23-Addendum 3 RFP 25-69-1514.pdf

PDF 91 KB Posted

Attached to
Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead
Solicitation number
25-69-1514
Issued by
Fayette County, Georgia

About this file

This document is Addendum #3 for Request for Qualifications (RFQ) 25-69-1514 issued by Forsyth County Procurement in Georgia for the Progressive Design Build Big Creek Greenway Rehabilitation project. The addendum extends the solicitation opening date to August 14, 2025, at 2:00 PM, which will be conducted via the Bonfire platform. The issuing officer is Adrian Casey, and the original RFQ was initially solicited on June 18, 2025.

The addendum serves to supplement and modify the original bidding documents, with the primary change being the date extension. An additional addendum is anticipated to address all submitted questions related to the project. The document includes standard legal language indicating that original requirements remain in effect where not specifically amended, voided, or superseded, and provides contact information for follow-up, including Casey's email (acasey@forsythco.com) and telephone number (770-888-8872).

View the file

Other files

File Type Posted
11-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
20-Addendum 2 RFP 25-69-1514.pdf PDF
10-Plan for the Rehabiliation, Restoration and Renewal 09252019.pdf PDF
19-Sign In Sheet 25-69-1514.pdf PDF
27-Big Creek Greenway Phase 4 - Ecology Survey - Waters - 5-29-25.pdf PDF
29-Big Creek Greenway Bethelview Trailhead - Hydrology Report with Appendices.pdf PDF
1-Specifications for Helical Pile Foundation.pdf PDF
14-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
25-Summary of Work-Revision 1 08072025.pdf PDF
13-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf PDF
16-0. Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
22-Sign in Sheet for Site Visit.pdf PDF
3-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
7-Big Creek Greenway Phases 23 Ecology Survey - Waters 2-9-2024.pdf PDF
2-Summary of Work.pdf PDF
9-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
12-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
5-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
26-Big Creek Greenway Bethelview Trailhead - Hydrology Report.pdf PDF
21-BCG Rehabilitation - Phase 4 Segment 2 60% Plans.pdf PDF
8-100% Design Drawings for Bethelview Trailhead.pdf PDF
6-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
4-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
17-1.1 RFP 25-69-1514 Big Creek GW PDB-Agreement, GCs and SCs.pdf PDF
24-Addendum 4 RFP 25-69-1514.pdf PDF
28-Addendum 5 RFP 25-69-1514.pdf PDF
15-1. RFP 25-69-1514 PDB Big Creek GW.pdf PDF
18-Addendum 1 RFP 25-69-1514.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 25-69-1514 Addendum #3

Forsyth County Procurement

Adrian Casey, Director

ADDENDUM #3

RFQ Number: 25-69-1514 Title: Progressive Design Build Big Creek

Greenway Rehabilitation

Date: July 28, 2025

Issuing Officer: Adrian Casey RFQ Initially Solicited: June 18, 2025

Email Address: acasey@forsythco.com Telephone: 770-888-8872

This addendum supersedes and supplements all portions of the bidding documents and becomes part of the contract documents for the above-referenced project. Where any item called for in the specifications or indicated on the drawings is supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided, or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect.

# Date Change

1. 1

The solicitation opening date has been extended to August 14, 2025, at 2:00 PM via Bonfire. An additional addendum addressing all submitted questions will be issued shortly.

File details come from the government source that posted it. Updated .