29-Big Creek Greenway Bethelview Trailhead - Hydrology Report with Appendices.pdf
PDF 5 MB Posted
- Solicitation number
- 25-69-1514
- Issued by
- Fayette County, Georgia
About this file
This document is a Drainage Report prepared by Heath & Lineback Engineers for the Forsyth County Capital Projects, specifically detailing hydrology and stormwater management for the Bethelview Trailhead parking lot design near Cumming, Georgia. The project covers approximately 3.08 acres, with design services focusing on comprehensive drainage systems, including five distinct drainage basins (Areas 1-5) that utilize various stormwater management techniques such as enhanced dry swales, bioretention areas, and grass channels to manage runoff and water quality.
The hydrology report includes detailed technical calculations for pre-development and post-development conditions, analyzing stormwater flow rates, curve numbers, and storm event impacts for 1-year, 2-year, 25-year, and 100-year storm scenarios. The design incorporates multiple best management practices (BMPs) with specific control structures and underdrain systems to manage stormwater runoff, reduce peak flow rates, and improve water quality. The project aims to minimize environmental impact by implementing engineered solutions that filter, infiltrate, and treat stormwater before discharge, with careful attention to maintaining appropriate freeboard levels and controlling erosion through strategies like riprap placement at discharge points.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drainage Report
Big Creek Greenway Design Services – On Call
Task 1 – Bethelview Trailhead Parking Lot Design
H&L # 1023020.02
For
Forsyth County Capital Projects
Prepared By
May 2024
Heath & Lineback Engineers, Inc.
2390 Canton Road Bldg. 200
Marietta, Georgia 30066
(770) 424-1668 * Fax: (770) 424-2907
1 Table of Contents
1.0 INTRODUCTION
a) Site Location, acreage, and current and proposed land use ………………………………………………
b) Offsite Drainage Areas ………………………………………………………………………………………………………
c) Project Methodology …………………………………………………………………………………………………………
2.0 SUMMAY TABLES
a) Storm event ……………………………………………………………………..………………………………………………..
b) Pre-developed flow rate ………..…………………………………………………………………………………………..
c) Developed flow rate ……………………………………………………………………………………………………………
d) Allowable flow rate ……………………………………………………………………………………………………………..
e) Peak elevation in the stormwater facility …………………………………………………………………………….
f) Developed velocity ………………………………………………………………………………………………………………
Appendix A - Pre-developed Drainage Map Appendix B - Pre-developed Weighted Curve Number Calculations Appendix C - Pre and Post Time of Concentration Calculations Appendix D - Developed Site Map Appendix E - Developed Weighted Curve Number Calculations Appendix F - Details of Water Quality facilities Appendix G - Water Quality Calculations Appendix H - Water Quality Performance Review Tool Appendix I - Pre-developed hydrographs and routings for the 1, 2, 10, 25 100 Year Storms Appendix J - Developed hydrographs and routings for the 1, 2, 10, 25 100 Year Storms Appendix K - Storage Calculations Appendix L - Control Structures Details
1.0 INTRODUCCION
a) Forsyth Bethelview Trail – Site Description
The jobsite, nestled in Cummings, Georgia, just east of Bethelview Road, spans approximately 3.08 acres and resides within a suburban landscape. Adjacent to the Bethelview Road Trailhead, with a gravel parking surface that currently serves the purpose of a parking lot, trees surrounding the area, and overlooking a pond.
The utilities on the jobsite include a 1.5” waterline, an existing culvert pipe structure that channels under the Big Greek Greenway trailhead, and a septic tank. Notably, upon entry, there's a 185-foot stretch of asphalt leading to the site, and electrical lines that run over Bethelview Road. Currently, three (3) designated ADA parking spots, restroom facilities and a warm-up area reside on the site.
Pre-Developed land use
Basin Name
Impervious
Area
(Ac.)
Pervious
Area
(Ac.)
Total
Area
(Ac.)
Area 1 (NW) 0.0000 0.4371 0.4371
Area 2 (NE) 0.0280 0.2631 0.2911
Area 3 (SE) 0.5413 0.0100 0.5513
Area 4 (S) 0.1703 0.0100 0.1803
Area 5 (SW) 0.4407 0.0100 0.4507
Total (Ac.) 1.1803 0.7302 1.9105
b) Offsite drainage areas
The Offsite Drainage Area of 0.44 Ac. has been identified in Drainage Maps as Basin 1, please refer to
Appendix A (Pre-developed) and Appendix D (Developed).
c) Project Methodology
The proposed drainage system has been divided into two main basins: Basin 1 and Basin 2. Basin 1 includes Area 1 (NW) with a total area of 0.44 Ac which runoff will be intercepted by Swale 1 (BMP 1), and
Area 2 (NE) with a total area of 0.73 Ac which runoff will be intercepted by Swale 2 (BMP 2). Basin 2 includes Area 3 (SE) with a total area of 0.55 Ac which runoff will be intercepted by Swale 3 (BMP 3); Area
4 (S) with a total area of 0.18 Ac which runoff will be intercepted by Swale 4 (BMP 4), and Area 5 (SW) with a total area of 0.45 Ac which runoff will be intercepted by Swale 5 (BMP 5).
a) BMP 1 & BMP 2
To eliminate contaminants through vegetative filtration, infiltration and biofiltration, Swale 1 (BMP 1) has been designed as an Enhanced Dry Swale that collects runoff from Area 1 (NW), which is considered an offsite area and therefore, it does not require treatment. However, it will be connected through an 18-inch pipe with Swale 2 (BMP 2), intended as a grass channel, part of the treatment from this Swale will be credited to Swale 1 (BMP 1).
Please refer to Appendix G for details and dimensions of the Enhanced Dry Swale (BMP 1). Calculations for this Enhanced Dry Swale are detailed in Appendix G.
b) Outlet Control Structure CS-1
The control structure CS-1 (please refer to Appendix L) is a square box of 3.5 ft x 3.5 ft and 6.17 ft high.
On its northeast face, there is a 6-inch high by 3.5 feet wide opening functioning as a vertical weir. The weir control elevation has been set at elevation 1056.55 ft (NAVD). The peak stage for 25 year and 24-hour storm is 1056.00 ft NAVD (refer to the Node Maximum Conditions Report, Swale 1 (NW), Appendix
J) and therefore, the maximum water level maintains a freeboard greater than 6 inches, 1057.55-1056.60=
0.95 ft > 0.5 ft.
Inside the box at the bottom, there is an underdrain covered for maximum infiltration. The discharge from the box is through a 36-ft 18-inch pipe, with an invert elevation of 1051.38 ft NAVD discharging into the lake at elevation of 1043.00 ft NADV, please refer to Appendix L for Control Structure details. Riprap has been placed at the outlet of the discharge for erosion control purposes.
c) BMP 3
The runoff coming from the 0.48 Ac impervious area of Area 3 (NE) will be treated in Swale 3. This treatment is planned as a Bioretention Area which reduces stormwater pollution through filtration, biological absorption, and activity microbial, using vegetation, an engineered soil mix and bottom drainage.
Please refer to Appendix G for details and dimensions of the Bioretention Area (BMP 3). Calculations for the Bioretention Area (BMP 3) are detailed in Appendix G.
d) Outlet Control Structure CS-3
The control structure CS-3 (please refer to Appendix L) is a square box of 3.5 ft x 3.5 ft and 5.58 ft high.
On its east face, there is a 6-inch high by 3.5 feet wide opening functioning as a vertical weir. The weir control elevation has been set at elevation 1051.03 ft (NAVD). The peak stage for 25 year and 24-hour storm is 1050.27 ft NAVD (refer to the Node Maximum Conditions Report, Swale 3 (SE) Appendix J) and therefore, the maximum water level maintains a freeboard greater than 6 inches, 1051.03-1050.27=0.76 ft > 0.5 ft.
Inside the box at the bottom, there is an underdrain covered for maximum infiltration. The discharge from the box is through a 79-ft 18-inch pipe, with an invert elevation of 1045.45 ft NAVD discharging into the
Bioretention Area BMP 3 at elevation of 1042.00 ft NADV, please refer to Appendix L for Control Structure details. Riprap has been placed at the outlet of the discharge for erosion control purposes.
e) BMP 4
The runoff coming from the 0.16 Ac impervious area of Area 4 (S) will be treated in Swale 4 (BMP 4). This treatment is intended to reduce stormwater pollution through filtration, biological absorption, and microbial activity, using vegetation, an engineered soil mix and underdrainage.
Please refer to Appendix G for details and dimensions of the Bioretention Area (BMP 4). Calculations for the Bioretention Area (BMP 4) are detailed in Appendix G.
f) Outlet Control Structure CS-4
The control structure CS-4 (please refer to Appendix L) is a square box of 3.5 ft x 3.5 ft and 5.58 ft high.
On its North face, there is a 6-inch high by 3.5 feet wide opening functioning as a vertical weir. The weir control elevation has been set at elevation 1048.05 ft (NAVD). The peak stage for 25 year and 24-hour storm is 1048.17 ft NAVD (refer to the Node Maximum Conditions Report, Swale 4 (S) Appendix J) and therefore, the maximum water level maintains a freeboard greater than 6 inches, 1049.05-1048.17=0.88 ft > 0.5 ft.
Inside the box at the bottom, there is an underdrain covered for maximum infiltration. The discharge from the box is through a 7-ft 24-inch pipe, with an invert elevation of 1043.47 ft NAVD discharging into the lake at elevation of 1042.00 ft NADV, please refer to Appendix L for Control Structure details. Riprap has
This structure is connected to the control structure CS-5 (invert elev. 1044.23 ft NADV).
g) BMP 5
Area 5 (NW) is located in the northwest section of the parking area, and it has an impervious area of 0.37
Ac. and the runoff coming from the impervious area will be treated in Swale 5 (BMP 5). This treatment is intended to reduce stormwater pollution through filtration, biological absorption, and microbial activity, using vegetation, an engineered soil mix and underdrainage.
Please refer to Appendix G for details and dimensions of the Bioretention Area (BMP 5). Calculations for the Bioretention Area (BMP 5) are detailed in Appendix G.
h) Outlet Control Structure CS-5
The control structure CS-5 (please refer to Appendix L) is a square box of 3.5 ft x 3.5 ft and 5.58 ft high.
On its North face, there is a 6-inch high by 3.5 feet wide opening functioning as a vertical weir. The weir control elevation has been set at elevation 1049.01 ft (NAVD). The peak stage for 25 year and 24-hour storm is 1049.22 ft NAVD (refer to the Node Maximum Conditions Report, Swale 5 (NW) Appendix J) and therefore, the maximum water level maintains a freeboard greater than 6 inches, 1050.01-1049.22=0.79 ft > 0.5 ft.
Inside the box at the bottom, there is an underdrain covered for maximum infiltration. The discharge from the box is through a 21-ft 18-inch pipe, with an invert elevation of 1044.43 ft NAVD discharging into the lake at elevation of 1044.23 ft NADV, please refer to Appendix L for Control Structure details. Riprap has
2.0 SUMMARY TABLES
Summary table for LAKE (SWALE 1) discharge point
Storm
Event
Pre-Developed
Flow rate
Developed
Flow rate
Allowable
Flow Rate
Peak Elev.
SWALE 1
(NW)
Peak Elev.
SWALE 2
(NE)
Developed
Velocity cfs cfs cfs ft, (NAVD) ft, (NAVD) ft/seg
01Y24H 0.81 0.51 46.58 1053.02 1061.62 8.70
02Y24H 0.96 0.76 46.58 1054.04 1061.64 9.81
25Y24H 1.86 1.34 46.58 1054.22 1061.75 11.64
100Y24H 0.71 0.58 46.58 1054.25 1061.68 9.05
Summary table for LAKE (SWALE 4) discharge point
Storm
Event
Pre-Developed
Flow rate
Developed
Flow rate
Allowable
Flow Rate
Peak Elev.
SWALE 4
(S)
Peak Elev.
SWALE 5
(SW)
Developed
Velocity cfs cfs cfs ft, (NAVD) ft, (NAVD) ft/seg
01Y24H 0.81 0.51 48.26 1047.45 1049.20 5.02
02Y24H 0.96 0.76 48.26 1047.47 1049.23 5.66
25Y24H 1.86 1.34 48.26 1047.51 1049.30 6.71
100Y24H 0.71 0.58 48.26 1047.45 1049.19 5.22
Summary table for BIG CREEK (SWALE 3) discharge point
Storm
Event
Pre-Developed
Flow rate
Developed
Flow rate
Allowable
Flow Rate
Peak Elev.
SWALE 3
(SE)
Developed
Velocity cfs cfs cfs ft, (NAVD) ft/seg
01Y24H 0.69 0.57 47.05 1048.77 9.06
02Y24H 0.79 0.70 47.05 1048.79 9.64
25Y24H 1.26 1.18 47.05 1048.86 11.29
100Y24H 0.41 0.40 47.05 1048.74 8.14
Appendix A
Pre-developed Drainage Map
B E
TH
E
LV
IE
W R
O A
D (V
A R
IA
B
LE
' R
/W
Revisions
Date:
FI
LE
L O
C
AT
IO
N
H
:\P R
O
JE
C
TS
\1
.0
FO
R
SY
TH
_B
ET
H
EL
VI
EW
T R
AI
LH
EA
D
\8
C
AD
\X -B
D R
D -C
O M
.D W
G ; L
AY
O
U T:
M O
D
EL
;P
LO
TT
ED
B Y:
g la dy s an gu lo
PL
O T
D
AT
E:
Designed By:
Drawn By:
Checked By:
BCC Project No.:
SHEET NO:
Scale:
05/03/2024
J.R.
J.M.
R.L.
1023020.01
SH
EE
T
TI
TL
E:
DESIGN TICKET NO. 230831-005347
AS SHOWN
B E
T H
E
LV
IE
W
R O
A D
T R
A
IL
H E
A D
LA
N
D L
O T
8, N
D D
IS
TR
IC
T, S
T S
E C
TI
O
N
B E
TH
E
LV
IE
W R
D C
IT
Y
O F
C U
M M
IN
G
, G E
O R
G
IA
, 3
Georgia License No.
To the best of my knowledge these plans and specifications comply with the applicable minimum building codes.
VICTOR H. HERRERA
047786
Certificate of Authorization No.
2390 Canton Road, Building 200
Marietta, Georgia 30066 Tel : 770.424.1668 Fax :
w w w . h e a t h - l i n e b a c k . c o m
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V I
CTOR H. HERRERA
P R
E -D
E V
E
LO
P M
E N
T D
R A
IN
A
G E
B A
S
IN
FIGURE-1
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V
IC
TOR H. HERRERA
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V I
CTOR H. HERRERA
BASIN 1
(OFFSITE)
BASIN 2
BASIN 3
BASIN 4
BASIN 5
P R
E D
E V
E
LO
P E
M E
N T
M A
P P
R E
-D E
V E
LO
P
E M
E N
T S
IT
E
M A
P P
R E
D E
V E
LO
P
E D
D R
A
IN
A G
E M
A P dtorres Area Measurement
0.28 ac dtorres Area Measurement
0.41 ac dtorres Area Measurement
0.32 ac dtorres Area Measurement
0.3 ac dtorres Image dtorres Area Measurement
0.64 ac dtorres Polylength Measurement 1,199.87 ft
Appendix B
Pre-Developed Conditions
Weighted Curve Number Calculations
Pre-Development Runoff Curve Number (CN)
Basin Cover Description
Soil
Hydrologic
Group
CN Area (Ac) CN x A Composite
CN
Woods - (good) B 55 0.4271 23.49
Open Space (poor) - grass < 50% B 79 0.0100 0.79
0.4371 24.28
Woods - (good) B 55 0.1248 6.86
Open Space (poor) - grass < 50% B 79 0.1383 10.92
Imperv. - paved parking lots,roofs,drives B 98 0.0280 2.75
0.2911 20.54
Imperv. - paved parking lots,roofs,drives B 98 0.5413 53.05
Open Space (poor) - grass < 50% B 79 0.0100 0.79
0.5513 53.84
Imperv. - paved parking lots,roofs,drives B 98 0.1703 16.69
Open Space (poor) - grass < 50% B 79 0.0100 0.79
0.1803 17.48
Imperv. - paved parking lots,roofs,drives B 98 0.4407 43.19
Open Space (poor) - grass < 50% B 79 0.0100 0.79
0.4507 43.98
Totals = 1.9105 160.11 83.80
Note: * Considered Off Site Area, so it does not need treatment
Area 5 (SW)
Total Area 5 (SW)
Area 3 (SE)
Total Area 3 (SE)
Area 4 (S)
Total Area 4 (S)
Area 1 (NW)*
Total Area 1 (NW)*
Area 2 (NE)
Total Area 2 (NE)
Appendix C
Pre and Post Time of Concentration Calculations
Date:
Designed By:
Approved By:
1- Sheet Flow (50 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.800
L = flow length (ft), L= 50 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.22 ft/ft
0.42 * (0.8*50)^0.8
60 * (3.82)^0.5* (0.22)^0.4
Tt = 0.12553 hr = 7.53 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.40 ft/ft
TIME OF CONCENTRATION
AREA 1 (NW)
March 6, 2024
J.R.
L.F.
Woods: Dense underbrush…
Tt =
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
V = 16.13(S)^0.5
V = 16.13 * (0.4)^0.5
V = 10.20 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 66 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0.0018 hr = 0.11 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.50 ft
Bottom Width "b" = 4.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 10.50 ft
Pw = wetted perimeter (ft)
Pw = 10.71 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.98 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
Unpaved
66.00
Grass: Short grass prairie…
3600 *10.2 Tt =
0.0400 ft/ft
1.49 * (0.98)^2/3*(0.04)^1/2
0.15
V = 1.96 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 153 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.02168 hr = 1.30 min
Total Time of Concentration
TC = 7.53+ 0.11+1.3
TC =
If Tc < 10 min, them Tc = 10 min
8.94 min
V =
Tt = 153.00
3600 *1.96
Approved By:
1- Sheet Flow (50 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.150
L = flow length (ft), L= 50 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.10 ft/ft
0.42 * (0.15*50)^0.8
60 * (3.82)^0.5* (0.1)^0.4
Tt = 0.04509 hr = 2.71 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.10 ft/ft
March 6, 2024
J.R.
L.F.
TIME OF CONCENTRATION
AREA 2 (NE)
Grass: Short grass prairie…
Tt =
BETHELVIEW ROAD
V = 16.13(S)^0.5
V = 16.13 * (0.1)^0.5
V = 5.10 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 139 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0.00757 hr = 0.45 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.50 ft
Bottom Width "b" = 4.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 10.50 ft
Pw = wetted perimeter (ft)
Pw = 10.71 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.98 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
0.0098 ft/ft
Unpaved
Tt = 139.00
3600 *5.1
Grass: Short grass prairie…
1.49 * (0.98)^2/3*(0.0098)^1/2
V = 0.97 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 100 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.02864 hr = 1.72 min
Total Time of Concentration
TC = 2.71+ 0.45+1.72
TC = 4.88 min
If Tc < 10 min, them Tc = 10 min
V =
Tt = 100.00
3600 *0.97
Approved By:
1- Sheet Flow (100 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.011
L = flow length (ft), L= 100 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.10 ft/ft
0.42 * (0.011*100)^0.8
60 * (3.82)^0.5* (0.1)^0.4
Tt = 0.00971 hr = 0.58 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.10 ft/ft
March 6, 2024
J.R.
L.F.
TIME OF CONCENTRATION
AREA 3 (SE)
Smooth surfaces (concrete, asphalt, gravel, or bare soil)…
Tt =
BETHELVIEW ROAD
V = 20.33(S)^0.5
V = 20.33 * (0.1)^0.5
V = 6.43 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 0 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0 hr = 0.00 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.00 ft
Bottom Width "b" = 12.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 14.00 ft
Pw = wetted perimeter (ft)
Pw = 16.47 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.85 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
0.0050 ft/ft
Paved
Tt = 0.00
3600 *6.43
Grass: Short grass prairie…
1.49 * (0.85)^2/3*(0.005)^1/2
V = 0.63 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 135 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.05952 hr = 3.57 min
Total Time of Concentration
TC = 0.58+ 0+3.57
TC = 4.15 min
If Tc < 10 min, them Tc = 10 min
V =
Tt = 135.00
3600 *0.63
Approved By:
1- Sheet Flow (100 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.011
L = flow length (ft), L= 100 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.10 ft/ft
0.42 * (0.011*100)^0.8
60 * (3.82)^0.5* (0.1)^0.4
Tt = 0.00971 hr = 0.58 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.10 ft/ft
March 6, 2024
J.R.
L.F.
TIME OF CONCENTRATION
AREA 4 (S)
Smooth surfaces (concrete, asphalt, gravel, or bare soil)…
Tt =
BETHELVIEW ROAD
V = 6.43 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 0 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0 hr = 0.00 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.00 ft
Bottom Width "b" = 13.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 15.00 ft
Pw = wetted perimeter (ft)
Pw = 17.47 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.86 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
0.0050 ft/ft
Paved
Tt = 0.00
Grass: Short grass prairie…
1.49 * (0.86)^2/3*(0.005)^1/2
V = 0.64 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 40 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.01736 hr = 1.04 min
Total Time of Concentration
TC = 0.58+ 0+1.04
TC = 1.62 min
If Tc < 10 min, them Tc = 10 min
V =
Tt = 40.00
3600 *0.64
Approved By:
1- Sheet Flow (100 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.011
L = flow length (ft), L= 100 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.10 ft/ft
0.42 * (0.011*100)^0.8
60 * (3.82)^0.5* (0.1)^0.4
Tt = 0.00971 hr = 0.58 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.10 ft/ft
March 6, 2024
J.R.
L.F.
TIME OF CONCENTRATION
AREA 5 (SW)
Smooth surfaces (concrete, asphalt, gravel, or bare soil)…
Tt =
BETHELVIEW ROAD
V = 6.43 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 0 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0 hr = 0.00 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.00 ft
Bottom Width "b" = 11.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 13.00 ft
Pw = wetted perimeter (ft)
Pw = 15.47 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.84 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
0.0050 ft/ft
Paved
Tt = 0.00
Grass: Short grass prairie…
1.49 * (0.84)^2/3*(0.005)^1/2
V = 0.63 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 122 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.05379 hr = 3.23 min
Total Time of Concentration
TC = 0.58+ 0+3.23
TC = 3.81 min
If Tc < 10 min, them Tc = 10 min
V =
Tt = 122.00
Appendix D
Developed Site Map
B E
TH
E
LV
IE
W R
O A
D (V
A R
IA
B
LE
' R
/W
P/L
Revisions
Date:
FI
LE
L O
C
AT
IO
N
H
:\P R
O
JE
C
TS
\1
.0
FO
R
SY
TH
_B
ET
H
EL
VI
EW
T R
AI
LH
EA
D
\8
C
AD
\X -B
D R
D -C
O M
.D W
G ; L
AY
O
U T:
M O
D
EL
;P
LO
TT
ED
B Y:
g la dy s an gu lo
PL
O T
D
AT
E:
Designed By:
Drawn By:
Checked By:
BCC Project No.:
SHEET NO:
Scale:
05/03/2024
J.R.
J.M.
R.L.
1023020.01
SH
EE
T
TI
TL
E:
DESIGN TICKET NO. 230831-005347
AS SHOWN
B E
T H
E
LV
IE
W
R O
A D
T R
A
IL
H E
A D
LA
N
D L
O T
8, N
D D
IS
TR
IC
T, S
T S
E C
TI
O
N
B E
TH
E
LV
IE
W R
D C
IT
Y
O F
C U
M M
IN
G
, G E
O R
G
IA
, 3
Georgia License No.
To the best of my knowledge these plans and specifications comply with the applicable minimum building codes.
VICTOR H. HERRERA
047786
Certificate of Authorization No.
2390 Canton Road, Building 200
Marietta, Georgia 30066 Tel : 770.424.1668 Fax :
w w w . h e a t h - l i n e b a c k . c o m
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V I
CTOR H. HERRERA
P O
S T-
D E
V E
LO
P
M E
N T
D R
A
IN
A G
E B
A S
IN
FIGURE-2
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V
IC
TOR H. HERRERA
STATE OF
LICENSE
PROFESSIONAL ENGIN
EE
R
GEORGIA
No.047786V I
CTOR H. HERRERA
BASIN 1
(OFFSITE)
BASIN 2
BASIN 3
BASIN 4
BASIN 5
D E
V E
LO
P
E D
S
IT
E M
A P dtorres Area Measurement
0.32 ac dtorres Polylength Measurement 1,199.87 ft dtorres Area Measurement Basin 1 (OFFSITE) dtorres Area Measurement Basin 2 dtorres Area Measurement
0.64 ac dtorres Image
Appendix E
Developed Weighted Curve Number Calculations
Post-Development Runoff Curve Number (CN)
Basin Cover Description
Soil
Hydrologic
Group
CN Area (Ac) CN x A Composite
CN
Woods - (good) B 55 0.3776 20.77
Open Space (good) - grass >75% B 61 0.0595 3.63
0.4371 24.40
Woods - (good) B 55 0.0906 4.98
Open Space (good) - grass >75% B 61 0.1725 10.52
Imperv. - paved parking lots,roofs,drives B 98 0.0280 2.75
0.2911 18.25
Imperv. - paved parking lots,roofs,drives B 98 0.4782 46.86
Open Space (good) - grass >75% B 61 0.0731 4.46
0.5513 51.32
Imperv. - paved parking lots,roofs,drives B 98 0.1583 15.51
Open Space (good) - grass >75% B 61 0.0220 1.34
0.1803 16.86
Imperv. - paved parking lots,roofs,drives B 98 0.3724 36.50
Open Space (good) - grass >75% B 61 0.0783 4.77
0.4507 41.27
Totals = 1.9105 152.10 80
Note: * Considered Off Site Area, so it does not need treatment
Total Area 4 (S)
Total Area 5 (SW)
Area 3 (SE)
Area 4 (S)
Area 5 (SW)
Total Area 3 (SE)
Total Area 1 (NW)*
Total Area 2 (NE)
Area 1 (NW)*
Area 2 (NE)
Appendix F
Details of Water Quality Facilities
FOREST Match to existing ground
Match to existing ground
1055.05 i = 4% i = 4% i = 4% 1061.17
1057.55
71.10 1064.59
153.00
PARKING
Match to existing ground Match to existing ground
.0
1063.97 i = 2.93% 1061.04
1066.97 PARKING 1064.04
100.00
.0
SWALE 1 (NW)
ENHANCED DRAY SWALE (W/ UNDERDRAIN)
GRASS CHANNEL (A HYDROLOGIC SOIL)
.8
.0
.8
.0
.0
.6
71.50 4.00
.0
SWALE 2 (NE)
.0
.0
.0
.0
.0
El. 1059.81
El. 1057.89 El. 1058.31
PARKING 1056.84
1051.03
1049.03 i = 0.50% 1049.705
1051.03 1051.03
BIG CREEK
135.00
1049.05 PARKING
1048.87
1047.05 i = 0.50% 1047.25
1048.87 1048.87
LAKE
40.00
SWALE 3 (SE)
.2
.0
.2
.0
.6
.0
SWALE 4 (S)
.2
.6
.0
.4
.6
BIORETENTION BASIN (W/ UNDERDRAIN)
.0
.0
.9
BIORETENTION BASIN (W/ UNDERDRAIN)
LAKE
1050.01 1050.01
1048.01 i = 0.50% 1048.62
1050.01
PARKING 1056.91
122.00
.3
SWALE 5 (NW)
.0
.5
.0
.0
.0
.7
BIORETENTION BASIN (W/ UNDERDRAIN)
Appendix G
Water Quality Calculations
Approved By:
Project Data
Basin Name:
Total Area: 19040 ft2 = 0.44 Ac.
Impervious Area: 0 ft2 = 0.00 Ac. 0%
Length of Swale: 153 ft
Swale Slope: 0.04 ft/ft k = Hydraulic conductivity: 22.2 in/hr (Test I-1)
Runoff Reduction Volume (RRv)
𝑅𝑣 = Volumetricrunoffcoefficient = 0.05+0.009(I)
𝑅𝑣 = 0.0500
RRv = 79 ft3
Storage Volume
14.00 '
1057.55
10.00 '
1056.55
1055.05
2 2
Engineered Soil Media
(30 in)
1052.55
Gravel
(6 in) 1051.55
2.00 '
4.00 '
Volume Provided is: 𝑉𝑃 = 𝑃𝑉+ 𝑉𝐸𝑆(𝑁𝐸𝑆) + 𝑉𝐴(𝑁𝐴)
May 9, 2024
J.R.
L.F.
Area 1 (NW)
'' 1 1
ENHANCED SWALE
BMP 1
BETHELVIEW ROAD
Where:
VP = Volume Provided (temporary storage)
PV = Ponding Volume….................................................. 1589 ft3
VES = Volume of Engineered Soils…..................................... 1470 ft3
NES = Porosity of Engineered Soil…............................. (use 0.25) 0.25
VA = Volume of Aggregate….............................................. 441 ft3
NA = Porosity of Aggregate….................................. 0.4
VP = 1589+1470(0.25) + 441(0.4)
VP = 2133 ft3
IF RRv < VP, them is OK
Verify that the Enhanced Dry Swale will drain in the specified timeframes.
a) Ponded volume should drain within 24 hours
Where:
Af = Top surface area of filter media…..................................... 588 ft2
PV = Ponding volume…........................................................... 1589 ft3 df = Filter media depth…................…..................................... 2.5 ft k = Hydraulic conductivity…...................…..................................... 44.4 ft/day hf = Average water depth…............…..................................... 0.75 ft tf = Drain time (days)
44.4 * (0.75 + 2.5) * 588 t f = 0.05 days = 1.12 hr
IF tf < 24 hr, them is OK, Ponded Volume drain within 24 hours
b) Enhanced Dry Swale will drain should drain within 72 hours
Where:
VP = total volume provided ….................…................................ 2133 ft3 kdesign = hydraulic conductivity…............................................ 22.2 in/hr (Test I-1)
Safety factor of 2 …..............….........................................22.2 ft/day
Aa= bottom surface area of aggregate….............................................306 ft2 tf = Drain time (days)
22.2 * 306 t f = 0.31 days = 7.54 hr t f = 1589*2.5 t f =
IF tf < 72 hr, them is OK, Enhanced Dry Swale drain within 72 hours
Calculate the number of check dams, height, and spacing needed for the minimum swale length.
a) Segment Length (L1) = Check Dam Height / swale slope
L1 = 1.50 / 0.04
L1 = 37.5 ft
b) Segment Volume (WQ1) = V1+V2
V1 = ((0 + (((10+4)/2) * 1.5))/2)*37.5
V1 = 197.00 ft3
V2 = (0+ (10* ((18/12)*2)))/2)*1.5
V2 = 22.50 ft3
WQ1 = 197+ 22.5
WQ1 = 219.50 ft3
b) Number of Segments Required (N) = WQV/WQ1
N = 268 / 219.5
N = 1.22 (Round up)
N = 2
c) Number of Check Dams (ND) = Number of Segments Required (N) -1
ND = 2 - 1
ND = 1
V1 V2
Approved By:
Project Data
Basin Name:
Total Area: 24014 ft2 = 0.55 Ac.
Impervious Area: 20829 ft
= 0.48 Ac. 87%
Length of Swale: 135 ft k = Hydraulic conductivity: 2.5 in/hr (Test I-3)
Runoff Reduction Volume (RRv)
𝑅𝑣 = Volumetric runoff coefficient = 0.05+0.009(I)
𝑅𝑣 = 0.8306
RRv = 1662 ft3
Forebay storage (FS)
VFB = Impervious Area x 0.1 in
VFB = 0.48 Ac. X 0.1 in
VFB = 0.048 Ac.-in
VFB = 174 ft
Storage Volume
18.00 '
1051.03
14.00 '
1050.03
2 2
Hardwood Mulch (3 to 4 in) 3
Engineered Soil Media
(24 to 48 in)
No. 8 or 89 Aggregate 2
(2 to 3 in)
No. 57 Aggregate
(12 in)
2.67 '
5.00 '
10.00 '
May 9, 2024
J.R.
L.F.
Area 3 (SE)
'' 1 1
BIORETENTION AREA
BMP 3
BETHELVIEW ROAD
Volume Provided is: 𝑉𝑃 = 𝑃𝑉+ 𝑉𝐸𝑆(𝑁𝐸𝑆) + 𝑉𝐴(𝑁𝐴)
VP = Volume Provided (temporary storage)
PV = Ponding Volume….................................................. 1600 ft
VES = Volume of Engineered Soils…..................................... 1800 ft
NES = Porosity of Engineered Soil…............................. (use 0.25) 0.25
VA = Volume of Aggregate….............................................. 560 ft3
NA = Porosity of Aggregate….................................. 0.4
VP = 1600+1800(0.25) + 560(0.4)
VP = 2274 ft3
IF RRv < VP, them is OK
Verify that the bioretention basin will drain in the specified timeframes.
a) Ponded volume should drain within 24 hours
Where:
Af = Top surface area of filter media…..................................... 1170 ft2
PV = Ponding volume…........................................................... 1600 ft3 df = Filter media depth…................…..................................... 2 ft k = Hydraulic conductivity…...................…..................................... 5 ft/day hf = Average water depth…............…..................................... 0.5 ft tf = Drain time (days)
5 * (0.5 + 2) * 1170 t f = 0.22 days = 5.25 hr
IF tf < 24 hr, them is OK, Ponded Volume drain within 24 hours
b) Bioretention basin should drain within 72 hours
Where:
VP = total volume provided ….................…................................ 2274 ft3 kdesign = hydraulic conductivity…............................................ 2.5 in/hr
Safety factor of 2…..............….........................................2.5 ft/day
Aa= bottom surface area of aggregate …............................................330 ft2 tf = Drain time (days)
2.5 * 330 t f = 2.76 days = 66.15 hr
IF tf < 72 hr, them is OK, Bioretention basin drain within 72 hours t f = 1600*2
Approved By:
Project Data
Basin Name:
Total Area: 7855 ft2 = 0.18 Ac.
Impervious Area: 6895 ft
= 0.16 Ac. 88%
Length of Swale: 40 ft k = Hydraulic conductivity: 6.7 in/hr (Test I-2)
Runoff Reduction Volume (RRv)
𝑅𝑣 = Volumetric runoff coefficient = 0.05+0.009(I)
𝑅𝑣 = 0.8400
RRv = 550 ft3
Forebay storage (FS)
VFB = Impervious Area x 0.1 in
VFB = 0.16 Ac. X 0.1 in
VFB = 0.016 Ac.-in
VFB = 58 ft
Storage Volume
18.00 '
1049.05
14.00 '
1048.05
2 2
Hardwood Mulch (3 to 4 in) 3
Engineered Soil Media
(24 to 48 in)
No. 8 or 89 Aggregate 2
(2 to 3 in)
No. 57 Aggregate
(12 in)
2.67 '
5.00 '
10.00 '
May 10, 2024
J.R.
L.F.
Area 4 (S)
'' 1 1
BIORETENTION AREA
BMP 4
BETHELVIEW ROAD
Volume Provided is: 𝑉𝑃 = 𝑃𝑉+ 𝑉𝐸𝑆(𝑁𝐸𝑆) + 𝑉𝐴(𝑁𝐴)
VP = Volume Provided (temporary storage)
PV = Ponding Volume….................................................. 460 ft
VES = Volume of Engineered Soils…..................................... 470 ft
NES = Porosity of Engineered Soil…............................. (use 0.25) 0.25
VA = Volume of Aggregate….............................................. 135 ft
NA = Porosity of Aggregate….................................. 0.4
VP = 460+470(0.25) + 135(0.4)
VP = 632 ft
IF RRv < VP, them is OK
Verify that the bioretention basin will drain in the specified timeframes.
a) Ponded volume should drain within 24 hours
Where:
Af = Top surface area of filter media…..................................... 315 ft2
PV = Ponding volume…........................................................... 460 ft3 df = Filter media depth…................…..................................... 2 ft k = Hydraulic conductivity…...................….....................................13.4 ft/day hf = Average water depth…............…..................................... 0.5 ft tf = Drain time (days)
13.4 * (0.5 + 2) * 315 t f = 0.09 days = 2.09 hr
IF tf < 24 hr, them is OK, Ponded Volume drain within 24 hours
b) Bioretention basin should drain within 72 hours
Where:
VP = total volume provided ….................…................................ 632 ft3 kdesign = hydraulic conductivity…............................................ 6.7 in/hr
Safety factor of 2…..............….........................................6.7 ft/day
Aa= bottom surface area of aggregate …..................................... 76 ft2 tf = Drain time (days)
6.7 * 76 t f = 1.24 days = 29.79 hr
IF tf < 72 hr, them is OK, Bioretention basin drain within 72 hours t f = 460*2
Approved By:
1- Sheet Flow (100 ft)
Sheet flow can be calculated using the following formula:
Where:
Tt = travel time (hr) n = Manning roughness coefficient (see Table 2.1.5-2)
0.011
L = flow length (ft), L= 100 ft
P2 = 2-year, 24-hour rainfall
P2 = 3.82 in
S = land slope (ft/ft)
S= 0.10 ft/ft
0.42 * (0.011*100)^0.8
60 * (3.82)^0.5* (0.1)^0.4
Tt = 0.00971 hr = 0.58 min
2- Shallow Concentrated Flow
Average veloci0es for es0ma0ng travel 0me for shallow concentrated flow can be computed from using Figure 2.1.5-5, or the following equations.
Unpaved V = 16.13(S)^ 0.5
Paved V = 20.33(S)^ 0.5
Where:
V = average velocity (ft/s)
S = slope of hydraulic grade line (watercourse slope, ft/ft)
S= 0.10 ft/ft
March 6, 2024
J.R.
L.F.
TIME OF CONCENTRATION
AREA 5 (SW)
Smooth surfaces (concrete, asphalt, gravel, or bare soil)…
Tt =
BETHELVIEW ROAD
V = 6.43 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 0 ft
V = average velocity (ft/s)
3600 = conversion factor from seconds to hours
Tt = 0 hr = 0.00 min
3- Open Channels
Manning's equation is :
Where:
V = average velocity (ft/s)
A = cross sectional flow area (ft2)
Depth of Water "y" = 1.00 ft
Bottom Width "b" = 11.00 ft
Left Side Slope "ZL" = 1:2
Right Side Slope "ZR" = 1:2
A = 13.00 ft
Pw = wetted perimeter (ft)
Pw = 15.47 ft
R = hydraulic radius (ft) and is equal to A/Pw
R= 0.84 ft
S = slope of the hydraulic grade line (ft/ft)
S= n = Manning's roughness coefficient for open channel flow
0.150
0.0050 ft/ft
Paved
Tt = 0.00
Grass: Short grass prairie…
1.49 * (0.84)^2/3*(0.005)^1/2
V = 0.63 cfs
Travel time: ratio of flow length to flow velocity:
Where:
Tt = travel time (hr)
L = flow length (ft)
L= 122 ft
V = average velocity (cfs)
3600 = conversion factor from seconds to hours
Tt = 0.05379 hr = 3.23 min
Total Time of Concentration
TC = 0.58+ 0+3.23
TC = 3.81 min
If Tc < 10 min, them Tc = 10 min
V =
Tt = 122.00
Prepared by: J.R. Date: 4/4/2024
Check by: A.R. Date: 4/4/2024
Approved by: A.V. Date: 4/4/2024
STA.
Grate
(BK)
STA.
Grate
(AH)
01+78.52 1050.20 02+52.76 1050.94 82.00 0.1142 0.95 0.56 0.0090 0.0923 5.73 Ok, Effective Length > Lt
Frequency = 10 (Years)
TC= 10 (min) Time of Concentration
I = 5.19 ( In/hr) NOAA Intensity for storm 10yr-24hr n = 0.016
El. 1050.20
El. 1049.27
El. 1049.87
El. 1047.62
Stucture
No.
TD Parking Lot
Analysis of data from the Federal Highway Administration tests of slotted inlets with slot widths 1.75 in indicates that the length of slotted inlet required for total interception can be computed by equation 4-22. Chart 7, is therefore applicable for both curb-opening inlets and slotted inlets.
Slotted Drain opening length required to intercept 100 percent of the gutter flow.
Lt
(ft)
General design work that involves replacement of a roadside ditch with a pipe system by extending side drain pipes. (Drainage Manual, Chapter 3)
(Urban Drainage Design Manual, Cap. 4.4.4.3. Slotted Inlets)
TRENCH DRAIN CALCULATION
TD_Parking Lot
From To Effective
Length
Area
(Ac)
Runoff
Coefficient
(C)
Q
Segment
(ft /sec)
SL
(ft/ft)
SX
(ft/ft)
Trench Drain
Remark
Sta. 001+78.52 Sta. 002+52.76
82.00
Slope 0.72%
El. 1050.94
El. 1047.82
BETHELVIEW ROAD
Appendix H
Water Quality Performance Review Tool
Name of Developer: Date Submitted:
Development Name: Permit Number:
Site Location / Address: Developer Contact:
Phone Number:
Name of Engineer(s):
Development Type: Maintenance Responsibility:
1.47
1.47
1.47
0.00
I (ac) P (ac) CA (ac)
BIG CREEK DB 1 1.04 0.44 0.00
BASIN 2 DB 2 0.00 0.00 0.00
Drainage Basin 3 DB 3 0.00 0.00 0.00
Drainage Basin 4 DB 4 0.00 0.00 0.00
Drainage Basin 5 DB 5 0.00 0.00 0.00
Drainage Basin 6 DB 6 0.00 0.00 0.00
Drainage Basin 7 DB 7 0.00 0.00 0.00
Drainage Basin 8 DB 8 0.00 0.00 0.00
Drainage Basin 9 DB 9 0.00 0.00 0.00
Drainage Basin 10 DB 10 0.00 0.00 0.00
1.04 0.44 0.00
Yes
Yes
3,655
3,655
4,386
85%
Tracking #: Conditions of Approval:
Reviewed By:
Date Approved:
Jorge Rodriguez
BETHELVIEW ROAD TRAILHEAD
BCC Engineering
Total Pre-Development Area (ac):
I = Impervious Area, P = Pervious Area, CA = Conservation Area
Target Runoff Reduction Volume Achieved?
Target TSS Removal Achieved?
Total Target Water Quality Volume (cf)
% TSS Removal Achieved
Total Target Runoff Reduction Volume (cf)
Runoff Reduction Volume Achieved (cf)
Total Treated Area (ac):
Total Untreated Area (ac):
TOTAL
Georgia Stormwater Management Manual
Stormwater Quality Site Development Review Tool
Version 2.2
General Information
Site Summary
Official Use Only
Total Post-Development Area (ac):
0%
20%
40%
60%
80%
100%
DB 1 DB 2 DB 3 DB 4 DB 5 DB 6 DB 7 DB 8 DB 9 DB 10
TS
S
R e d u ct io n
Total Suspended Solids (TSS) Removal
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
DB 1 DB 2 DB 3 DB 4 DB 5 DB 6 DB 7 DB 8 DB 9 DB 10
R
R T ar ge t M e t
Runoff Reduction (RR)
Development Name: data input cells
Drainage Basin Name: calculation cells constant values
Indicate Pre-Development Land Cover and Runoff Curve Numbers in the Site's Disturbed Area
HSG* A
(acres) CN HSG B (acres) CN
HSG C
(acres)
CN
HSG D
(acres) CN Total % Cover
98 1.18 98 98 98 1.18 80%
30 0.11 55 70 77 0.11 8%
68 0.18 79 86 89 0.18 12%
0 0 0 0 0.00 0%
0 0 0 0 0.00 0%
0.00 0%
0.00 0%
0.00 1.47 0.00 0.00 1.47 100%
1.18
0.83
Indicate Post-Development Land Cover and Runoff Curve Numbers in the Site's Disturbed Area
HSG A
(acres) CN HSG B (acres) CN
HSG C
(acres)
CN
HSG D
(acres) CN Total % Cover
98 1.04 98 98 98 1.04 70%
30 0.03 55 70 77 0.03 2%
39 0.41 61 74 80 0.41 28%
0 0 0 0 0.00 0%
0 0 0 0 0.00 0%
0.00 0%
0.00 0%
0.00 1.47 0.00 0.00 1.47 100%
1.04
0.68
1.51
Scenario 1: Natural Conservation Area *See the GSMM Volume 2, Section 2.3.3.3 for more information. Scenario 3: Soil Restoration *See the GSMM Volume 2, Section 4.23 for more information.
Scenario 2: Site Reforestation/Revegetation *See the GSMM Volume 2, Section 4.22 for more information. Scenario 4: Site Reforestation/Revegetation & Soil Restoration
Total Conservation Area Credit (acres) 0.00
Site Data
Georgia Stormwater Management Manual
Stormwater Quality Site Development Review Tool, v2.2
Area (ac) of development protected by a conservation easement or equivalent form of protection.
Check the box if a portion of the post-developed area is protected by a conservation easement or equivalent form of protection.
Jorge Rodriguez
BIG CREEK
Impervious (ac)
Weighted CN
Impervious (ac)
Rv
Weighted CN
Select a land cover type…
Local Jurisdiction Input
Total
Conservation Area Credits
Select a land cover type…
Check the box if a portion of the post-developed area employs site reforestation/revegetation and is protected by a conservation easement or equivalent form of protection.
Area (ac) of development reforested/revegetated and protected by a conservation easement or equivalent form of protection.
Check the box if a portion of the post-developed area employs soil restoration and is protected by a conservation easement or equivalent form of protection.
Area (ac) with restored soils in a reforested & revegetated area and protected by a conservation easement or equivalent form of protection.
Note: The green cell will unlock if the Scenario 1 box above is checked
Note: The green cell will unlock if the Scenario 2 box above is checked
Area (ac) of development with restored soils and protected by a conservation easement or equivalent form of protection.
Check the box if the same portion of the post-developed area employs site reforestation/revegetation and soil restoration, and is protected by a conservation easement or equivalent form of protection.
Note: The green cell will unlock if the Scenario
4 box above is checked
*See the GSMM Volume 2, Section 4.22 and 4.23 for more information.
Note: The green cell will unlock if the Scenario
3 box above is checked
Cover Type
Impervious
Woods - Good Condition
Open space - Poor condition (grass cover < 50%)
Select a land cover type…
Potential Max Soil Retention, Spre (in)
Potential Max Soil Retention, Spost (in)
Woods - Good Condition
Open space - Good condition (grass cover > 75%)
Other
Total
*HSG = hydrologic soil group
Cover Type
Impervious
Select a land cover type…
Local Jurisdiction Input
Other constant values
Site Data
Georgia Stormwater Management Manual
Stormwater Quality Site Development Review Tool, v2.2 Jorge Rodriguez
BIG CREEK
Target Runoff Reduction Storm (in) 1.00 Total Site Area for Water Quality Volume (acres) 1.47
Target Runoff Reduction Volume (cf) 3,655
Target Water Quality Volume (cf) 4,386
On-site
Pervious Area
(acres)
On-site
Impervious
Area
(acres)
Offsite Area
(acres)
RR Volume from Direct
Drainage (cf)
RR Volume from
Upstream
Practices (cf)
Total RR
Volume
Received by
BMP (cf)
Runoff
Reduction %
RR Achieved
(cf)
Remaining
RR Volume
(cf)
WQv from
Direct
Drainage (cf)
Effective
TSS
Removal %
BMP 1 Enhanced Dry Swale (w/ underdrain) 0.00 0.00 0.44 2,133 0 108 108 50% 108 0 0 80%
BMP 2 Grass Channel (A & B hydrologic soils) 0.26 0.03 144 BMP 1 144 0 144 25% 36 108 173 50%
BMP 3 Bioretention Basin (w/ upturned underdrain) 0.07 0.48 2,784 1,662 0 1,662 75% 1,662 0 1,995 85%
BMP 4 Bioretention Basin (w/ upturned underdrain) 0.02 0.16 837 550 0 550 75% 550 0 660 85%
BMP 5 Bioretention Basin (w/ upturned underdrain) 0.08 0.37 2,279 1,298 0 1,298 75% 1,298 0 1,558 85%
BMP 6 Select a BMP… 0 0 0 N/A 0 0 0 N/A
BMP 7 Select a BMP… 0 0 0 N/A 0 0 0 N/A
BMP 8 Select a BMP… 0 0 0 N/A 0 0 0 N/A
BMP 9 Select a BMP… 0 0 0 N/A 0 0 0 N/A
BMP 10 Select a BMP… 0 0 0 N/A 0 0 0 N/A
TOTAL 0.44 1.04 0.44 3,655 3,655 4,386
UNTREATED AREA (acres) 0.00 0.00
Target Runoff Reduction Volume (cf) 3,655
Target Achieved? Yes!
Remaining Runoff Reduction Volume (cf) 0
Target Water Quality Volume (cf) 4,386
% TSS Removal Achieved 85%
Target Achieved? Yes!
Remaining TSS Removal % 0%
Storage Volume
Provided by
BMP
(cf)
Area Draining to Each BMP RR Conveyance
Volume
Provided by
BMP
(cf)
WQ CalculationsRunoff Reduction Calculations
Down-stream
BMP
Select BMPs for Runoff Reduction and Water Quality
Water Quality Goals constant values
Site Data
Georgia Stormwater Management Manual
Stormwater Quality Site Development Review Tool, v2.2 Jorge Rodriguez
BIG CREEK
1-yr, 24-hr storm
2-yr, 24-hr storm
25-yr, 24-hr storm
100-yr, 24-hr storm
Target Rainfall Event (in) 3.36 3.82 6.06 7.44
1-yr, 24-hr storm
2-yr, 24-hr storm
25-yr, 24-hr storm
100-yr, 24-hr storm
2.54 2.98 5.17 6.53
2.05 2.46 4.57 5.90
1.37 1.78 3.88 5.21
Adjusted CN 78 78 80 81
*See Stormwater Management Standards to Determine Detention Requirements.
