This document is a comprehensive construction plan set for the Big Creek Greenway Phase 2/3 Rehabilitation Fowler Park Connection project, prepared by Heath & Lineback engineers for Forsyth County Parks and Recreation in Georgia. The project involves rehabilitating approximately 685 linear feet of boardwalk, including complete replacement of the existing boardwalk structure using helical pile foundations, widening the path to 12 feet, and implementing erosion control measures. The work includes removing the existing boardwalk, installing new steel supports and timber decking, adding safety railings for sections over 30 inches high, and performing shoulder erosion rehabilitation at multiple locations along the trail.
The project's scope includes detailed engineering specifications for boardwalk construction, with precise technical requirements for materials such as steel stringers, timber decking, helical piles, and concrete trail sections. The construction plan outlines specific quantities of materials and work, including 685 linear feet of boardwalk replacement, 52 helical piles, rip rap installations for erosion control, and associated grading and landscaping work. The documents indicate a comprehensive approach to trail rehabilitation that maintains accessibility and environmental considerations, with specific attention to slope gradients, drainage, and erosion prevention. The project appears to be fully funded and is part of Forsyth County's ongoing Parks and Recreation infrastructure improvement efforts.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILES
REVISIONS
GROSS LENGTH OF PROJECT
LENGTH OF PROJECT
LOCATION SKETCH
COUNTY No. 117
SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO
SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THE DEPARTMENT
FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
FORSYTH COUNTY.
THIS PROJECT IS 100% IN
NET LENGTH OF TRAIL
NET LENGTH OF BOARDWALK
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
01-0001
FORSYTH COUNTY
PARKS AND RECREATION
REHABILITATION2/3 BIG CREEK GREENWAY
PREPARED BY:
DESIGN
PROJECT LOCATION
G W
IN
N E
T
C O
U N
T Y
FULTON COUNTY
LAKE LANIER
G A
U S
G A
G A
AGREEMENT TASK 6 -
GREENWAY ENGINEERING SERVICES AS NEEDED
FOWLER PARK CONNECTION
01-0001
CONSTRUCTION PLAN
SUMMARY OF QUANTITIES
DESCRIPTIONDRAWING NO.
06-0001
INDEX
05-0001 TO 05-0008
COVER SHEET & INDEX
GENERAL NOTES04-0001 TO 04-0002
TYPICAL SECTIONS & DETAILS
0.010
0.130
0.000
0.140
0.010
13-0001
PLANS COMPLETED
90% PLANS
XX-XX-XXXX
19-0001 STAGING PLANS
35-0001 TO 35-0005 BOARDWALK DETAILS
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_01-0001.dgn
GRWCOV
R E
F F
IL
E
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
CONCOV
12/7/2018
DRAWING No.
.0
5.5
.0
6.5
7.0
7.
.0
.2
A T
L A
N
A
H
IG
H W
A Y
G A
U S
TRAILHEAD
BETHELVIEW ROAD
PARK ENTRANCE
ATLANTA HIGHWAY/FOWLER
B E T H E
LV
IE
W
R O A D
FOWLER PARK CONNECTION
PHASE 2/3 REHABILITAION
BIG CREEK GREENWAY
LIMIT OF CONSTRUCTION
13-0001
.5
FOWLER PARK CONNECTION
BIG CREEK GREENWAY PHASE 2/3
BEGIN PROJECT
1500 3000 6000
SCALE IN FEET
FOWLER PARK CONNECTION
REHABILITAION2/3BOARDWALK
BIG CREEK GREENWAY
END PROPOSED
FOWLER PARK BOARDWALK
Utilities Protection Center, Inc.
INDEX & GENERAL NOTES
04-0001
PROJECT GENERAL NOTES
ANY DAMAGE TO THE EXISTING SANITARY SEWER AS A RESULT OF THE TRAIL REPAIR WORK WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. IN THE EVENT OF AN INCIDENT, THE CONTRACTOR SHALL ALERT THE COUNTY OF THE POSSIBLE DAMAGE IMMEDIATELY.
10. SANITARY SEWER EXISTS ALONG MUCH OF THE TRAIL SEGMENT IN THE VICINITY OF THE WORK ZONE. THE CONTRACTOR SHALL HAVE THE LINE MARKED PRIOR TO BEGINNING WORK AND SHALL PROTECT THE SEWER AT ALL TIMES AND ESPECIALLY DURING POST REMOVAL AND REPLACEMENT.
9. ALL AREAS OF CONSTRUCTION SHALL BE PROTECTED BY SILT FENCE ALONG THE LIMITS OF THE 20' TRAIL EASEMENT.
8. WHERE THE REPLACEMENT OF SLAB ON GRADE IS NOTED TO BE RAISED, GRADE SHALL NOT EXCEED THE ADA REQUIREMENT OF 5% MAXIMUM SLOPE.
7. WHERE THE BOARDWALK IS NOTED TO BE RAISED, EACH SPAN SHALL RAISE IN PROFILE NO MORE THAN 5" PER SPAN TO COMPLY WITH ADA REQUIREMENT OF 5% MAXIMUM SLOPE.
6. ALL PROPOSED BOARDWALK 30" AND ABOVE THE FINISHED GROUNDLINE SHALL HAVE RAILING AS DETAILED ON THE STRUCTURAL BOARDWALK PLANS.
5. THE PROPOSED BOARDWALKS SHALL BE CONSTRUCTED FROM THE TOP DOWN. NO HEAVY EQUIPMENT IS PERMITTED TO BE WITHIN WETLANDS OR STREAMS AT ANY TIME.
4. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL PROVIDE THE COUNTY WITH A DETAILED CONSTRUCTION ACCESS AND STAGING AREA PLAN FOR REVIEW AND APPROVAL.
WORK ZONE IS LIMITED TO THE TRAILHEAD AREAS AND THE 20' WIDE TRAIL EASEMENT.
3. THE ACCESS POINTS AND STAGING AREAS FOR THE DEMOLITION AND CONSTRUCTION OF THE BOARDWALKS AND AT-GRADE TRAIL SEGMENTS ARE LOCATED AT FOWLER PARK TRAILHEAD, SEE SHEET 19-0001 FOR SPECIFIC LOCATIONS. THE CONTRACTORS
2. THE BOARDWALK AND REPLACEMENT OF SLAB ON GRADE SHALL BE REPLACED ON THE EXISTING ALIGNMENT AND PROFILE UNLESS OTHERWISE NOTED ON PLANS.
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE GDOT STANDARD SPECIFICATIONS, CURRENT EDITION, UNLESS OTHERWISE NOTED ON THE PLANS.
UTILITY OWNER SERVICE
THE FOLLOWING UTILITY OWNERS HAVE FACILITIES ON THIS PROJECT:
SANITARY SEWERFORSYTH COUNTY WATER AND SEWER
GEORGIA POWER COMPANY ELECTRIC
ELECTRIC
MEMBERSHIP CORPORATION
SAWNEE ELECTRIC
UTILITIES
below.
R before you dig.
Know what's
Call
(FT)
PROPOSED LENGTH
BOARDWALK
FOWLER PARK
STRUCTURE (FT)
EXISTING LENGTH
STRUCTURE LOCATION SUMMARY TABLE
MARKERS
BETWEEN MILE
4.7-4.8 685 685
FOWLER PARK
LL LL
REVISION DATES
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_04-0001.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
4:27:30 PM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
REHABILITATION FOWLER PARK CONNECTION
BIG CREEK GREENWAY PHASE 2/3
TRAIL MAINTENANCE/REPLACEMENT SUMMARY
LENGTHTYPE DETAILED SCOPE OF WORKSEGMENT
NUMBER/TRAIL
STRUCTURE
FOWLER PARK
BOARDWALK
685'
SCOPE OF WORK
ENTIRE BOARDWALK REPLACEMENT WIDEN TO 12'.REMOVE AND RECONSTRUCT BOARDWALK SUPERSTRUCTURE AND SUBSTRUCTURE. HELICAL PILES
SUMMARY OF CHANGES
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001TP 1 RIP RAP 50'RTRIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
PHASE 2/3
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
PHASE 2/3
PHASE 2/3
PHASE 2/3
50'RT
50'LT
50' LT,RT
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
TP 1 RIP RAP
TP 1 RIP RAP
Utilities Protection Center, Inc.
GENERAL NOTES
04-0002
PROJECT GENERAL NOTES CONT.
36. SECURITY FENCE FOR STAGING SHALL BE INCLUDED IN COST OF GRADING COMPLETE.
35. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATOR THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.
IMPLEMENTED TO CONTROL TO TREAT THE SEDIMENT SOURCE.
34. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
33. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
32. MILE MARKER LOCATIONS ARE SHOWN FOR REFRENCE ONLY. FIELD CONFIRM LOCATIONS WITH COUNTY PRIOR TO CONSTRUCTION.
31. CONCRETE SIDEWALK REMOVAL SHALL BE INCLUDED IN COST OF GRADING COMPLETE. ESTIMATED QUANTITY OF SIDEWALK TO BE REMOVED IS 50 SY.
TO OR BETTER THAN THE EXISTING CONDITION BY THE CONTRACTOR AT NO COST TO THE OWNER.
30. CONTRACTOR SHALL PROTECT ALL ADJACENT LANDS FROM DAMAGE DURING DEMOLITION WORK. ANY DAMAGE TO ADJACENT ROADS, WALKS AND OTHER EXISTING FACILITIES CAUSED BY CONTRACTORS SHALL BE REPAIRED TO A CONDITION EQUAL
29. ALL NECESSARY PERMITS FOR DEMOLITION SHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO BEGINNING WORK.
28. ALL WASTE FROM DEMOLITION OPERATIONS SHALL BE HAULED OFFSITE AND DISPOSED OF LEGALLY.
27. THE CONTRACTOR SHALL LEAVE THE SITE IN A CLEAN AND NEAT CONDITION. ALL DEBRIS, VEGETATION WHICH HAS BEEN REMOVED, LUMBER, CONCRETE, ETC., SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED.
26. THE LAYOUT OF TRAIL IS SHOWN IN RELATION TO BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY THE LAYOUT WITH OWNER PRIOR TO CONSTRUCTION OF TRAIL.
25. SEDIMENT AND EROSION CONTROL MEASURES TO BE INSPECTED DAILY. MAINTAIN BMPS THROUGHOUT LAND DISTURBANCE ACTIVITY.
24. INSTALL TRAIL PAVING AS SHOWN ON PLANS AND SEED ANY BARE AREAS.
23. PLACE CONSTRUCTION EXITS AND INSTALL PERIMETER BMPS AS SHOWN ON PLANS.
22. ALL FILL AREAS MUST BE COMPACTED TO A MINIMUM 95% STANDARD PROCTOR.
21. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN PLAN AND FIELD CONDITIONS PROMPTLY UPON DISCOVERY.
20. MAX CUT OR FILL SLOPES SHALL BE 2:1 (H:V), UNLESS SPECIFICALLY NOTED.
19. DIRT FOR FILL SHALL BE CLEAN, FREE OF DEBRIS, ORGANICS, DELETERIOUS MATERIAL AND ROCKS GREATER THAN 3" DIA. SEE GEORGIA STANDARD SPECIFICATIONS FOR SUITABLE SOIL TYPES FOR FILL.
18. A NOTICE OF INTENT IS NOT REQUIRED FOR THIS PROJECT.
COST TO THE COUNTY.
17. THERE IS NO SUITABLE PLACE TO BURY THE CONSTRUCTION DEBRIS WITHIN THE PROJECT'S LIMITS. THE CONTRACTOR SHALL PROVIDE AN ENVIRONMENTALLY APPROVED SITE TO DISPOSE OF THE EXISTING CONSTRUCTION DEBRIS AT NO ADDITIONAL
16. ALL STORM DRAIN PIPES WITHIN THE AREA OF WORK ARE TO BE COMPLETELY CLEANED OF ALL SILT AND DEBRIS AT THE COMPLETION OF CONSTRUCTION.THE CONTRACTOR SHALL INCLUDE THIS COST IN THE GRADING COMPLETE BID ITEM.
15. CONTRACTOR IS CAUTIONED ABOUT THE PRESENCE OF UNDERGROUND UTILITIES AT OR NEAR THE PROPOSED IMPROVEMENTS THROUGHOUT THIS PROJECT.
14. AFTER ALL NEW CONSTRUCTION IS COMPLETED CONTRACTOR SHALL PRESSURE WASH THE TRAIL. THE CONTRACTOR SHALL INCLUDE THIS COST IN THE "GRADING COMPLETE" BID ITEM.
CONTROL DEVICES, 2025 EDITION AND MAINTAINED WHEN WORKING IN CLOSE PROXIMITY TO PUBLIC ROADS.
13. NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL DEVICES AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC SHALL BE PROVIDED IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC
12. DIMENSIONS ARE TO FACE OF STRUCTURE AND CENTER LINE OF TRAIL, UNLESS OTHERWISE NOTED.
11. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS SHOWN PRIOR TO ANY CONSTRUCTION AND SHALL PROMPTLY NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
below.
R before you dig.
Know what's
Call
REVISION DATES
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_04-0001.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
4:27:30 PM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
05-0001
TYPICAL SECTIONS & DETAILS
VARIES 2'-0" 2'-0" VARIES
SHOULDER SHOULDER
LC MULTI-USE TRAIL
6"
A
B
C
- CONCRETE SIDEWALK - 6 IN THICK
- GRADED AGGREGATE OR STABILIZED BASE CRS - 6 IN THICK
- COMPACTED SUBGRADE
A
B
C
2%
2%
PGL
12'-0"
2:
1 M
AX
2:1
MAX
IN DIRECTION OF FLOW
2% MAX CROSS SLOPE
BOARDWALK CONCRETE TRAIL
SILT FENCE, TYP.
1'-0", TYP.
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:27:47 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
EXISTING 20' EASEMENT FOR BOARDWALK/TRAIL
TYPICAL SILT FENCE PLACEMENT
CONSTRCTION, TYP.
