This document package includes a technical drawing and specifications for a federal contract opportunity to perform a mid-life refit of the NOAA Ship Ronald H. Brown.
The technical drawing depicts proposed modifications to the ship's fire main piping system, including replacing an existing fire pump and strainer. The material schedule and equipment list provide additional details on piping materials and components.
The federal contract opportunity seeks a firm-fixed price contract to upgrade and overhaul multiple ship systems, such as repowering, bow thruster, science refrigeration, HVAC, tank level indicators, and exterior vent renewals. Much of the ship's piping and identified steel will also be replaced. Interested vendors must submit any inquiries by June 28, 2021 and proposals by August 6, 2021 to the identified contracting and contract specialist emails. The refit work will be awarded under FAR Part 12 for commercial items in conjunction with FAR Part 15 negotiations. The NOAA Ship Ronald H. Brown is owned by the Department of Commerce National Oceanic and Atmospheric Administration.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ofSheet
Rev
Scale
C
A
D
Maritime Systems Division
2750 Prosperity Avenue Suite 600
Fairfax VA 22031
(703) 270 1540
Size
Drawing Title
Drawn by Date Prepared for
Date
Date
Checked by
Approved by
NOAA Office of Marine & Aviation Operations
8403 Colesville Road
Silver Spring MD 20910
B
C
A
D
Drawing Number
THIRD ANGLE PROJECTION
UNLESS OTHERWISE SPECIFIED
DIM ARE IN INCHES
TOL ON ANGLE ± 0.01°
INTERPRET DIM AND TOL PER
ASME Y14.5M-2009
ABS Approval Date
DateUSCG Approval
HULL NUMBER
05-521-01D
R104
NOAA SHIP RONALD H. BROWN
SWBS
FIRE MAIN SYSTEM A&D PIPING
MODIFICATIONS
D W
G
R E
V
GENERAL NOTES
REVISIONS
ZONE REV DESCRIPTION DATE APPROVED
REFERENCES
NO. TITLE DRAWING NO.
R/V RONALD H. BROWN MIDLIFE REFIT WP-00, GENERAL REQUIREMENTS
WP-00
R/V RONALD H. BROWN MIDLIFE REFIT WP-05, FIRE MAIN SYSTEM PIPING
REPLACEMENT
WP-05
AGOR 24 OCEANOGRAPHIC RESEARCH SHIP FIRE MAIN SYSTEM
ARRANGEMENT & DETAILS, REV D, 05/07/1997
6932925
AGOR 24 OCEANOGRAPHIC RESEARCH SHIP PIPING MODULE ASSEMBLY NO. 5,
REV E, 04/14/1997
6932905
AGOR 24 OCEANOGRAPHIC RESEARCH SHIP FIRE MAIN SYSTEM DIAGRAM,
REV C, 05/07/1997
6932924
DRAWING INDEX
SHT REV TITLE
1 - COVER SHEET
2 - PIPING MODS
GENERAL NOTES
1 VESSEL PARTICULARS:
- LENGTH BETWEEN PERPENDICULARS: 252'-8"
- LENGTH OVERALL: 273'-2"
- BREADTH MOLDED: 52'-6"
- MOLDED DEPTH AT MAIN DECK: 26'-6"
- DRAFT, DESIGN AT MIDSHIP: 17'-0"
- DRAFT, FULL LOAD: 17'-0"
- DISPLACEMENT, DEADWEIGHT: 1275.04 LT
- DISPLACEMENT, FULL LOAD: 3527.22 LT
- DISPLACEMENT, LIGHT SHIP: 2252.18 LT
- FRAME SPACING: 2'-0" THROUGHOUT
2 VESSEL CARRIES THE FOLLOWING ABS NOTATION: ✠ A1, Ⓔ, ✠ AMS, ✠ ACCU, Ice Class C, PMP
3 ALL WELDING, WORKSMANSHIP, AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT
ABS MARINE VESSEL RULES, USCG, AND IMO REGULATIONS
4 JOINTS BETWEEN PIPING CONSTRUCTED OF DISSIMILAR METALS SHALL BE PROVIDED WITH A
FLANGED "WASTER PIECE," LENGTH TWO TO THREE TIMES THE PIPE DIAMETER,
CONSTRUCTED OF SEAMLESS, EXTRA STRONG, CARBON STEEL PIPE. THE WASTER PIECE
SHALL BE GALVANICALLY ISOLATED FROM THE HULL AND ALL OTHER PIPING.
5 IT IS NOT THE INTENT OF THIS DRAWING TO DETAIL ALL EQUIPMENT, GRATINGS, HANDRAILS
AND LADDERS, BUT TO LOCATE THE SIGNIFICANT ITEMS. LESS SIGNIFICANT ITEMS ARE
GENERALLY NOT SHOWN. THE LOCATION OF THESE ITEMS SHALL BE DETERMINED BY THE
CONTRACTOR AND PROPOSED TO THE OWNER FOR APPROVAL PRIOR TO INSTALLATION.
6 SYSTEM INSTALLATION SHALL PERMIT CLEAR PASSAGE ALONG WALKWAYS AND
LADDERWAYS; CLEAR ACCESS FOR OPERATION AND ROUTINE MAINTENANCE; CLEAR
ACCESS TO ALL DOORS, HATCHES AND OPENINGS; AND, AS MUCH AS IS PRACTICABLE, BE
FREE OF INTERFERENCES FOR THE DISASSEMBLY OF EQUIPMENT TO PERFORM
INSPECTIONS AND REPAIRS.
7 THIS ARRANGEMENT IS THE PREFERRED SOLUTION BASED ON THE INFORMATION AVAILABLE,
BUT MAY REQUIRE MODIFICATION DURING THE PRODUCTION PHASE. ANY MODIFICATIONS TO
THE ARRANGEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR. FINAL ARRANGEMENTS
SHALL BE REVIEWED AND APPROVED BY OWNER.
8 EQUIPMENT LOCATIONS ARE APPROXIMATE, AND WITH PRIOR APPROVAL BY THE OWNER,
THE CONTRACTOR MAY RELOCATE EQUIPMENT TO ALIGN EQUIPMENT FOUNDATIONS WITH
PRIMARY STRUCTURAL MEMBERS FOR PROPER SUPPORT.
9 MACHINERY AND EQUIPMENT ENVELOPE DIMENSIONS ARE APPROXIMATE AND SHALL
CONFIRMED BY THE CONTRACTOR USING MANUFACTURER'S CERTIFIED DATA.
10 THIS DRAWING WAS DEVELOPED TO REPLACE EXISTING FIRE PUMP AND SIMPLEX STRAINER
IN THE PUMP ROOM.
MATERIAL SCHEDULE
PIPING SYSTEM
PIPE TAKEDOWN JOINTS VALVES
FLEX
CONN'S
FITTINGS
TYPE & MATERIAL
MAX WORKING CONDITIONS
REMARKS
SIZE MATERIAL MATERIAL GASKETS BOLTING BODY TRIM SYSTEM PRESSURE TEMP
FIREMAIN
(USCG CLASS 2)
(ABS CLASS 3)
2" &
BELOW
CNA 90:10,
UNS C70600
ASME SB466
CLASS 200,
SEAMLESS
BRONZE, ASME SB61,
UNION, BRAZED,
MIL-F-1183
INORGANIC
FIBER WITH
NITRILE
BINDER,
GARLOCK 5500
OR EQUAL W/
ABS FIRE TEST
CERT.
DRY AREAS:
STEEL ASTM A307
GR B, ANSI
B18.2.1, STEEL
ASTM A563 GR A,
ANSI B18.2.2
BRONZE, ASME SB61 OR SB62, CLASS 150,
BRAZE BALL: MSS-SP-110
GATE/GLOBE/CHECK: MSS-SP-80
BRONZE OR
NCA (MONEL)
HOSES:
SAE J1942
REUSABLE
FITTINGS
SAE 1475
BRONZE, ASME
SB61, BRAZED,
MIL-F-1183
FIREMAIN 121 PSIG 95°F 1) NON-CONSUMABLE
BACKING RINGS ARE
PROHIBITED
2) RESILIENT SEATED
VALVES SHALL BE
CATEGORY A
3) MSS-SP-80 VALVES
LIMITED TO 75% OF VALVE
PRESSURE DESIGN
2-1/2" &
ABOVE
BRONZE, ASME SB61 OR
SB62, CLASS 150, FLANGE,
BRAZE, ANSI B16.24 OR
CNA 90:10, ASME SB61 OR
SB62, CLASS 150, FLANGE,
ANSI B16.5
WET AREAS: SS
ASTM A193 GR B8,
ANSI B18.2.1 SS
ASTM A194 GR B8,
ANSI B18.2.2
BRONZE, ASME SB61 OR SB62, CLASS 150,
FLANGE GATE/GLOBE/CHECK: MSS-SP-80
BUTTERFLY: MSS-SP-67, WAFER OR LUG,
DUCTILE IRON ASTM A395
BRONZE OR
NCA (MONEL)
EXP JOINTS:
ASTM F1123
COMPLIANT,
ABS
APPROVED
CNA 90:10, ASME
SB466, NAVSEA
DWG. 810-1385880,
CLASS 200,
BUTTWELD
EQUIPMENT LIST
EQUIPMENT # SIZE DESCRIPTION MATERIAL MFR PART NO. NOTES
521E001 0'-5" DUPLEX BASKET STRAINER AL BRONZE TBD TBD
521P001 2-1/2X3X9
FIRE PUMP, 409 GPM @118 PSI
BRONZE AURORA
361A, 8" IMP. DIA RPM 3600, 50 HP
ValvePosSystemIdKeywordDescriptionDimensionalDescriptionPipelineId
2' 10_5/8"
R
E F
8' 3_1/8", MAX
4' 4_7/8", REF
2' 7_1/4", REF
R
E F
6' 7/8"
FR99 FR98 FR97 FR96 FR95 FR94 FR93 FR92 FR91 FR90
CL
LOOKING DOWN AT PUMP ROOM
PORT SIDE
PLAN 2-6C
FWD
PORT
#5 FUEL
OIL TANK
#6 SW
BALLAST
TANK
#6 FUEL
OIL TANK
8' 6" OCL
B
B
521P001
521E001
FIRE PUMP
SEACHEST
SUCTION
SEE REF 4
ENGINEERS STORES
& PUMP ROOM
SEE REF 3
11-B
11-B
R
E F
R
E F
FR90FR91FR92FR93FR94FR95FR96FR97FR98FR99
LOOKING PORT FROM CENTERLINE
ELEVATION 14-B
FWD
UP
SCIENTIFIC
STOREROOM
#2
#5 FUEL OIL
TANK
WINCH
ROOM
#6 FUEL
OIL TANK
1ST PLATFORM
17'-6" ABL
TANK TOP
9'-6" ABL
14'-6" ABL
SEE REF 4
521E001
521P001
4' 3_1/8"
CL
LOOKING AFT FROM FRAME 92
SECTION 11-B
PORT
UP
#5 FUEL
OIL TANK
SCIENTIFIC
STOREROOM
#2
#5 FUEL OIL
TANK
EXISTING INCLINE LADDER
521E001
521P001
SEE GN #4
SEE REF 4
8' 6" OCL
FWD
PORT
UP
FIREMAIN SYSTEM
PUMP ROOM
ISOMETRIC 10-D
CONTRACTOR
DESIGNED AND
INSTALLED
CONTINUES TO
AFF SYSTEM
SEE REF 4
CONTINUES TO UPPER
DECKS, SEE REF 3
521P001
WASTER PIECE
SEE GN #4
521E001
CONTINUES TO SEACHEST
PIPE EXISTING AFTER VALVE
ofSheet
Rev
Scale
Size Drawing Number
D 05-521-01
A
D
C
B
A
C
B
D
Title
PIPING MODS
| Sheets and Views |
| 05-521-01-COVER-D size |
| 05-521-01-CONT-D size |
File details come from the government source that posted it. Updated .