This is a Lead-Based Paint Inspection Report prepared by Criterion Laboratories, Inc. for Horsham Township, Pennsylvania, documenting the presence of lead-based paint at 124 Easton Road in Horsham, Pennsylvania. The inspection was conducted on November 6, 2025, by Michael Martin, a Pennsylvania-licensed Risk Assessor, and involved testing nine apartment units for lead-based paint using an X-550 Lead Paint Analyzer. The analysis identified lead-based paint (defined as 1.0 milligrams per square centimeter or greater) on various interior and exterior painted surfaces throughout eight of the nine units tested, with Unit B-5 showing no lead-based paint detection. Tested surfaces included baseboards, door casings, door jambs, and other wood components in living areas, bedrooms, bathrooms, hallways, and basement storage areas, with paint colors ranging from white to red and grey.

The report establishes that all identified lead-based paint surfaces were rated as intact in condition, classified as either friction or non-friction surfaces. The findings indicate that if renovation or painting activities disturb lead-based paint, work must comply with the EPA's Renovation, Repair, and Painting Program Final Rule (40 CFR Part 745) and OSHA regulations (29 CFR Part 1926.62), requiring certified individuals and firms to employ lead-safe work practices. The report notes that recommendation codes do not apply to the buildings as they are scheduled for demolition, and the facility owner/operator will be responsible for testing debris during demolition to determine whether it should be disposed of as hazardous or non-hazardous waste using the Toxicity Characteristic Leaching Procedure (TCLP) with a lead threshold of 5 parts per million.

View the file

Other files

File Type Posted
32-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
38-Doc 00 73 00 8 - Appendix C - 2700-FM-AQ0021 - Form.pdf PDF
8-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 4 - Appendix B - cover sht.pdf PDF
19-Doc 00 62 76 - Application for Payment.pdf PDF
36-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
25-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
49-Doc 00 43 13 - BID BOND.pdf PDF
56-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 124 Easton Road Demo Revised.pdf PDF
14-Sec 02 41 16 - DEMOLITION.pdf PDF
39-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
51-Doc 00 73 00 3 - Appendix A - PA Wage Rate Determination.pdf PDF
18-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
3-Doc 00 73 00 14 - Appendix F - Universal Waste Report.pdf PDF
5-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
17-Sec 01 33 00 - SUBMITTALS.pdf PDF
6-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
9-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
26-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
24-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Doc 00 73 00 13 - Appendix F - cover sht.pdf PDF
43-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
54-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
12-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
29-Doc 00 73 00 10 - Appendix D - ACM Survey Rpt-final.pdf PDF
40-Doc 00 73 00 7 - Appendix C - 2700-FM-AQ0021 - Instructions.pdf PDF
55-X 124 Easton Road Bid Set.pdf PDF
21-Doc 00 73 00 6 - Appendix C - cover sht.pdf PDF
4-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
2-Doc 00 91 13 - ADDENDA.pdf PDF
48-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
35-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
27-Doc 00 45 10 - BIDDER’S ACKNOWLEDGEMENT FORM.pdf PDF
34-Doc 00 63 63 - Change Order.pdf PDF
28-Doc 00 73 00 9 - Appendix D - cover sht.pdf PDF
22-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
31-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
16-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
46-Doc 00 73 00 2 - Appendix A - cover sht.pdf PDF
11-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
1-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
13-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
42-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
45-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
7-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
15-Doc 00 21 13.2 - PennBid - How To Submit a Bid.pdf PDF
33-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
37-Doc 00 41 00 - BID FORM - EBID.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
44-Doc 00 73 00 11 - Appendix E - cover sht.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

400 Street Road, Bensalem, PA 19020 / 215-244-1300 / Fax 215-244-4349 www.criterionlabs.com

At:

124 Easton Road Horsham, PA 19044

For:

Mr. Larry Burns Horsham Township 1025 Horsham Road Horsham, PA 19044

Prepared By:

Mr. Eric Wysocki Senior Project Manager

Report Date:

November 14, 2025

Project Number:

254068

Date of Project:

November 6, 2025

LEAD-BASED

PAINT

INSPECTION

Field Services

Lab

Training

Lead-Based Paint Inspection Report Horsham Township Criterion Laboratories, Inc.

TABLE OF CONTENTS

1.0 Executive Summary

2.0 Findings And Recommendations

Attachments

Testing Report Legend Calibration Check Test Results XRF Testing Report Sheets License Documentation

1.0 EXECUTIVE SUMMARY

Criterion Laboratories, Inc. (Criterion) was requested to perform a Lead-Based Paint Inspection of nine (9) apartment units located at 124 Easton Road in Horsham, Pennsylvania (the “Property”). The purpose of the inspection was to explore the presence of painted surfaces for lead-based throughout the property.

Mr. Michael Martin, a PA-licensed Risk Assessor for Criterion, performed the inspection on November 6, 2025.

Painted surfaces were analyzed for lead using an X-550 Lead Paint Analyzer manufactured by SciAps.

The U.S. Department of Housing and Urban Development (HUD) considers 1.0 milligrams of lead per square centimeter of painted surface, or greater, to be lead based paint ( 1.0 mg/c m²).

2.0 FINDINGS AND RECOMMENDATIONS

During the inspection, the presence of lead-based paint was detected on various surfaces on the on the property, (refer to Attachments). No lead-based paint was detected in Unit B-5. Listed on the attached sheets (Attachments) are location and components for the areas where painted surfaces were sampled. A summary of the locations/components testing positive for lead-based paint is included in the following table. You will find a legend in the Attachments Section, which will explain the codes used in this table.

The Environmental Protection Agency’s (EPA) Renovation, Repair, and Painting Program Final Rule (40 CFR Part 745) (RRP Rule) mandates that if lead-based paint is disturbed during renovation or painting activity then the work should be completed using lead-safe work practices as defined in the RRP Rule. In addition, the individual disturbing the lead-based paint has to be certified as well as the firm with whom he/she is employed.

Any painted surface that has lead content should not be sanded, demolished or disturbed without the proper engineering controls and work methods, as spelled out under the OSHA’s 29 CFR Part 1926.62 Lead Exposure in Construction, Interim Rule. Improper disturbance of any paint with lead content can cause lead to become airborne. The emphasis on controlling lead dust derives from the conclusion that lead dust appears to be the primary route of exposure to lead, especially of low-level exposure.

It is therefore important that occupants of the building and any contractors be made aware of the presence of the lead-based paint and the potential health risks associated with the ingestion of lead-based paint or the associated dust that results from the damaging of the painted surfaces.

Occupants and/or contractors should also be made aware of the importance of not damaging the painted surfaces and creating loose and flaking paint or the creation of dust. If the painted surfaces are damaged this should be reported to the proper building representative/maintenance personnel to properly correct the problem to prevent an increased exposure potential.

Please note that recommendation codes have not been listed as they don’t apply to the buildings inspected testing positive for lead, as they will be demolished. During demolition activity, the facility owner/operator is responsible for testing the actual debris to determine if it should be disposed of as hazardous or non-hazardous waste. Waste toxicity is measured by using the Toxicity Characteristic Leaching Procedure (TCLP) (40 CFR 261.24).

The TCLP extract is analyzed for lead (or other constituents) to determine if it is above or below the allowable Toxic Characteristic (TC) regulatory threshold, which for lead is 5 parts per million (ppm) or milligrams per liter (mg/l).

The following is a list of paints that tested positive for lead content.

124 Easton Road, Horsham, PA

Color/Substrate/

Location Component Surface/Condition

Unit A-1

Living Room/Dining Room White/Wood/Baseboard Non-Friction/Intact

Bedroom Door White/Wood/Door Casing Non-Friction/Intact

Bedroom Door White/Wood/Door Jamb Friction/Intact

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Bathroom White/Wood/Door Jamb Friction/Intact

Bathroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bathroom Closet Door White/Wood/Door Jamb Friction/Intact

Hallway White/Wood/Baseboard Non-Friction/Intact

Entry Red/Wood/Door Jamb Friction/Intact

Entry Red/Wood/Door Casing Non-Friction/Intact

Unit A-2

Living Room/Dining Room White/Wood/Baseboard Non-Friction/Intact

Bedroom White/Wood/Baseboard Non-Friction/Intact

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Jamb Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Unit A-2 (continued)

Bathroom White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Hall Closet White/Wood/Door Jamb Friction/Intact

Hall Closet White/Wood/Door Casing Non-Friction/Intact

Hallway White/Wood/Baseboard Non-Friction/Intact

Entry Red/Wood/Door Casing Non-Friction/Intact

Entry Red/Wood/Door Jamb Friction/Intact

Unit A-3

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Unit A-4

Bedroom White/Wood/Door Jamb Friction/Intact

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction-Intact

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Hall Closet White/Wood/Door Jamb Friction/Intact

Hall Closet White/Wood/Door Casing Non-Friction/Intact

Entry Grey/Wood/Exterior Door Casing Non-Friction/Intact

Hall/Stairwell A-3/A-4

Stairs Grey/Wood/Stair Stringer Non-Friction/Intact

Hall Grey/Wood/Door Casing Non-Friction/Intact

Exterior Door Red/Wood/Door Casing Non-Friction/Intact

Basement Beneath A Units

Storage Room Green/Wood/Door Non-Friction/Intact

Storage Room Green/Wood/Door Jamb Friction/Intact

Storage Room Green/Wood/Door Casing Non-Friction/Intact

Exit Door White/Wood/Door Non-Friction/Intact

Basement Beneath A Units

Exit Door White/Wood/Door Jamb Friction/Intact

Exit Door White/Wood/Door Casing Non-Friction/Intact

Interior Exit Door White/Wood/Door Jamb Friction/Intact

Exterior Door Red/Wood/Door Casing Non-Friction/Intact

Unit B-1

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Bathroom White/Wood/Door Jamb Friction/Intact

Bathroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bathroom Closet Door White/Wood/Door Jamb Friction/Intact

Entry Red/Wood/Door Casing Non-Friction/Intact

Entry Red/Wood/Door Jamb Friction-Intact

Unit B-2

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Bathroom White/Wood/Door Jamb Friction/Intact

Hallway White/Wood/Baseboard Non-Friction/Intact

Hall Closet White/Wood/Door Jamb Friction/Intact

Hall Closet White/Wood/Door Casing Non-Friction/Intact

Entry Red/Wood/Door Jamb Friction/Intact

Entry Red/Wood/Door Casing Non-Friction/Intact

Unit B-3

Living Room/Dining Room White/Wood/Baseboard Non-Friction/Intact

Bedroom White/Wood/Baseboard Non-Friction/Intact

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Jamb Friction/Intact

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Hallway White/Wood/Door Baseboard Non-Friction/Intact

Hall Closet Door White/Wood/Door Casing Non-Friction/Intact

Hall Closet Door White/Wood/Door Jamb Friction/Intact

Unit B-4

Bedroom White/Wood/Door Casing Non-Friction/Intact

Bedroom White/Wood/Door Jamb Friction-Intact

Bedroom Closet Door White/Wood/Door Casing Non-Friction/Intact

Bedroom Closet Door White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Jamb Friction/Intact

Bathroom White/Wood/Door Casing Non-Friction/Intact

Hall Closet White/Wood/Door Jamb Friction/Intact

Hall Closet White/Wood/Door Casing Non-Friction/Intact

Entry Grey/Wood/Door Casing Non-Friction/Intact

Entry White/Wood/Door Jamb Friction/Intact

ATTACHMENTS

Testing Report Legend

Recommendations

HR – Hazard Reduction

It is recommended that these surfaces be periodically observed for chalking, peeling or cracking.

If the surface is chalking, it can be cleaned with Trisodium Phosphate and repainted. If it is peeling or cracking, it should be repaired or abated.

AR – Abatement Replacement

A strategy of abatement that entails the removal of building components coated with lead-based paint and installation of new components free of lead-based paint.

A Encp – Abatement Encapsulation

“Encapsulant” means a coating or rigid material that relies on adhesion to a lead-based paint surface and is not mechanically fastened to the substrate with a 20-year warranty.

“Encapsulation” means a process to make lead-based paint inaccessible by providing a barrier between the lead-based paint and the environment, where the primary means of attachment for the encapsulant is bonding of a product to the surface covered either by the product itself or through the use of an adhesive.

A Encl – Abatement Enclosure

“Enclosure” means the installation of a rigid, durable barrier that is mechanically attached to building components, with all edges and seams sealed with caulk or other sealant and having a design life of at least 20 years.

CA – Complete Abatement

A process designed either to permanently eliminate lead-based paint hazards on a component and includes, but is not limited to: the removal of lead-based paint and lead-contaminated dust.

OSHA

Any painted surface that has lead content should not be sanded, demolished or disturbed without the proper engineering controls and work methods. As spelled out under OSHA’s CFR Part 1926 Lead Exposure in Construction, Interim Rule. Improper disturbance of any paint with lead content can cause lead to become airborne.

NA – Non-applicable

X-ray Fluorescence Spectrometer (XRF) results indicated 0.0 or below, which indicates no lead detected by the XRF Spectrometer.

Surface/Condition

Surface

A determination of whether a painted surface is considered friction/impact surface or non-friction impact surface.

Friction/Impact Surface – any interior or exterior surface subject to abrasion, friction or damage by repeated impact or contact.

Non-friction/Impact Surface – any interior or exterior surface not subject to abrasion, friction or damage by repeated impact or contact.

Condition

An intact good paint surface is smooth, continuous and free of surface defect, which would result in the release of paint dust or chips.

Large surfaces such as walls, floors and ceilings should be rated as follows:

Good or intact condition shall indicate a surface that is entirely intact;

Fair condition shall indicate a surface where less than or equal to two square feet of surface are not intact;

Poor condition shall indicate a surface where more than two square feet of surface are not intact.

Components without large surfaces, such as window sills, baseboards, or other small areas, shall be rated as follows:

Good or intact condition shall indicate that the surface is entirely intact;

Fair condition shall indicate that less than or equal to 10 percent of the surface is not intact;

Poor condition shall indicate that more than 10 percent of the surface is not intact.

Exterior components with large surface areas shall be rated as follows:

Good or intact condition shall indicate that the surface is entirely intact;

Fair condition shall indicate that less than or equal to ten square feet of surface is not intact;

Poor condition shall indicate that more than ten square feet of surface is not intact.