This is a technical specification document for excavation, backfill, and compaction work associated with foundation removal as part of the 124 Easton Road Demolition project in Pennsylvania. The scope of work includes unclassified excavation, backfill placement in compacted lifts, and site restoration following the demolition of the Shelby Apartments building and associated concrete patios and asphalt parking lot. The specification establishes compaction testing requirements at 50-foot centers or one test per 2,500 square feet for every 12 inches of fill placed, with testing performed by an independent soils testing agent approved by the Engineer and paid for by the Contractor. Excavations must be backfilled in lifts not exceeding specified compacted thicknesses, with each lift individually compacted to meet minimum density requirements per ASTM D1557 standards, ranging from 90 to 95 percent of maximum dry density depending on location. The work is coordinated with related sections including landscape protection, soil erosion and sediment control, concrete work, utility connections, and final site restoration and landscaping.
The specification requires contractors to maintain compaction testing documentation and submit certified results from the soils testing agency in accordance with contract administrative procedures. Contractors are responsible for all costs associated with compaction testing, including additional testing if materials do not meet specified requirements. Excavation materials must be managed to prevent encroachment onto adjacent properties, and surface drainage must be designed and maintained to prevent erosion and unwanted water flow. The work requires compliance with Pennsylvania Department of Transportation regulations, PennDOT Highway Occupancy Permits, Township Road Opening Permits, and local municipal codes. Unsuitable backfill material or defective compaction identified during construction must be removed and replaced at no cost to the Owner, with retesting required to confirm compliance with specifications.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCAVATION, BACKFILL AND COMPACTION
31 23 33-1
SECTION 31 23 33
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of this Section Includes:
1. Excavation, backfill and compaction associated with foundation removal.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 01 56 39: Landscape Protection
2. Section 01 57 13: Soil Erosion and Sediment Control
3. Section 03 30 00: Concrete Work for Structures
4. Section 03 30 53: Concrete Work for Utilities
5. Section 22 11 34: Water Service Facility
6. Section 31 11 00: Clearing and Grubbing
7. Section 31 23 16.26: Rock Removal
8. Section 32 12 23: Restoration of Paved Surfaces
9. Section 32 93 00: Landscaping
10. Section 33 05 23.16: Boring or Jacking Operations
11. Section 33 05 29: Stream Crossing
12. Section 33 11 00: Water Mains
13. Section 33 12 13: Water Service Connections
14. Section 33 31 13: Gravity Sanitary Sewer Pipe
15. Section 33 32 18: Sewage Pumping Station
16. Section 33 34 00: Sanitary Force Main and Appurtenances
17. Section 33 39 13: Sanitary Manholes
1.03 QUALITY ASSURANCE
A. Testing Agent:
1. Compaction testing for this Work shall be performed by Contractor at the discretion of the Resident Project Representative except if required by the PennDOT Highway
Occupancy Permit or Township Road Opening Permit. Where compaction testing is required by permit, such compaction testing shall be performed by an independent soils testing agent engaged and paid for by Contractor and approved by Engineer.
2. Contractor shall pay the cost of one series of tests on the area being evaluated.
Contractor shall also pay the cost for additional testing as required in the event of improper performance of the Work.
B. Reference Standards:
31 23 33-2
1. Pennsylvania Department of Transportation:
Regulations Governing Occupancy of Highways by Utilities (67 PA Code, Chapter 459)
Publication 408 Specifications
Pennsylvania Test Method, PTM 106
Pennsylvania Test Method, PTM 402
Publication 203, Work Zone Traffic Control
2. American Society for Testing and Materials (ASTM):
ASTM D1557 Test Method for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft.- lbf/ft3)
ASTM D2922 Standard Test Method for Density of Soil and Soil - Aggregate in nPlace by Nuclear Methods (Shallow Depth)
C. Compaction Testing:
1. Conduct compaction tests at locations on 50 foot centers (1 per 2500 square feet) or closer as required for every 12 inches of fill placed.
1.04 SUBMITTALS
A. Certificates:
1. Submit certified compaction testing results from the soils testing agency for any required compaction testing in accordance with Section 01 33 00.
1.05 JOB CONDITIONS
A. Classification of Excavation:
1. All excavation work performed under this contract is UNCLASSIFIED.
B. Compaction of Backfill:
1. Excavations shall be backfilled in lifts not exceeding compacted thicknesses noted in
Paragraph 3.11C. Each lift shall be individually compacted.
2. The following percentages of maximum dry density shall be achieved:
Modified
Effort
ASTM D1557
• Building Foundation and 95%
Structural Slab-on-Grade
31 23 33-3
• Exterior Side of Structure Walls 95% to point 5' from building wall, then 90%
• Trench Backfill under Pavement 95%
(not including base course materials)
• Trench Backfill within Unpaved Areas 90%
3. Contractor shall maintain moisture content of backfill materials at or near the optimum moisture content to attain the required compaction density.
D. Control of Traffic: (N/A)
E. Protection of Existing Utilities and Structures: (N/A)
F. Protection of Trees and Shrubs:
1. See Section 01 56 39
2. Any trees and/or shrubs to be protected which are damaged or destroyed during construction may be required to be replaced in kind as required by Owner.
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.01 EXAMINATION & PREPARATION
A. Identify required lines, levels, contours and datum.
B. Notify Engineer of unexpected subsurface conditions and discontinue work in area until notified to resume work.
C. Maintain and protect existing utilities identified by utility users within the Work area (see paragraph 1.05E).
D. Verify that structure walls are braced to support surcharge forces imposed by backfilling operations.
3.02 PROTECTION OF ADJACENT WORK
A. Underpin adjacent structures which may be damaged by excavation work, including utilities and pipe chases.
B. Grade excavation top perimeter to prevent surface water runoff into excavation or to adjacent properties.
3.03 MAINTENANCE AND PROTECTION OF TRAFFIC
31 23 33-4
A. Coordinate the work to insure the least inconvenience to traffic.
B. Maintain access to all streets and private drives.
C. Provide and maintain signs, flashing warning lights, barricades, markers, and other protective devices as required to conform with construction operations and to keep traffic flowing with minimum restrictions.
D. Comply with State and local Municipal codes, permits and regulations.
E. See Section 01 55 26 on Traffic Regulation.
3.04 CUTTING PAVED SURFACES
3.05 EXCAVATION
3.06 SUPPORT OF EXCAVATION
3.07 CONTROL OF EXCAVATED MATERIAL
A. Keep the ground surface, within a minimum of 2' of the sides of the excavation, free of excavated material.
B. Provide temporary barricades to prevent excavated material from encroaching on private property, walks, gutters, and storm drains.
C. Maintain accessibility to all fire hydrants, valve pit covers, valve boxes, curb boxes, fire and police call boxes, and other utility controls at all times. Keep gutters clear or provide other satisfactory facilities for street drainage. Do not obstruct natural water courses. Where necessary, provide temporary channels to allow the flow of water either along or across the site of the work.
D. In areas where excavations parallel or cross streams, ensure that no material slides, is washed, or dumped into the stream course. Remove diversion structures and/or cofferdams immediately upon completion of construction within the stream (See Section 33 05 29).
3.08 DEWATERING
A. Keep excavations dry and free of water. Dispose of precipitation and subsurface water clear of the work.
B. Maintain pipe trenches dry until pipe has been jointed, inspected, and backfilled, and concrete work has been completed. Prevent trench water from entering pipelines under construction.
C. Intercept and divert surface drainage away from excavations. Design surface drainage systems so that they do not cause erosion on or off the site, or cause unwanted flow of water.
D. Comply with Federal and State requirements for dewatering to any watercourse, prevention of stream degradation, and erosion and sediment control. (See Section 01 57 13).
31 23 33-5
3.09 BACKFILLING EXCAVATIONS
A. Unsuitable Backfill Material and/or Compaction:
1. Where the Resident Project Representative deems backfill material to be unsuitable and rejects all or part thereof due to conditions prevailing at the time of construction, remove the unsuitable material and replace with suitable backfill material.
2. If, during progress of the Work, tests indicate that compacted materials do not meet specified requirements, remove defective material, replace and retest at no cost to
Owner, as directed by the Resident Project Representative.
3.10 DISPOSAL OF EXCAVATED MATERIAL
3.11 ROUGH AND FINE GRADING
A. Grade areas disturbed by construction to a uniform finish. Form the bases for terraces, banks, lawns and paved areas.
B. Grade areas to be topsoiled and seeded to 4" below indicated finish contours.
3.12 RESTORATION OF UNPAVED SURFACES
A. Restore unpaved surfaces disturbed by construction to equal the surface condition prior to construction.
B. Restore grassed areas in accordance with Section 32 93 00, Landscaping.
3.15 RESTORATION OF PAVED SURFACES
END OF SECTION