20-Addendum 2 RFP 25-69-1514.pdf
PDF 90 KB Posted
- Solicitation number
- 25-69-1514
- Issued by
- Fayette County, Georgia
About this file
This document is Addendum #2 for a Request for Qualifications (RFQ) issued by Forsyth County Procurement in Georgia for the Progressive Design Build Big Creek Greenway Rehabilitation project. The RFQ was initially solicited on June 18, 2025, with this addendum dated July 3, 2025, and is identified by the number 25-69-1514. The addendum addresses a specific request from a potential bidder regarding the availability of Phase 4 Segment 2 concept drawings, which the county confirms have been added for download.
The addendum serves to supplement and potentially modify the original bidding documents, ensuring that all potential bidders have access to the most current project information. The document is signed by Adrian Casey, Procurement Director, who can be contacted at acasey@forsythco.com or by telephone at 770-888-8872. The addendum maintains that where any original requirements are supplemented, amended, or superseded, the remaining provisions shall continue to be in effect, providing clarity and continuity for the bidding process.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 25-69-1514 Addendum #2
Forsyth County Procurement
Adrian Casey, Director
ADDENDUM #2
RFQ Number: 25-69-1514 Title: Progressive Design Build Big Creek
Greenway Rehabilitation
Date: July 3 , 2025
Issuing Officer: Adrian Casey RFQ Initially Solicited: June 18, 2025
Email Address: acasey@forsythco.com Telephone: 770-888-8872
This addendum supersedes and supplements all portions of the bidding documents and becomes part of the contract documents for the above-referenced project. Where any item called for in the specifications or indicated on the drawings is supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided, or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect.
# Questions Answers
1. We do not see the Phase 4 Segment 2 concept drawings available for download. Can those drawings be provided?
These drawings have been added for download.