11-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf
PDF 106 MB Posted
- Solicitation number
- 25-69-1514
- Issued by
- Fayette County, Georgia
About this file
The document appears to be a technical drawing file for 11-30% design drawings related to the Big Creek Greenway Rehabilitation project in Georgia, specifically covering Phases 23, Segment 3 from Mile Marker 5.7 to 6.3. The file is part of a progressive design-build services contract for trail rehabilitation and development, focusing on a specific segment of the greenway project. The design drawings represent an intermediate stage of engineering development, indicating ongoing design refinement for a specific trail segment within the broader greenway improvement initiative.
While the file itself does not contain explicit pricing or funding details, it is associated with a state and local contract opportunity in Georgia for progressive design-build services. The project involves multiple phases of greenway rehabilitation, including Phases 2, 3, 4, and the Bethelview Trailhead, suggesting a comprehensive infrastructure improvement effort. The technical drawing represents a critical stage in the project's development, providing detailed design specifications for a specific trail segment that will likely inform subsequent construction and implementation phases.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .