34-Doc 00 63 63 - Change Order.pdf

PDF 92 KB Posted

Attached to
124 Easton Road Demolition 25-01189. 01
Solicitation number
Not on record
Issued by
Pennsylvania

About this file

This is a Change Order document (EJCDC Form C-941) for the 124 Easton Road Demolition project (Contract No. 25-01189.01) in Pennsylvania, involving the Owner, Contractor Gilmore & Associates, Inc., and Engineer. The change order authorizes modifications to the original contract documents for the demolition of the existing Shelby Apartments building at 111-124 Easton Road, which includes removal of associated concrete patios and asphalt parking lot, environmental remediation within the building, and site restoration to match existing grading with stabilization. The document provides a structured format for documenting the description of changes, reason for change order, and any supporting attachments related to the project modifications.

The change order template captures the financial and scheduling impact of the requested modifications, including the original contract price and times, net changes from any previous change orders, and the cumulative contract price and times with all approved change orders. It requires authorized signatures from the Engineer, Owner, and Contractor to document approval and acceptance of the changes, with designated fields for recording the effective date and date of issuance. The document does not specify particular dollar amounts, time extensions in days, or other numerical values, as it represents a blank form template awaiting completion with specific change order details.

View the file

Other files

File Type Posted
32-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
38-Doc 00 73 00 8 - Appendix C - 2700-FM-AQ0021 - Form.pdf PDF
8-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 4 - Appendix B - cover sht.pdf PDF
19-Doc 00 62 76 - Application for Payment.pdf PDF
36-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
25-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
49-Doc 00 43 13 - BID BOND.pdf PDF
56-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 124 Easton Road Demo Revised.pdf PDF
14-Sec 02 41 16 - DEMOLITION.pdf PDF
39-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
51-Doc 00 73 00 3 - Appendix A - PA Wage Rate Determination.pdf PDF
18-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
3-Doc 00 73 00 14 - Appendix F - Universal Waste Report.pdf PDF
5-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
17-Sec 01 33 00 - SUBMITTALS.pdf PDF
6-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
9-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
47-Doc 00 73 00 12 - Appendix E - lead rpt-final.pdf PDF
26-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
24-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Doc 00 73 00 13 - Appendix F - cover sht.pdf PDF
43-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
54-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
12-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
29-Doc 00 73 00 10 - Appendix D - ACM Survey Rpt-final.pdf PDF
40-Doc 00 73 00 7 - Appendix C - 2700-FM-AQ0021 - Instructions.pdf PDF
55-X 124 Easton Road Bid Set.pdf PDF
21-Doc 00 73 00 6 - Appendix C - cover sht.pdf PDF
4-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
2-Doc 00 91 13 - ADDENDA.pdf PDF
48-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
35-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
27-Doc 00 45 10 - BIDDER’S ACKNOWLEDGEMENT FORM.pdf PDF
28-Doc 00 73 00 9 - Appendix D - cover sht.pdf PDF
22-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
31-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
16-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
46-Doc 00 73 00 2 - Appendix A - cover sht.pdf PDF
11-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
1-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
13-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
42-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
45-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
7-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
15-Doc 00 21 13.2 - PennBid - How To Submit a Bid.pdf PDF
33-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
37-Doc 00 41 00 - BID FORM - EBID.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
44-Doc 00 73 00 11 - Appendix E - cover sht.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 63 63

No.

PROJECT:

DATE OF ISSUANCE EFFECTIVE DATE

OWNER:

OWNER'S Contract No.

CONTRACTOR: ENGINEER:

You are directed to make the following changes in the Contract Documents.

Description:

Reason for Change Order:

Attachments:

Original Contract Price Original Contract Times

Substantial Completion:

$ Ready for final payment:

Net changes from previous Change Orders No. to No. Net changes from previous Change Orders No. to No.

$ days

Contract Price prior to this Change Order Contract Times prior to this Change Order

Substantial Completion:

$ Ready for final payment:

Net increase (decrease) of this Change Order Net increase (decrease) of this Change Order

$ days

Contract Price with all approved Change Orders Contract Times with all approved Change Orders

Substantial Completion:

$ Ready for final payment:

RECOMMENDED: APPROVED: ACCEPTED:

By: By: By:

Date: Date: Date:

Engineer (authorized signature)

CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:

Owner (authorized signature) Contractor (authorized signature)

CHANGE ORDER

MIRIA

2025-01189.01

Gilmore & Associates, Inc.

EJCDC Form C-941

CHANGE ORDER

00 63 63-1

File details come from the government source that posted it. Updated .