BOARDWALK OR TRAIL
50'-0" PAST END OF
CONTINUE SILT FENCE
TYPICAL SECTION 1 - REPLACEMENT OF SLABS ON GRADE
WITHIN PROJECT EASEMENT
TO PROVIDE POSITIVE DRAINAGE
PGL OR SUFFICIENT HEIGHT
A MINIMUM OF 6" FROM EXISTING
SLAB ON GRADE SHALL BE RAISED
NOTE:
EXISTING TRAIL
FOWLER PARK BOARDWALK
2 FT
SHOULDER EROSION REHABILITATION DETAIL
BIG CREEK GREENWAY PHASE 2/3
REHABILITATION FOWLER PARK CONNECTION
SEE CONTRUCTION PLAN FOR LOCATIONS
2.5 FT
OBF
4:1
TRAIL AT-GRADE
TYPE(NO.57)
STONE PLAIN RIP RAP
EXIST. GROUND
05-0002
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:27:49 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
SUBSTRUCTURE - STEEL SUPPORTS ON HELICAL PILES
SUPERSTRUCTURE - TIMBER DECK ON STEEL STRINGERS
TYPICAL SECTION 2:
12'-0"
6'-0"6'-0"
CL
BIG CREEK GREENWAY
PILE
STEEL HELICAL STEEL CAP
FOWLER PARK BOARDWALK
WALKING SURFACE
GROUNDLINE
EXISTING
BIG CREEK GREENWAY PHASE 2/3
REHABILITATION FOWLER PARK CONNECTION
BOARDWALK AND SAFETY RAIL DETAILS
SEE STRUCTURAL BOARDWALK PLANS FOR
NOTE:
SEE SHEET 35-0002
FOR RAILING DETAIL WHERE REQUIRED
SEE STRUCTURAL PLANS
05-0003
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:27:50 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
05-0004
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:28:08 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
05-0005
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:28:17 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
05-0006
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:28:24 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
05-0007
DRAWING No.DATE:
DATE:
DATE:
DATE:
FORSYTH COUNTY
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
NOT TO SCALE
REVISION DATES
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
4:28:33 PM J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_05-0001.dgn
06-0001
SUMMARY QUANTITIES
SUMMARY QUANTITIES
TOTAL
GRADING COMPLETE
TOTAL
TOTAL
CONSTRUCT AND REMOVE CONSTRUCTION EXITS
1 LS
1 EA
1 EA
AC
FERTILIZER
MIXED
GRADE
LIME
AGRICULTURAL
CONTENT
NITROGEN
FERTILIZER
LBTNQUANTITY TN
PERMANENT GRASSING
UNIT
GRASSING
151 0.050.3
MAINTENANCE OF CONSTRUCTION EXIT
TEMPORARY GRASSING AC 0.2
MULCH
TN
0 0.03 0 1
TOTAL
GR AGGR BASE CRS, 6 INCH, INCL MATL
TOTAL
CONCRETE TRAIL PAVING, STANDARD, 6 IN
TOTALS 0.5 1 0.08 15 2
TOTAL
FENCE, TP C
MAINTENANCE OF TEMPORARY SILT
TOTAL
TEMPORARY SILT FENCE, TYPE C
TOTALTOTAL
SOLID TRAFFIC STRIPE, 5 IN, WHITE
TOTAL 1 LS
BOARDWALK
REMOVAL OF EXISTING BR, FOWLER PARK SPUR
TOTAL 5220 LF
HELICAL PILE- FOWLER PARK SPUR BR
52 LM
1600 LF
800 LF
TOTAL
TIMBER CURB
1170 LF
50 SY
17 SY
TOTAL
BARRIER FENCE (ORANGE), 4 FT
1600 LF
TOTAL
STN DUMPED RIP RAP, TP 1, 24 IN
67 SY
TOTAL
PLASTIC FILTER FABRIC
84 SY
TOTAL
TIMBER SAFETY RAIL
200 LF
TOTAL 15.5 TN
TOTAL 1 EA
(PER DAY)
CONTRUCTION EXIT TIRE CLEANING STATION
TOTAL 1 LS
BOARDWALK
TOTAL 1 EA
HELICAL PILE LOAD TEST (AS DIRECTED)
STONE PLAIN RIP RAP TYPE(NO.57)
REVISION DATES
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_06-0001.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
4:28:50 PM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
Co
S
Co
CONSTRUCTION PLAN
13-0001
LL
LL
550 531
LL
LL
LL
530 479
LL
L L
L L
LL
458479
LL
LL
478 459
LL
LL
532 477
LL
LL LL
LL
549 531
LL
LL
ESA - 25' STREAM BUFFER
ESA - 25' STREAM BUFFER
LINE (TYPICAL)
APPROX. TREE CANOPY
A T
L A
N
A
H W
Y S
T A
E
R O
U T
E
EL:1,012.587
E:2,281,145.967 N:1,509,475.455
NAIL AT ARROW TIP
BENCHMARK
EL:1,042.306
E:2,281,982.937 N:1,511,919.871
NAIL AT END OF PAINT STRIPE
BENCHMARK
KEY PLAN
ATLANTA HIGHWAY/FOWLER
PARK ENTRANCE
BETHELVIEW ROAD TRAILHEAD
FOWLER PARK CONNECTOR
TRAIL MAINTENANCE/REPLACEMENT SUMMARY
LENGTHTYPE DETAILED SCOPE OF WORKSEGMENT
NUMBER/TRAIL
STRUCTURE
FOWLER PARK
BOARDWALK
685'
SCOPE OF WORK
ENTIRE BOARDWALK REPLACEMENT WIDEN TO 12'.REMOVE AND RECONSTRUCT BOARDWALK SUPERSTRUCTURE AND SUBSTRUCTURE. HELICAL PILES
SUMMARY OF CHANGES
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001TP 1 RIP RAP 50'RTRIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
PHASE 2/3
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
RIP RAP INSTALLATION
TRAIL EROSION MAINTENANCE -
PHASE 2/3
PHASE 2/3
PHASE 2/3
50'RT
50'LT
50' LT,RT
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
INSTALL RIP RAP TO COUNTERACT EROSION PER THE DETAIL PROVIDED ON SHEET 05-0001
TP 1 RIP RAP
TP 1 RIP RAP
TP 1 RIP RAP
FOWLER PARK CONNECTION
/3 REHABILITATION2PHASE
BIG CREEK GREENWAY
LIMIT OF CONSTRUCTION
E 2281157.0393 N 1509480.4155
TIE TO EXISTING TRAIL
APPROX. 55' FROM MILE MARKER 4.7
END BOARDWALK REPLACEMENT
FOWLER PARK BOARDWALK
E 2281799.2829 N 1509537.0039
TIE TO EXISTING TRAIL
BEGIN BOARDWALK REPLACEMENT
E 2282357.7402 N 1507971.8800
FOWLER PARK CONNECTION
BIG CREEK GREENWAY PHASE 2/3
BEGIN PROJECT
SEE DETAIL
TRANSITION SLAB REPLACEMENT -
FOWLER PARK CONNECTION
PHASE 2/3 REHABILITATION
BIG CREEK GREENWAY
END PROPOSED
REVISION DATES
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_13-0001.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
4:29:06 PM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
SCALE IN FEET
0 200 400
FORSYTH COUNTY
BIG CREEK GREENWAY PHASE 2/3
REHABILITATION FOWLER PARK CONNECTION
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
ESA - ENV. SENSITIVE AREA
SEWER
OVERHEAD ELECTRICWETLAND
CONSTRUCTION ENTRANCE
BOARDWALK REPLACEMENT
STRUCTURE REMOVAL
Co
BRIDGE
FOR DETAIL05-0001SEE SEE 05-0001 FOR DETAIL SEE 05-0001 FOR DETAIL
E 2281118.7803'
N 1509483.5958'
FOWLER PARK CONNECTION
REHABILITATION2/3 3PHASE
BIG CREEK GREENWAY
LIMIT OF CONSTRUCTION
FOR DETAIL05-0001SEE
N REHABILITATION SHOULDER EROSIO
N REHABILITATION SHOULDER EROSIO N REHABILITATION SHOULDER EROSIO N REHABILITATION SHOULDER EROSIO
FOR BOARDWALK SECTIONS ABOVE 30"
APPROXIMATE BEGIN SAFETY RAIL INSTALL
FOR BOARDWALK SECTIONS ABOVE 30"
APPROXIMATE END SAFETY RAIL INSTALL
SHOULDER REHABILITATION
10'-0" 10'-0" 10'-0" 10'-0"
EXISTING
TRANSITION SLAB TO
C CONTROL JOINTL
L
C CONTROL JOINTL
C EXPANSION JOINT
BOARDWALK
PROPOSED
SLAB ON GRADE TO BOARDWALK TRANSITION REPLACEMENT
10'-0"
Co
STAGING PLANS
19-0001
LL
530 479
LL
L L
L L
E 2282357.7402 N 1507971.8800
FOWLER PARK CONNECTION
BIG CREEK GREENWAY PHASE 2/3
BEGIN PROJECT
REVISION DATES
3/26/2025
USER:jbahena
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\10_DGN-CE\01_Fowler Park Connector\0000001_19-0001.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
4:29:24 PM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
SCALE IN FEET
0 100 400
FORSYTH COUNTY
BIG CREEK GREENWAY PHASE 2/3
REHABILITATION FOWLER PARK CONNECTION
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
ESA - ENV. SENSITIVE AREA
SEWER
OVERHEAD ELECTRICWETLAND
CONSTRUCTION ENTRANCE
BOARDWALK REPLACEMENT
STRUCTURE REMOVAL
Co
BRIDGE
LINE (TYPICAL)
APPROX. TREE CANOPY
BETHELVIEW ROAD TRAILHEAD
PARK ENTRANCE
ATLANTA HIGHWAY/FOWLER
FOWLER PARK CONNECTOR
KEY PLAN
SECURITY FENCE, TYP
ACCESSS GATE
MATERIAL STAGING AREA
MATERIAL STAGING AREA
SECURITY FENCE, TYP
ACCESSS GATE
BOARDWALK SUPERSTRUCTURE DETAILSSCALE: ¾"=1'-0"
(UNLESS NOTED OTHERWISE)
SCALE IN INCHES
0 32 64
TYPICAL FRAMING PLAN
35-0001
STRINGER AND DECK DETAILS SIMILAR TO SECTION THROUGH HANDRAIL
BOARDWALK TYPICAL SECTION WITH HANDRAIL
BOARDWALK TYPICAL SECTION WITH TOE CURB
USE HANDRAIL WHEN WALKING SURFACE IS HIGHER THAN GROUND BY 30"
USE HANDRAIL WHEN WALKING SURFACE IS HIGHER THAN GROUND 30"
WALKING SURFACE
6'-0"6'-0"
12'-0"
3'-6"
6'-0"6'-0"
12'-0"
6X6 TOE CURB
WALKING SURFACE
12'-0" MAX, AT OUTSIDE STRINGER
6'-0" TO 12'-0" AT CENTERLINE
W6X15 CAP BEAM
W6X15 STINGERS
6X6 HANDRAIL POST
4X6 BLOCK B/W POST AND STRINGER
5'-0" MAX SPACING, TYP
STRINGER TO CAP BEAM ATTACHMENT DETAIL
1"
1"
�" DIA SLOT
�" DIA SLOT
WITH JAM NUT
SNUG TIGHT
½" DIA BOLT
WITH JAM NUT
SNUG TIGHT
½" DIA BOLT
EXTERIOR STRINGER INTERIOR STRINGER
W6X15 CAP BEAM
W6X15 CAP BEAM
E
Q U
A L
S P
A C
E S
SCALE: 1½" = 1'-0"
TOP VIEW TOP VIEW
SIDE VIEW SIDE VIEW
HANDRAIL SHOWN ONLY ON ONE SIDE. OTHER SIDE DEPICTS TOE CURB SECTIONS
UNDER STRINGER WEB
¼" STIFFENER
1⅝"
1⅝" FOR TOE CURB
⅝" FOR HANDRAIL
c BRIDGE c BRIDGE
2X4 STRUT
"W6X15 STRINGERS
HANDRAIL
42" TIMBER
600 PSF
2'-0" X 7'-6" TRACKS
7'-0"
APPROVAL BY THE ENGINEER.
