10-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf

PDF 115 KB Posted

Attached to
124 Easton Road Demolition 25-01189. 01
Solicitation number
Not on record
Issued by
Pennsylvania

About this file

This specification document outlines construction facilities and temporary controls requirements for the 124 Easton Road Demolition project (25-01189.01) in Pennsylvania, administered by Montgomery Township. The specification establishes contractor responsibilities for temporary barriers, enclosures, fencing, water control, dust control, access roads, parking facilities, and progress cleaning throughout the demolition of the Shelby Apartments building and associated structures. Key contractor obligations include providing 6-foot-high fencing around the construction site with locked vehicular gates, maintaining temporary electricity and lighting for construction operations, implementing water control measures to maintain excavations free of standing water, and protecting existing facilities and adjacent properties from damage. The contractor must also establish access roads utilizing existing site paths, provide adequate on-site parking, maintain access to remaining Montgomery Township Public Works buildings, and perform continuous progress cleaning to remove debris and waste materials from the site.

The specification requires the contractor to bear all costs associated with temporary utilities, lighting, water control equipment, and site maintenance at no additional cost to the owner. Dust control measures must be implemented using methods such as water sprinkling or alternative owner-approved techniques to minimize airborne dust dispersal, with the Resident Project Representative authorized to require enhanced dust control measures at no additional expense. Prior to final payment, the contractor must remove all temporary utilities, equipment, facilities, and materials, restore the site to specified grading conditions, and repair any damage resulting from temporary work installations. Environmental remediation within the building and site restoration to match existing grading with stabilization are included as components of the overall project scope.

View the file

Other files

File Type Posted
32-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
38-Doc 00 73 00 8 - Appendix C - 2700-FM-AQ0021 - Form.pdf PDF
8-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 4 - Appendix B - cover sht.pdf PDF
19-Doc 00 62 76 - Application for Payment.pdf PDF
36-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
25-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
49-Doc 00 43 13 - BID BOND.pdf PDF
56-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 124 Easton Road Demo Revised.pdf PDF
14-Sec 02 41 16 - DEMOLITION.pdf PDF
39-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
51-Doc 00 73 00 3 - Appendix A - PA Wage Rate Determination.pdf PDF
18-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
3-Doc 00 73 00 14 - Appendix F - Universal Waste Report.pdf PDF
5-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
17-Sec 01 33 00 - SUBMITTALS.pdf PDF
6-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
9-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
47-Doc 00 73 00 12 - Appendix E - lead rpt-final.pdf PDF
26-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
24-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Doc 00 73 00 13 - Appendix F - cover sht.pdf PDF
43-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
54-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
12-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
29-Doc 00 73 00 10 - Appendix D - ACM Survey Rpt-final.pdf PDF
40-Doc 00 73 00 7 - Appendix C - 2700-FM-AQ0021 - Instructions.pdf PDF
55-X 124 Easton Road Bid Set.pdf PDF
21-Doc 00 73 00 6 - Appendix C - cover sht.pdf PDF
4-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
2-Doc 00 91 13 - ADDENDA.pdf PDF
48-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
35-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
27-Doc 00 45 10 - BIDDER’S ACKNOWLEDGEMENT FORM.pdf PDF
34-Doc 00 63 63 - Change Order.pdf PDF
28-Doc 00 73 00 9 - Appendix D - cover sht.pdf PDF
22-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
31-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
16-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
46-Doc 00 73 00 2 - Appendix A - cover sht.pdf PDF
11-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
1-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
13-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
42-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
45-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
7-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
15-Doc 00 21 13.2 - PennBid - How To Submit a Bid.pdf PDF
33-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
37-Doc 00 41 00 - BID FORM - EBID.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01 50 00-1

SECTION 01 50 00

PART 1 GENERAL

1.01 GENERAL

A. The Work of this Section shall be the responsibility of the contractor as noted in the Summary of Work (Section 01 11 13).

1.02 SECTION INCLUDES

A. Temporary Controls: Barriers, enclosures and fencing, protection of the Work, water control and dust control.

B. Construction Facilities: Access roads, parking, and progress cleaning.

1.03 RELATED SECTIONS

A. Section 01 55 26: Traffic Regulation.

B. Section 01 57 13: Soil Erosion and Sediment Control.

C. Section 01 70 00: Contract Closeout: Final cleaning.

1.04 TEMPORARY ELECTRICITY

A. Cost: By Contractor; provide and pay for power service required from utility source.

1.05 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES

A. Provide and maintain lighting for construction operations and for security purposes.

B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.

C. Maintain lighting and provide routine repairs.

D. Permanent building lighting may [not] be utilized during construction. [Repair, clean, and replace lamps at end of construction.]

1.11 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to allow for Owner's use of site, and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Provide protection for plants designated to remain. Replace damaged plants.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.12 FENCING

A. Construction: Contractor's option.

01 50 00-2

B. Provide 6 foot high fence around construction site; equip with vehicular gates with locks.

C. CONTRACTOR provide OWNER keys for all gate locks.

1.13 WATER CONTROL

A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.

B. Protect site from puddling or running water.

1.16 PROTECTION OF INSTALLED WORK

A. Protect installed Work and provide special protection where specified in individual specification sections.

B. Provide temporary and removable protection for installed Products. Control activity in immediate work area to prevent damage.

C. Prohibit traffic from landscaped areas.

1.17 SECURITY

A. Provide security and facilities to protect Work and existing facilities from unauthorized entry, vandalism, or theft.

1.18 ACCESS ROADS

A. Utilize existing paths/roads within site.

B. Provide means of removing mud from vehicle wheels before entering streets.

C. Maintain access to the remaining buildings utilized by Montgomery Township Public Works.

1.19 PARKING

A. Plenty of area on-site for parking

B. Maintain access to the remaining buildings utilized by Montgomery Township Public Works.

1.20 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and rubbish from site [periodically] [weekly] and dispose off-site.

01 50 00-3

E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.21 PROJECT IDENTIFICATION

A. No signs are allowed without Owner permission except those required by law.

1.22 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, materials, prior to Final Application for Payment inspection.

B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated.

C. Clean and repair damage caused by installation or use of temporary work.

D. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.

1.23 DUST CONTROL

A. Execute Work by methods to minimize raising dust from construction operations.

B. Provide positive means (i.e. use of sprinkling water or other methods approved by the Resident Project Representative) to prevent air-borne dust from dispersing into atmosphere.

C. Dust control measures shall be employed when required in the opinion of the Resident

Project Representative at no additional cost to Owner.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION