdf PDF
18038.02-01-440-02_Machinery Control System Points List_Rev A_signed.pdf PDF
18038.02-10C-512-01_AHU5 Zone Redesign - Arrangements_Rev- signed.pdf PDF
20065.01-01-300-06_Electrical One-Line Removals Diagram_Rev(P1).pdf PDF
20065.01-01-551-01 Compressed Air Diagram_Rev(P1).pdf PDF
20065.01-01-543-01 Waste Oil Diagram_ Rev(P1).pdf PDF
20065.01-01-260-01 Fuel Oil System Diagrams_ Rev(P1).pdf PDF
20065.01-01-513-02_Natural Ventilation Trunk Modifications_Rev(P1).pdf PDF
18038.02-10B-514-01_AC Control System Mods Diagram_Rev- signed.pdf PDF
20065.01-01-300-01_Electrical One-Line Diagram_Rev(P1).pdf PDF
RB_461A_RB-461A-07_RevA_Sht001-024_ABS_MULTIBEAM FAIRING CONSTRUCTION.pdf PDF
18038.02-10C-512-02_AHU5 Zone Redesign - AC System Modifications_Rev- signed.pdf PDF
20065.01-01-517-01 Waste Heat Diagram Rev (P1).pdf PDF
20065.01-01-320-01_Propulsion Switchboard Layout_Rev(P1).pdf PDF
20065.01-01-320-02_Ship Service Switchboard Layout_Rev(P1).pdf PDF
20065.01-01-513-01_Generator Room Ventilation Upgrades_Rev(P1).pdf PDF
18038.02-11A-512-01 HVAC Makeup Air Upgrades_Rev- signed.pdf PDF
RB_101-6932803_RevE_SHT001-0013.pdf PDF
20065.01-01-532-01 SW Cooling Diagram_Rev(P1).pdf PDF
WP-25 Steel Replacement REV 1.pdf PDF
SF-30 Amendment 0001.pdf PDF
J.4 USDL Poster.pdf PDF
J.8 Standard Form 1416 - Payment Bond.pdf PDF
J.2 Section B - Schedule of supplies or services.xlsx XLSX spreadsheet
J.1 SF-33_Solicitation_Offer_Award.pdf PDF
RFP - 1305M221RNMAN01155_RHB Mid-Life.pdf PDF
J.3 Specification (Work Packages and References).zip ZIP file
J.5 Past Performance Information Form.rtf RTF text file
J.6 Past Performance Questionnaire.docx DOCX document
J.7 Standard Form 1418 - Performance Bond.pdf PDF
Show all 50

NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ofSheet

Rev

Scale

C

A

D

Maritime Systems Division

2750 Prosperity Avenue Suite 600

Fairfax VA 22031

(703) 270 1540

Size

Drawing Title

Drawn by Date Prepared for

Date

Date

Checked by

Approved by

NOAA Office of Marine & Aviation Operations

8403 Colesville Road

Silver Spring MD 20910

B

C

A

D

Drawing Number

THIRD ANGLE PROJECTION

UNLESS OTHERWISE SPECIFIED

DIM ARE IN INCHES

TOL ON ANGLE ± 0.01°

INTERPRET DIM AND TOL PER

ASME Y14.5M-2009

ABS Approval Date

DateUSCG Approval

HULL NUMBER

05-521-01D

R104

NOAA SHIP RONALD H. BROWN

SWBS

FIRE MAIN SYSTEM A&D PIPING

MODIFICATIONS

D W

G

R E

V

GENERAL NOTES

REVISIONS

ZONE REV DESCRIPTION DATE APPROVED

REFERENCES

NO. TITLE DRAWING NO.

R/V RONALD H. BROWN MIDLIFE REFIT WP-00, GENERAL REQUIREMENTS

WP-00

R/V RONALD H. BROWN MIDLIFE REFIT WP-05, FIRE MAIN SYSTEM PIPING

REPLACEMENT

WP-05

AGOR 24 OCEANOGRAPHIC RESEARCH SHIP FIRE MAIN SYSTEM

ARRANGEMENT & DETAILS, REV D, 05/07/1997

6932925

AGOR 24 OCEANOGRAPHIC RESEARCH SHIP PIPING MODULE ASSEMBLY NO. 5,

REV E, 04/14/1997

6932905

AGOR 24 OCEANOGRAPHIC RESEARCH SHIP FIRE MAIN SYSTEM DIAGRAM,

REV C, 05/07/1997

6932924

DRAWING INDEX

SHT REV TITLE

1 - COVER SHEET

2 - PIPING MODS

GENERAL NOTES

1 VESSEL PARTICULARS:

- LENGTH BETWEEN PERPENDICULARS: 252'-8"

- LENGTH OVERALL: 273'-2"

- BREADTH MOLDED: 52'-6"

- MOLDED DEPTH AT MAIN DECK: 26'-6"

- DRAFT, DESIGN AT MIDSHIP: 17'-0"

- DRAFT, FULL LOAD: 17'-0"

- DISPLACEMENT, DEADWEIGHT: 1275.04 LT

- DISPLACEMENT, FULL LOAD: 3527.22 LT

- DISPLACEMENT, LIGHT SHIP: 2252.18 LT

- FRAME SPACING: 2'-0" THROUGHOUT

2 VESSEL CARRIES THE FOLLOWING ABS NOTATION: ✠ A1, Ⓔ, ✠ AMS, ✠ ACCU, Ice Class C, PMP

3 ALL WELDING, WORKSMANSHIP, AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT

ABS MARINE VESSEL RULES, USCG, AND IMO REGULATIONS

4 JOINTS BETWEEN PIPING CONSTRUCTED OF DISSIMILAR METALS SHALL BE PROVIDED WITH A

FLANGED "WASTER PIECE," LENGTH TWO TO THREE TIMES THE PIPE DIAMETER,

CONSTRUCTED OF SEAMLESS, EXTRA STRONG, CARBON STEEL PIPE. THE WASTER PIECE

SHALL BE GALVANICALLY ISOLATED FROM THE HULL AND ALL OTHER PIPING.

5 IT IS NOT THE INTENT OF THIS DRAWING TO DETAIL ALL EQUIPMENT, GRATINGS, HANDRAILS

AND LADDERS, BUT TO LOCATE THE SIGNIFICANT ITEMS. LESS SIGNIFICANT ITEMS ARE

GENERALLY NOT SHOWN. THE LOCATION OF THESE ITEMS SHALL BE DETERMINED BY THE

CONTRACTOR AND PROPOSED TO THE OWNER FOR APPROVAL PRIOR TO INSTALLATION.

6 SYSTEM INSTALLATION SHALL PERMIT CLEAR PASSAGE ALONG WALKWAYS AND

LADDERWAYS; CLEAR ACCESS FOR OPERATION AND ROUTINE MAINTENANCE; CLEAR

ACCESS TO ALL DOORS, HATCHES AND OPENINGS; AND, AS MUCH AS IS PRACTICABLE, BE

FREE OF INTERFERENCES FOR THE DISASSEMBLY OF EQUIPMENT TO PERFORM

INSPECTIONS AND REPAIRS.

7 THIS ARRANGEMENT IS THE PREFERRED SOLUTION BASED ON THE INFORMATION AVAILABLE,

BUT MAY REQUIRE MODIFICATION DURING THE PRODUCTION PHASE. ANY MODIFICATIONS TO

THE ARRANGEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR. FINAL ARRANGEMENTS

SHALL BE REVIEWED AND APPROVED BY OWNER.

8 EQUIPMENT LOCATIONS ARE APPROXIMATE, AND WITH PRIOR APPROVAL BY THE OWNER,

THE CONTRACTOR MAY RELOCATE EQUIPMENT TO ALIGN EQUIPMENT FOUNDATIONS WITH

PRIMARY STRUCTURAL MEMBERS FOR PROPER SUPPORT.

9 MACHINERY AND EQUIPMENT ENVELOPE DIMENSIONS ARE APPROXIMATE AND SHALL

CONFIRMED BY THE CONTRACTOR USING MANUFACTURER'S CERTIFIED DATA.

10 THIS DRAWING WAS DEVELOPED TO REPLACE EXISTING FIRE PUMP AND SIMPLEX STRAINER

IN THE PUMP ROOM.

MATERIAL SCHEDULE

PIPING SYSTEM

PIPE TAKEDOWN JOINTS VALVES

FLEX

CONN'S

FITTINGS

TYPE & MATERIAL

MAX WORKING CONDITIONS

REMARKS

SIZE MATERIAL MATERIAL GASKETS BOLTING BODY TRIM SYSTEM PRESSURE TEMP

FIREMAIN

(USCG CLASS 2)

(ABS CLASS 3)

2" &

BELOW

CNA 90:10,

UNS C70600

ASME SB466

CLASS 200,

SEAMLESS

BRONZE, ASME SB61,

UNION, BRAZED,

MIL-F-1183

INORGANIC

FIBER WITH

NITRILE

BINDER,

GARLOCK 5500

OR EQUAL W/

ABS FIRE TEST

CERT.

DRY AREAS:

STEEL ASTM A307

GR B, ANSI

B18.2.1, STEEL

ASTM A563 GR A,

ANSI B18.2.2

BRONZE, ASME SB61 OR SB62, CLASS 150,

BRAZE BALL: MSS-SP-110

GATE/GLOBE/CHECK: MSS-SP-80

BRONZE OR

NCA (MONEL)

HOSES:

SAE J1942

REUSABLE

FITTINGS

SAE 1475

BRONZE, ASME

SB61, BRAZED,

MIL-F-1183

FIREMAIN 121 PSIG 95°F 1) NON-CONSUMABLE

BACKING RINGS ARE

PROHIBITED

2) RESILIENT SEATED

VALVES SHALL BE

CATEGORY A

3) MSS-SP-80 VALVES

LIMITED TO 75% OF VALVE

PRESSURE DESIGN

2-1/2" &

ABOVE

BRONZE, ASME SB61 OR

SB62, CLASS 150, FLANGE,

BRAZE, ANSI B16.24 OR

CNA 90:10, ASME SB61 OR

SB62, CLASS 150, FLANGE,

ANSI B16.5

WET AREAS: SS

ASTM A193 GR B8,

ANSI B18.2.1 SS

ASTM A194 GR B8,

ANSI B18.2.2

BRONZE, ASME SB61 OR SB62, CLASS 150,

FLANGE GATE/GLOBE/CHECK: MSS-SP-80

BUTTERFLY: MSS-SP-67, WAFER OR LUG,

DUCTILE IRON ASTM A395

BRONZE OR

NCA (MONEL)

EXP JOINTS:

ASTM F1123

COMPLIANT,

ABS

APPROVED

CNA 90:10, ASME

SB466, NAVSEA

DWG. 810-1385880,

CLASS 200,

BUTTWELD

EQUIPMENT LIST

EQUIPMENT # SIZE DESCRIPTION MATERIAL MFR PART NO. NOTES

521E001 0'-5" DUPLEX BASKET STRAINER AL BRONZE TBD TBD

521P001 2-1/2X3X9

FIRE PUMP, 409 GPM @118 PSI

BRONZE AURORA

361A, 8" IMP. DIA RPM 3600, 50 HP

ValvePosSystemIdKeywordDescriptionDimensionalDescriptionPipelineId

2' 10_5/8"

R

E F

8' 3_1/8", MAX

4' 4_7/8", REF

2' 7_1/4", REF

R

E F

6' 7/8"

FR99 FR98 FR97 FR96 FR95 FR94 FR93 FR92 FR91 FR90

CL

LOOKING DOWN AT PUMP ROOM

PORT SIDE

PLAN 2-6C

FWD

PORT

#5 FUEL

OIL TANK

#6 SW

BALLAST

TANK

#6 FUEL

OIL TANK

8' 6" OCL

B

B

521P001

521E001

FIRE PUMP

SEACHEST

SUCTION

SEE REF 4

ENGINEERS STORES

& PUMP ROOM

SEE REF 3

11-B

11-B

R

E F

R

E F

FR90FR91FR92FR93FR94FR95FR96FR97FR98FR99

LOOKING PORT FROM CENTERLINE

ELEVATION 14-B

FWD

UP

SCIENTIFIC

STOREROOM

#2

#5 FUEL OIL

TANK

WINCH

ROOM

#6 FUEL

OIL TANK

1ST PLATFORM

17'-6" ABL

TANK TOP

9'-6" ABL

14'-6" ABL

SEE REF 4

521E001

521P001

4' 3_1/8"

CL

LOOKING AFT FROM FRAME 92

SECTION 11-B

PORT

UP

#5 FUEL

OIL TANK

SCIENTIFIC

STOREROOM

#2

#5 FUEL OIL

TANK

EXISTING INCLINE LADDER

521E001

521P001

SEE GN #4

SEE REF 4

8' 6" OCL

FWD

PORT

UP

FIREMAIN SYSTEM

PUMP ROOM

ISOMETRIC 10-D

CONTRACTOR

DESIGNED AND

INSTALLED

CONTINUES TO

AFF SYSTEM

SEE REF 4

CONTINUES TO UPPER

DECKS, SEE REF 3

521P001

WASTER PIECE

SEE GN #4

521E001

CONTINUES TO SEACHEST

PIPE EXISTING AFTER VALVE

ofSheet

Rev

Scale

Size Drawing Number

D 05-521-01

A

D

C

B

A

C

B

D

Title

PIPING MODS

Sheets and Views
05-521-01-COVER-D size
05-521-01-CONT-D size