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE STEEL BEAMS FOR REVIEW AND 12.
CONSTRUCTABILITY USING AVAILABLE EQUIPMENT.
FOR TOP DOWN CONSTRUCTION, CONTRACTOR SHALL DETERMINE SPAN LENGTH BASED ON 1 1.
SEE SUBSTRUCTURE SHEET FOR FOUNDATION NOTES.10.
WHICH MAY BE UC4A WITH .15 CA-C RETENTION.
RETENTION WITH THE EXCEPTION OF DECKING, HANDRAIL POSTS, RAILS AND TOE CURB
ACCORDANCE WITH THE REQUIREMENTS OF AWPA STANDARD UC4B WITH .31 CA-C
ALL WOOD COMPONENTS SHALL BE PRESSURE IMPREGNATED WITH WOOD PRESERVATIVE IN 9.
SOUTHERN PINE NO. 1.
ALL LUMBER SHALL BE VISUALLY GRADED, SOUTHERN PINE INSPECTION BUREAU (SPIB) 8.
BASE CONNECTIONS.
ARE IN CONTACT WITH WOOD. PLATE WASHERS SHALL BE PROVIDED AT HANDRAIL POST
WASHERS SHALL BE PROVIDED UNDER BOLT AND LAG SCREW HEADS AND NUTS THAT 7.
SCREWS AND NAILS SHALL BE STAINLESS STEEL. 6.
WASHERS SHALL BE GALVANIZED ACCORDING TO ASTM A153.
SHALL BE ASTM F844 AND PLATE WASHERS SHALL BE ASTM F436.BOLTS, NUTS, AND
BOLTS SHALL BE ASTM A307 GRADE A. NUTS SHALL BE ASTM A563. REGULAR WASHERS 5.
535 OF THE GEORGIA DOT SPECIFICATIONS.
STEEL BEAMS: ASTM A992 GRADE 50 PAINTED WITH PAINT SYSTEM tw AS PER SECTION 4.
ASSUMED CONSTRUCTION LOAD = 18,000 LBS (INCLUDING ATTACHMENTS)
SUBMIT CALCULATIONS FOR APPROVAL.
SHALL VERIFY THE ADEQUACY OF THE TRUSS BRIDGES FOR THE PROPOSED LOADS AND
CALCULATIONS FOR APPROVAL IF IT DIFFERS FROM THE ASSUMED LOADING. CONTRACTOR
SHOWN BELOW. CONTRACTOR SHALL SUBMIT PROPOSED LOADING CONFIGURATION AND
CONSTRUCTION LOADING: BOARDWALK HAS BEEN DESIGNED FOR THE ASSUMED LOADING 3.
H-5 TRUCK (NO IMPACT) VEHICULAR LOADING:
90 PSFPEDESTRIAN LOADING:
BOARDWALK IS DESIGNED FOR THE FOLLOWING LOADS:2.
EDITION, 2002, AWC NDS 2015 AND AISC STEEL CONSTRUCTION MANUAL 14TH EDITION, 201 1.
BOARDWALK IS DESIGNED IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS 17TH 1.
GENERAL NOTES:
METAL SCREWS PER STRINGER.
SELF-DRILLING WOOD TO
(2) #14 X 4" EXTERIOR RATED
3X8 DECKING FASTENED WITH
BETWEEN DECK BOARDS.
PROVIDE ¼" SPACING
AT EACH END OF EACH BOARD.
RATED CARRIAGE BOLTS. 2 REQ'D
" EXTERIOR 2
1" DIA X 3 4
1WITH
3X8 DECKING DRILLED & SECURED
1½" TYP.
#10 X 3" SCREWS
WEB AND FASTEN USING (4)
POST PRE DRILL STRINGER
2X6 BLOCKING AT HANDRAIL
AHEAD
REVISION DATES
3/21/2025
USER:dbrown
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\07_Bridge\02_Fowler Park_Phase X\35-0001 - Alt 1 - Superstructure Details.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
10:46:42 AM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
00001
P.I. No.
FOWLER PARK CONNECTION
2/3 REHABILITATIONPHASE
DATE
X/X/20XX
BOARDWALK RAILING DETAILSSCALE: ¾"=1'-0"
(UNLESS NOTED OTHERWISE)
SCALE IN INCHES
0 32 64
SCALE: 1½" = 1'-0"
35-0002
WASHER UNDER HEAD
" DIA PLATE2
ON POST USE 2
(2) ⅝" DIA BOLTS CENTERED
3X8 TREX FACIA BOARD
AND STRINGER, TIGHT-FIT
4X6 BLOCK B/W POST
½
STRINGER, TYP
W6X15
½"
FASTENED WITH (2) #10 X 3" SCREWS
4 - 2X6 RAILS
2X6 BLOCKING
TIMBER HANDRAIL DETAIL
2X4 STRUT WITH ⅝" BOLTS
SECTION A-A
SCALE: 1½" = 1'-0" SCALE: 1½" = 1'-0"
TOE CURB DETAIL
2X6 BLOCKING
¼" STIFFENER, TYP
¼" PLATE, TYP
6X6 BLOCK
A
A
FASTEN USING (4) #10 X 3" SCREWS
PRE DRILL STRINGER WEB AND
2X6 BLOCKING AT TOE CURB BLOCK
¼ ¼" STIFFENER, TYP
½
1'-3"p
1½"
STRINGER
BOTTOM OF
AT POST, TYP
¼" GAP REQUIRED AT POST, TYP
¼" GAP REQUIRED 6X6 BLOCK
REVISION DATES
3/21/2025
USER:dbrown
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\07_Bridge\02_Fowler Park_Phase X\35-0002 - Railing Details.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
10:47:42 AM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
FOWLER PARK CONNECTION
2/3 REHABILITATIONPHASE
DATE
X/X/20XX
POST
6X6 HANDRAIL
6X6 TOE CURB
(2) ⅝" DIA CARRIAGE BOLT
35-0003
BOARDWALK SUBSTRUCTURE DETAILS
TYPICAL BENT AT LOW ELEVATION
SCALE: ¾"=1'-0"
(UNLESS NOTED OTHERWISE)
SCALE IN INCHES
0 32 64 j3X3X½, TYP
¼
TYP
PROVIDE AT EVERY BENT
TRANSVERSE BRACING
M I N
M A
X
O
M
A X
PILE CAP, TYP
TRANSVERSE BRACING SHOWN, LONGITUDINAL BRACING SIMILAR
W6X15 CAP BEAM
W6X15 CAP BEAM
2'-6"7'-0"2'-6"
2'-6"7'-0"2'-6"
PILE CAP, TYP
¼
¼
EXISTING GROUND LINE, EL X
EXISTING GROUND LINE, EL X
PROVIDE AT ALTERNATE SPANS
LONGITUDINAL BRACING
¼" STIFFENER UNDER STRINGER WEB, TYP
STIFFENER DETAIL
½" CLIP TYP
SCALE: 1½" = 1'-0"
FOR BATTER DETAIL
SEE PILE LAYOUT
HELICAL PILE, TYP
M A
X
FOR BATTER DETAIL
SEE PILE LAYOUT
HELICAL PILE, TYP
¼" STIFFENER
BRACING DETAIL AT HEIGHT 2'-0" - 6'-0"
SEE SHEET 35-0005 FOR DETAILS AT ABUTMENTS.8.
REGISTERED IN THE STATE OF GEORGIA.
ENGINEER FOR APPROVAL AS PER HELICAL PILE SPECIFICATIONS. DESIGN SHALL BE SEALED BY AN ENGINEER, CONTRACTOR SHALL SUBMIT HELICAL PILE DESIGN AND HELICAL PILE CONTRACTOR QUALIFICATIONS TO 7.
WELDING, APPLY COLD GALVANIZING COMPOUND OVER THE WELDED AREA ACCORDING TO ASTM A780.
PREPARATION AND WELDING OF GALVANIZED SURFACES SHALL BE ACCORDING TO AWS GUIDELINES. AFTER 6.
ASTM A123.
HSS SECTIONS SHALL BE ASTM A500 GRADE B AND AND SHALL BE HOT DIP GALVANIZED ACCORDING TO 5.
A123.
CHANNEL, ANGLE, AND PLATE SHALL BE ASTM A36 AND SHALL BE HOT DIP GALVANIZED ACCORDING TO ASTM 4.
AND SHALL BE CAPABLE OF HANDLING DESIGN LOADS. MIN CAP PLATE SIZE = 8" X 8".
HELICAL PILES AND PILE CAP SHALL BE GALVANIZED. PILE CAP SHALL BE COMPATIBLE WITH HELICAL PILE 3.
MINIMUM PILE TIP ELEVATION OF (X - 5'-0" ) SHALL BE ACHIEVED.2.
DESIGN SERVICE AXIAL COMPRESSION = 16 KIPS
SERVICE LOADS:
FOR A MINIMUM FACTOR OF SAFETY OF 2 BETWEEN ALLOWABLE PILE LOAD AND THE FOLLOWING DESIGN HELICAL PILE SECTIONS SHALL BE CHANCE HELICAL SOLUTIONS RS2875.203 OR APPROVED EQUAL DESIGNED 1.
FOUNDATION NOTES:
REVISION DATES
3/21/2025
USER:dbrown
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\07_Bridge\02_Fowler Park_Phase X\35-0003 - Substructure Details.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
10:48:13 AM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
FOWLER PARK CONNECTION
2/3 REHABILITATIONPHASE
35-0004
BOARDWALK PILE BATTER LAYOUT
45°00'00" c BOARDWALK c BENT, TYP
12'-0" MAX, TYP
PILE CAP
BATTERED HELICAL PILE, TYP
SCALE: ¾"=1'-0"
(UNLESS NOTED OTHERWISE)
SCALE IN INCHES
0 32 64
AHEAD
BATTERED PILE LAYOUT
REPEAT PATTERN
INDICATES DIRECTION OF 1½: 12 BATTER
REVISION DATES
3/21/2025
USER:dbrown
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\07_Bridge\02_Fowler Park_Phase X\35-0004 - Battered Pile Layout.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
10:48:49 AM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
FOWLER PARK CONNECTION
2/3 REHABILITATIONPHASE
35-0005
BOARDWALK ABUTMENT DETAIL
HELICAL PILE
ABUTMENT DETAIL
SCALE: ¾"=1'-0"
(UNLESS NOTED OTHERWISE)
SCALE IN INCHES
0 32 64
GROUND LINE
EXISTING
SECTION J-J
JJ
#5 BARS AT 8"
¼
AT ABUTMENT
PILE CAP DETAIL
SMOOTH DOWEL
3" X ¾" DIA
SCALE: 1½" = 1'-0"
10"8"
3" CL, TYP
6 - #5 BARS
4 - #5 BARS
TOP OF CONCRETE TRAIL
UNDER ALL STEEL STRINGERS
4" X 5" X ⅛" BEARING PAD
F R
O M
E D
G E
O F
T R
A
IL
3'-0
8"
#5 BARS AT 8"
3" CL
ABUTMENT REINFORCEMENT DETAIL
#5 BAR AT 8"
c PILE, TYP
V A
R
IE
S
TOP OF DECK
BOTTOM FLANGE OF STRINGER
CONCRETE ANCHOR THRU
PLACE OR POST INSTALLED
½" X 3½" MIN CAST IN
½
½
REGISTERED IN THE STATE OF GEORGIA.
HELICAL PILE SPECIFICATIONS. DESIGN SHALL BE SEALED BY AN ENGINEER,
CONTRACTOR QUALIFICATIONS TO ENGINEER FOR APPROVAL AS PER
CONTRACTOR SHALL SUBMIT HELICAL PILE DESIGN AND HELICAL PILE 4.
CAPABLE OF HANDLING DESIGN LOADS. MIN CAP PLATE SIZE = 8" X 8".
PILE CAP SHALL BE COMPATIBLE WITH HELICAL PILE AND SHALL BE 3.
MINIMUM PILE TIP ELEVATION OF (X - 5'-0" ) SHALL BE ACHIEVED.2.
DESIGN SERVICE AXIAL COMPRESSION = 16 KIPS
DESIGN SERVICE LOADS:
SAFETY OF 2 BETWEEN ALLOWABLE PILE LOAD AND THE FOLLOWING
RS2875.203 OR APPROVED EQUAL DESIGNED FOR A MINIMUM FACTOR OF
HELICAL PILE SECTIONS SHALL BE CHANCE HELICAL SOLUTIONS 1.
FOUNDATION NOTES:
W6X15 STINGERS
E
Q U
A L
S P
A C
E S
SEE CONTRACT PLANS FOR DETAILS
¼
¼
¼
¼
EDGE OF EXISTING ABUTMENT
CAP BEAM
c BENT c BENT
BEAMS, TYP
AT EXTERIOR
BEAMS, TYP
AT INTERIOR
BEAMS, TYP
AT EXTERIOR
BEAMS, TYP
AT INTERIOR
4'-0" MAX CANTILEVER8'-0" TO 12'-0" AT CENTERLINE
12'-0" MAX, AT OUTSIDE GIRDER
FRAMING PLAN AT TRANSITION TO EXISTING BRIDGE ABUTMENT
⅛" MAX GAP, TYP
REVISION DATES
3/21/2025
USER:dbrown
$PRF8$
S:\GDOT_V8i\Plot Drivers\PLOT-CONFIG_microstation-V8i\HLEGDOT_Pen_table.tbl
J:\1023020 Big Creek Greenway Eng Svc\0000001\07_Bridge\02_Fowler Park_Phase X\35-0005 - Abutment Detail.dgn
R
E F
F
IL
E
R
E F
R
E F
R
E F
R
E F
10:49:23 AM
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
FOWLER PARK CONNECTION
2/3 REHABILITATIONPHASE
File details come from the government source that posted it. Updated .