Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead
Closed State & local contract opportunity Posted
- Solicitation number
- 25-69-1514
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91226 Construction, Hike And Bike Trail
- 91348 Construction, Special Foundation
- 91484 Trade Services, Construction (Not Otherwise Classified)
- 92517 Civil Engineering
- 92533 Engineer Services, Professional
- 95826 Construction Management Services
- 98852 Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services)
- 98863 Park Area Construction/Renovation
- UNSPSC codes
- 70111500 Plants and ornamental trees
- 70111601 Planting services
- 70131605 Soil chemical treatment services
- 70131604 Seed bed preparation services
- 70131602 Lime spreading services
- 72102902 Landscaping services
- 72102905 Exterior grounds maintenance
- 72154002 Artificial turf installation service
- 95121511 Park
- 72154016 Parade float construction service
Show all 38
- 72154026 Hydrogen cell refueling service
- 72154039 Building board up service
- 72154044 Water hewning or use service
- 81101500 Civil engineering
- 81101513 Building construction management
- 70131600 Land and soil preparation
- 70111704 Horticultural counseling services
- 95121516 Artificial rock and rockwall
- 72154000 Specialty building and trades services
- 72154047 Lift table service
- 70111600 Flowering plants
- 70111603 Floriculture services
- 70111711 Sprigging services
- 72141129 Park and garden construction and or remodelling service
- 95121515 Artificial water fall
- 95121508 Childrens play area or playground
- 72154011 Epoxy application service
- 72154020 Medical gas system installation service
- 72154040 Underground protective lining installation service
- 72154041 Target systems installation service
- 72154043 Industrial and commercial sprayingservice
- 72154045 Ground water level reduction service
- 70130000 Land and soil preparation and management and protection
- 70111501 Planting services or ornamental plant or bush or tree
- 70111602 Nursery services
- 70111703 Garden planting or maintenance services
- 70111709 Seeding services
- 70131601 Fertilizer application services
Opportunity details come from forsythco.bonfirehub.com. Updated .
About this opportunity
Forsyth County is seeking Progressive Design-Build Services for the Big Creek Greenway Rehabilitation project, which encompasses Phases 2 & 3, Phase 4, and the Bethelview Trailhead. The procurement (RFP No. 25-69-1514) involves comprehensive design and construction services for rehabilitating existing multi-use trail segments, boardwalks, and a trailhead parking area. Key deliverables include replacing deteriorating boardwalks with new 12-foot-wide structures using helical pile foundations, implementing erosion control measures, and reconstructing the Bethelview Trailhead with improved parking, drainage, and accessibility features. The evaluation criteria will utilize a 100-point scale, with 85 points allocated to technical proposals and 15 points to pricing. Critical dates include a mandatory site visit on July 15, 2025, proposal questions due by August 15, 2025, and proposal submissions due by August 28, 2025, at 2:00 PM EST. Proposers must submit via the Bonfire online platform and provide a 5% proposal security bond. Required qualifications include demonstrated experience with parks and recreation projects, multi-use trail or boardwalk design, and design-build project delivery.
While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, the project requires E-Verify compliance and work authorization documentation. The contract is 100% locally funded with no federal funds involved, and Forsyth County will provide construction material testing. The project has a targeted substantial completion date of October 31, 2027, with final completion by December 31, 2027. Though specific budget ranges were not definitively stated, the progressive design-build approach allows for a Preliminary Stage Price and a Completion Stage fee percentage, with costs to be developed during the Preliminary Stage Work and subject to a Guaranteed Maximum Price. The project involves multiple potential bidders, including companies like Volkert, Crowder, Astra Group, Excellere Construction, and MAPP LLC, who attended the mandatory site visit. The county will require the design-build team to become the Engineer of Record and submit necessary permits, including a Land Disturbance Permit and Building Permit.
Opportunity text
Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2 & 3, 4 and Bethelview Trailhead
Files
Show all 29
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity