1-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf
PDF 130 KB Posted
- Attached to
- 124 Easton Road Demolition 25-01189. 01
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This is a Specification Section document for landscape protection requirements applicable to the Pennsylvania state and local contract opportunity involving the demolition of Shelby Apartments at 111-124 Easton Road. The specification establishes comprehensive provisions for protecting existing plant materials during construction and demolition activities, requiring contractors to conduct site inspections to assess landscape protection needs based on plant type and location. The Work includes provisions for erecting protective fencing around designated plant materials to ensure their survival during and after construction completion, with temporary fencing to be placed a minimum of 15 feet from tree trunks or to the dripline (whichever is greater) prior to the start of construction or earthmoving activities. The specification references Pennsylvania Department of Transportation Publication 408 Specifications as the quality assurance standard and requires coordination with the Engineer through a pre-construction site inspection to review specific landscape protection concerns.
The specification prescribes specific products for temporary fencing, including undamaged standard picket snow fence (4 feet high) with wooden slats tightly woven with wire cable, orange open mesh construction fencing, or other approved weather-resistant alternatives, along with high carbon channel bar steel posts (7 feet in length) designed for ground installation with rivet-type fence holding lugs. Execution requirements prohibit grade changes and excavation within protection areas, restrict storage of toxic and petroleum-based materials within 100 feet of protection areas, prohibit vehicle and equipment parking in protected zones, and require removal of tree stumps within 10 feet of protection areas using stump grinders. The specification mandates that severed tree roots be trimmed cleanly and covered with moist materials within four hours of exposure to prevent drying, with temporary fencing to remain in place throughout the construction period until final site restoration occurs. Sediment basins are prohibited within or discharging into protection areas, and all temporary fencing must be periodically inspected with repairs completed to maintain integrity during construction.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LANDSCAPE PROTECTION
01 56 39-1
SECTION 01 56 39
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of this Section Includes:
1. Provisions for landscape protection including the location and erection of protective fencing as may be appropriate for specific plant materials so as to insure their survival during and after completion of construction.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 01 57 13: Soil Erosion and Sediment Control
2. Section 31 11 00: Clearing and Grubbing
3. Section 31 23 33: Excavation, Backfill and Compaction
1.03 QUALITY ASSURANCE
A. Reference Standards
1. Pennsylvania Dept. of Transportation Publication 408 Specifications.
1.04 JOB CONDITIONS
A. Contractor is responsible for determining through site inspection and assessment of construction requirements what protection standards are necessary and practical based on plant type and location.
B. Engineer will arrange for a site inspection with Contractor prior to initiation of construction to review specific landscape protection concerns.
PART 2 - PRODUCTS
2.01 FABRICATED PRODUCTS
A. Temporary Fencing:
1. Undamaged, standard picket snow fence, 4' high, formed of wooden slats, tightly woven with wire cable; orange, open mesh construction fencing; or other acceptable, highly visible, weather resistant, easily maintained fencing that provides a substantial barrier.
2. High carbon channel bar steel posts, 7 feet in length. Designed to drive satisfactorily into the ground and with at least ten fence holding lugs of the rivet type. Alternate post types may be approved by Engineer.
PART 3 - EXECUTION
01 56 39-2
3.01 PREPARATION
A. Prior to initiating construction, Contractor shall assess the site area and determine the protection standards required in addition to any specifically noted on the Drawings. Unusual circumstances or exceptions to the standards specified shall be resolved by agreement with Engineer.
3.02 GENERAL REQUIREMENTS
A. Grade changes and excavation shall not encroach upon a protection area.
B. No toxic materials shall be stored within 100 feet of a protection area including petroleum based and/or derived products.
C. The area within a protection area shall not be built upon, nor shall any materials be stored there either temporarily or permanently. Vehicles and equipment shall not be parked in a protection area.
D. When tree stumps are located within ten feet of a protection area the stumps shall be removed by means of a stump grinder to minimize the effect on surrounding root systems.
E. Tree roots which must be severed shall be cut by a backhoe or similar equipment aligned radially to the tree to reduce the lateral movement of the roots during excavation, which could damage the intertwined roots of adjacent trees. Within four (4) hours of any severance of roots, all tree roots that have been exposed and/or damaged shall be trimmed cleanly and covered temporarily with moist peat moss, moist burlap or other moist biodegradable material to keep them from drying out until permanent cover can be installed.
F. Sediment, retention and detention basins shall not be located within the protection area or discharge into the protection area.
3.03 ERECTION OF TEMPORARY FENCING
A. Prior to start of construction or earthmoving, a snow fence or approved alternate shall be placed around plant material specified to remain at a distance of 15' from the trunk of the plant material or the distance from the trunk to the dripline whichever is greater. For a group of trees or woodlands, the fence location shall be determined by the aggregate distance or driplines for the individual plant. Exceptions to this requirement must be approved by Engineer.
B. Temporary fencing shall be periodically inspected and repairs accomplished to insure continued integrity during the construction period.
C. Temporary fencing shall remain in place until final restoration of the site is to occur.
END OF SECTION