14-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf
PDF 207 MB Posted
- Solicitation number
- 25-69-1514
- Issued by
- Fayette County, Georgia
About this file
The document is a technical design file for 14-30% Design Drawings related to the Big Creek Greenway Rehabilitation project in Georgia, specifically covering Phases 23, Segment 5 from Mile Marker 6.8 to the Bethelview Trailhead. The file appears to be part of a progressive design-build services contract that involves detailed design documentation for a greenway rehabilitation project. The drawings represent an intermediate design stage (14-30% completion) for a specific segment of the trail, focusing on the segment between mile marker 6.8 and the Bethelview Trailhead.
The project is located in Georgia and is associated with a state and local contract opportunity for progressive design-build services. While specific pricing details are not explicitly visible in the provided document, the project seems to be a public infrastructure improvement initiative involving trail design and rehabilitation. The progressive design-build approach suggests a collaborative process where design and construction services are integrated, potentially allowing for more flexibility and efficiency in project delivery. The document indicates a focused effort on developing detailed design drawings for a specific segment of the Big Creek Greenway, which likely aims to improve recreational infrastructure and connectivity in the region.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .