13-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf

PDF 125 MB Posted

Attached to
Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead
Solicitation number
25-69-1514
Issued by
Fayette County, Georgia

About this file

The document appears to be a technical drawing file titled "13-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8" related to the Big Creek Greenway Rehabilitation project in Georgia. The file is associated with a progressive design-build services contract for trail rehabilitation and development, specifically focusing on Phases 2, 3, 4, and the Bethelview Trailhead. While the specific details of the design drawings are not fully elaborated in the provided text, the document suggests a focused engineering and design effort for a specific segment of the greenway project, spanning approximately 0.5 miles (from mile marker 6.3 to 6.8).

The contract opportunity is situated in Georgia and involves progressive design-build services for a greenway rehabilitation project. The scope appears to encompass multiple project phases and includes the development of a trailhead, indicating a comprehensive infrastructure improvement initiative. Without additional context from the design drawings, the precise engineering specifications, cost estimates, and detailed project parameters cannot be definitively stated. The project seems to be a local government infrastructure development effort aimed at enhancing recreational trail systems in the area.

View the file

Other files

File Type Posted
11-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
20-Addendum 2 RFP 25-69-1514.pdf PDF
10-Plan for the Rehabiliation, Restoration and Renewal 09252019.pdf PDF
19-Sign In Sheet 25-69-1514.pdf PDF
27-Big Creek Greenway Phase 4 - Ecology Survey - Waters - 5-29-25.pdf PDF
29-Big Creek Greenway Bethelview Trailhead - Hydrology Report with Appendices.pdf PDF
1-Specifications for Helical Pile Foundation.pdf PDF
14-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
25-Summary of Work-Revision 1 08072025.pdf PDF
16-0. Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
22-Sign in Sheet for Site Visit.pdf PDF
3-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
7-Big Creek Greenway Phases 23 Ecology Survey - Waters 2-9-2024.pdf PDF
2-Summary of Work.pdf PDF
9-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
12-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
5-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
26-Big Creek Greenway Bethelview Trailhead - Hydrology Report.pdf PDF
21-BCG Rehabilitation - Phase 4 Segment 2 60% Plans.pdf PDF
8-100% Design Drawings for Bethelview Trailhead.pdf PDF
6-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
4-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
17-1.1 RFP 25-69-1514 Big Creek GW PDB-Agreement, GCs and SCs.pdf PDF
23-Addendum 3 RFP 25-69-1514.pdf PDF
24-Addendum 4 RFP 25-69-1514.pdf PDF
28-Addendum 5 RFP 25-69-1514.pdf PDF
15-1. RFP 25-69-1514 PDB Big Creek GW.pdf PDF
18-Addendum 1 RFP 25-69-1514.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .