28-Addendum 5 RFP 25-69-1514.pdf
PDF 99 KB Posted
- Solicitation number
- 25-69-1514
- Issued by
- Fayette County, Georgia
About this file
Addendum #5 for RFQ 25-69-1514 is issued by Forsyth County Procurement for a Progressive Design-Build Big Creek Greenway Rehabilitation project in Georgia. The Request for Qualifications (RFQ) was initially solicited on June 18, 2025, with this addendum dated August 21, 2025. The document provides clarifications and additional information for bidders, including a newly added Hydrology Report with Appendices. The project is a design-build approach where the Design-Build (DB) Team will be responsible for project design, with construction activity costs to be developed during the Preliminary Stage Work as part of a Guaranteed Maximum Price.
The addendum addresses several key questions from potential bidders, including clarifications on technical proposal page limits (Part 4: Proposer's Experience and Capabilities is confirmed at 7 total pages), confirmation that construction materials testing and inspection will be provided by the County, and the provision of the Bethelview Trailhead Hydrology Report with its accompanying appendices. The document emphasizes that this is a Progressive Design-Build project, meaning the design team will have significant responsibility for developing the project's technical specifications and approach, with costs to be finalized during the preliminary stage of work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 25-69-1514 Addendum #5
Forsyth County Procurement
Adrian Casey, Director
ADDENDUM #5
RFQ Number: 25-69-1514 Title: Progressive Design Build Big Creek
Greenway Rehabilitation
Date: August 21, 2025
Issuing Officer: Adrian Casey RFQ Initially Solicited: June 18, 2025
Email Address: acasey@forsythco.com Telephone: 770-888-8872
This addendum supersedes and supplements all portions of the bidding documents and becomes part of the contract documents for the above-referenced project. Where any item called for in the specifications or indicated on the drawings is supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided, or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect.
File Additions
Additional documents provided in this Addendum:
1. Hydrology Report with Appendices
# Questions Answers
1. We are unable to confirm the distance the engineers are requiring the helicals per each stretch/section of boardwalk in each phase (every six feet, eight feet or ten feet?). The only spec we can see is that the WIDTH of the boardwalk requires two helicals twelve feet apart. We just need the distances required for the LENGTH so that we can accurately estimate the number of helical piers necessary to price out the job.
Please refer to the responses provided in Addendum #4.
This is a Progressive Design-Build project. DB Team is responsible for the project design. Costs for construction activities will be developed at the Preliminary Stage Work as part of the Guaranteed Maximum Price.
RFQ 25-69-1514 Addendum #5
2. In addendum 4, it states in the technical proposal order/breakdown that Part 4:
Proposer's Experience and Capabilities is a maximum of 7 pages. However, the response to question 40 indicated "subcontractor experience/quals should be included within the 5 pg. limit requirement:" Can you please clarify if the page limit for this section is 5 or 7 pages?
Total page limit for Part 4: Proposer’s Experience and Capabilities is 7 pages.
3. Will construction materials testing and inspection be provided by the County, or the design-builder?
Please refer to response provided in Addendum #4.
Construction material testing and inspection will be provided by the County.
4. Please advise if the County will provide Appendices A – N from the “Big Creek Greenway Bethelview Trailhead - Hydrology Report” document.
Please refer to “ Big Creek Greenway Bethelview Trailhead – Hydrology Report with Appendices” provided in this Addendum.