Comments
Post-Development Runoff Volume (in) with BMPs
Post Development Runoff Volume (in) with no BMPs
Pre-Development Runoff Volume (in)
Channel and Flood Protection Calculations
Appendix I
Pre-developed hydrographs and routings for the 1, 2, 10, 25 100 Year Storms
Date: 04/04/24
Designed By: J.R.
Approved By: L.F.
Basin Data: AREA 1 (NW)
Time of concentration (Tc) = 8.94 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.44 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*8.94
Tp = 6.864 min = 0.114 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.44/640))/0.114
300 qpu = 1.81 cfs
484 qpu = (484* (0.44/640))/0.114
484 qpu = 2.92 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.44 3 0.37 1.07 0.67 1.22
0.87 6 0.97 2.82 0.99 1.79
1.31 9 0.86 2.51 0.94 1.70
1.75 12 0.49 1.42 0.75 1.36
2.19 15 0.22 0.63 0.55 0.99
2.62 18 0.08 0.24 0.37 0.67
3.06 21 0.03 0.08 0.24 0.44
3.50 24 0.01 0.03 0.15 0.28
3.93 27 0.00 0.01 0.10 0.17
4.37 30 0.00 0.00 0.06 0.11
4.81 33 0.03 0.06
5.24 36 0.02 0.04
5.68 39 0.01 0.02
6.12 42 0.01 0.01
6.56 45 0.00 0.01
6.99 48 0.00 0.00
Time 484 300
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 t/ T p q/qpu
Hydrograph Area 1 (NW)
Peaking Factor =484
Peaking Factor = 300
Approved By: L.F.
Basin Data: AREA 2 (NE)
Time of concentration (Tc) = 4.88 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.29 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*4.88
Tp = 4.428 min = 0.074 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.29/640))/0.074
300 qpu = 1.84 cfs
484 qpu = (484* (0.29/640))/0.074
484 qpu = 2.96 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.68 3 0.78 2.30 0.90 1.66
1.36 6 0.82 2.44 0.93 1.70
2.03 9 0.29 0.87 0.62 1.13
2.71 12 0.07 0.20 0.34 0.63
3.39 15 0.01 0.04 0.17 0.32
4.07 18 0.00 0.01 0.08 0.15
4.74 21 0.00 0.00 0.04 0.07
5.42 24 0.02 0.03
6.10 27 0.01 0.01
6.78 30 0.00 0.01
7.45 33 0.00 0.00
Time 484 300
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 t/ T p q/qpu
Hydrograph Area 2 (NE)
Approved By: L.F.
Basin Data: AREA 3 (SE)
Time of concentration (Tc) = 4.15 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.55 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*4.15
Tp = 3.99 min = 0.067 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.55/640))/0.067
300 qpu = 3.85 cfs
484 qpu = (484* (0.55/640))/0.067
484 qpu = 6.21 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.75 3 0.87 5.39 0.95 3.64
1.50 6 0.70 4.32 0.87 3.33
2.26 9 0.19 1.16 0.52 1.98
3.01 12 0.03 0.20 0.26 0.99
3.76 15 0.00 0.03 0.12 0.45
4.51 18 0.00 0.00 0.05 0.19
5.26 21 0.02 0.08
6.02 24 0.01 0.03
6.77 27 0.00 0.01
7.52 30 0.00 0.00
Time 484 300
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 t/ T p q/qpu
Hydrograph Area 3 (SE)
Approved By: L.F.
Basin Data: AREA 4 (S)
Time of concentration (Tc) = 1.62 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.18 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*1.62
Tp = 2.472 min = 0.041 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.18/640))/0.041
300 qpu = 2.06 cfs
484 qpu = (484* (0.18/640))/0.041
484 qpu = 3.32 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
1.21 3 0.93 3.08 0.97 2.00
2.43 6 0.13 0.43 0.44 0.91
3.64 9 0.01 0.02 0.13 0.27
4.85 12 0.00 0.00 0.03 0.07
6.07 15 0.01 0.02
7.28 18 0.00 0.00
Time 484 300
-0.20
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 t/ T p q/qpu
Hydrograph Area 4 (S)
Approved By: L.F.
Basin Data: AREA 4 (S)
Time of concentration (Tc) = 3.81 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.45 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*3.81
Tp = 3.786 min = 0.063 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.45/640))/0.063
300 qpu = 3.35 cfs
484 qpu = (484* (0.45/640))/0.063
484 qpu = 5.40 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.79 3 0.91 4.91 0.96 3.22
1.58 6 0.62 3.37 0.83 2.78
2.38 9 0.14 0.78 0.46 1.56
3.17 12 0.02 0.11 0.22 0.73
3.96 15 0.00 0.01 0.09 0.31
4.75 18 0.00 0.00 0.04 0.12
5.55 21 0.01 0.05
6.34 24 0.01 0.02
7.13 27 0.00 0.01
7.92 30 0.00 0.00
Time 484 300
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 9 t/ T p q/qpu
Hydrograph Area 5 (SW)
Appendix K
Developed hydrographs and routings for the 1, 2, 10, 25
100 Year Storms
Approved By: L.F.
Basin Data: AREA 1 (NW)
Time of concentration (Tc) = 8.94 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.44 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*8.94
Tp = 6.864 min = 0.114 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.44/640))/0.114
300 qpu = 1.81 cfs
484 qpu = (484* (0.44/640))/0.114
484 qpu = 2.92 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.44 3 0.37 1.07 0.67 1.22
0.87 6 0.97 2.82 0.99 1.79
1.31 9 0.86 2.51 0.94 1.70
1.75 12 0.49 1.42 0.75 1.36
2.19 15 0.22 0.63 0.55 0.99
2.62 18 0.08 0.24 0.37 0.67
3.06 21 0.03 0.08 0.24 0.44
3.50 24 0.01 0.03 0.15 0.28
3.93 27 0.00 0.01 0.10 0.17
4.37 30 0.00 0.00 0.06 0.11
4.81 33 0.03 0.06
5.24 36 0.02 0.04
5.68 39 0.01 0.02
6.12 42 0.01 0.01
6.56 45 0.00 0.01
6.99 48 0.00 0.00
Time 484 300
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 t/ T p q/qpu
Hydrograph Area 1 (NW)
Approved By: L.F.
Basin Data: AREA 2 (NE)
Time of concentration (Tc) = 4.88 min
Computer calculation time increment (d) = 3 min
Peaking Factor = 300
Peaking Factor = 484
Area = 0.29 Ac.
(1) Calculate Tp and time increment
Tp = d/2 + 0.6 Tc
Tp = 3/2 + 0.6*4.88
Tp = 4.428 min = 0.074 hrs
(2) Calculate qpu qpu = PF*A/Tp
300 qpu = (300* (0.29/640))/0.074
300 qpu = 1.84 cfs
484 qpu = (484* (0.29/640))/0.074
484 qpu = 2.96 cfs
BETHELVIEW ROAD
Approved By: L.F.
BETHELVIEW ROAD
TRAILHEAD
CITY OF CUMMING, GEORGIA
(3) Calculate unit hydrograph for both 484 and 300.
t/Tp Time q/qpu Q484 q/qpu Q300
0 0 0.00 0.00 0.00 0.00
0.68 3 0.78 2.30 0.90 1.66
1.36 6…
This is the start of the file's text. The full file is on GovTribe.