Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead

Closed State & local contract opportunity Posted

Solicitation number
25-69-1514
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 38

Opportunity details come from forsythco.bonfirehub.com. Updated .

About this opportunity

Forsyth County is seeking Progressive Design-Build Services for the Big Creek Greenway Rehabilitation project, which encompasses Phases 2 & 3, Phase 4, and the Bethelview Trailhead. The procurement (RFP No. 25-69-1514) involves comprehensive design and construction services for rehabilitating existing multi-use trail segments, boardwalks, and a trailhead parking area. Key deliverables include replacing deteriorating boardwalks with new 12-foot-wide structures using helical pile foundations, implementing erosion control measures, and reconstructing the Bethelview Trailhead with improved parking, drainage, and accessibility features. The evaluation criteria will utilize a 100-point scale, with 85 points allocated to technical proposals and 15 points to pricing. Critical dates include a mandatory site visit on July 15, 2025, proposal questions due by August 15, 2025, and proposal submissions due by August 28, 2025, at 2:00 PM EST. Proposers must submit via the Bonfire online platform and provide a 5% proposal security bond. Required qualifications include demonstrated experience with parks and recreation projects, multi-use trail or boardwalk design, and design-build project delivery.

While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, the project requires E-Verify compliance and work authorization documentation. The contract is 100% locally funded with no federal funds involved, and Forsyth County will provide construction material testing. The project has a targeted substantial completion date of October 31, 2027, with final completion by December 31, 2027. Though specific budget ranges were not definitively stated, the progressive design-build approach allows for a Preliminary Stage Price and a Completion Stage fee percentage, with costs to be developed during the Preliminary Stage Work and subject to a Guaranteed Maximum Price. The project involves multiple potential bidders, including companies like Volkert, Crowder, Astra Group, Excellere Construction, and MAPP LLC, who attended the mandatory site visit. The county will require the design-build team to become the Engineer of Record and submit necessary permits, including a Land Disturbance Permit and Building Permit.

Opportunity text

Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2 & 3, 4 and Bethelview Trailhead

Files

File Type Posted
11-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
12-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
2-Summary of Work.pdf PDF
27-Big Creek Greenway Phase 4 - Ecology Survey - Waters - 5-29-25.pdf PDF
5-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
8-100% Design Drawings for Bethelview Trailhead.pdf PDF
9-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
10-Plan for the Rehabiliation, Restoration and Renewal 09252019.pdf PDF
13-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf PDF
20-Addendum 2 RFP 25-69-1514.pdf PDF
21-BCG Rehabilitation - Phase 4 Segment 2 60% Plans.pdf PDF
25-Summary of Work-Revision 1 08072025.pdf PDF
26-Big Creek Greenway Bethelview Trailhead - Hydrology Report.pdf PDF
4-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
15-1. RFP 25-69-1514 PDB Big Creek GW.pdf PDF
17-1.1 RFP 25-69-1514 Big Creek GW PDB-Agreement, GCs and SCs.pdf PDF
18-Addendum 1 RFP 25-69-1514.pdf PDF
23-Addendum 3 RFP 25-69-1514.pdf PDF
24-Addendum 4 RFP 25-69-1514.pdf PDF
28-Addendum 5 RFP 25-69-1514.pdf PDF
1-Specifications for Helical Pile Foundation.pdf PDF
14-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
16-0. Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
19-Sign In Sheet 25-69-1514.pdf PDF
22-Sign in Sheet for Site Visit.pdf PDF
29-Big Creek Greenway Bethelview Trailhead - Hydrology Report with Appendices.pdf PDF
3-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
6-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
7-Big Creek Greenway Phases 23 Ecology Survey - Waters 2-9-2024.pdf PDF
Show all 29