About this file

This document is a Mandatory Site Visit Sign-In Sheet for a Forsyth County Capital Projects site visit related to the 25-69-1514 Progressive Design Build Big Creek Greenway Rehabilitation project. The site visit is scheduled for July 15, 2025, located at 5120 Bethelview Rd, Cumming, GA 30040 (Bethelview Trailhead). The document is divided into two groups: Group 1 from 9:30 AM - 12:00 PM and Group 2 from 1:00 PM - 3:30 PM. Seven companies attended the first group, including Astra Group, Gresham Smith, Crowder, Foreside Group, Ed Castro Landscape, and Steele 8 Associates. The second group included Volkert, Excellere Construction, and MAPP, LLC.

The sign-in sheet captures each attendee's company, name, email address, and signature. Attendees represent a mix of design, construction, and landscape companies, suggesting a comprehensive approach to the Big Creek Greenway Rehabilitation project. The use of a mandatory site visit sign-in sheet indicates this is likely a competitive bidding process where direct site observation is crucial for understanding the project's scope and requirements. The document serves as an official record of participation and ensures that potential bidders have firsthand knowledge of the project location and specific site conditions.

View the file

Other files

File Type Posted
11-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
20-Addendum 2 RFP 25-69-1514.pdf PDF
10-Plan for the Rehabiliation, Restoration and Renewal 09252019.pdf PDF
19-Sign In Sheet 25-69-1514.pdf PDF
27-Big Creek Greenway Phase 4 - Ecology Survey - Waters - 5-29-25.pdf PDF
29-Big Creek Greenway Bethelview Trailhead - Hydrology Report with Appendices.pdf PDF
1-Specifications for Helical Pile Foundation.pdf PDF
14-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
25-Summary of Work-Revision 1 08072025.pdf PDF
13-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf PDF
16-0. Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
3-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
7-Big Creek Greenway Phases 23 Ecology Survey - Waters 2-9-2024.pdf PDF
2-Summary of Work.pdf PDF
9-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
12-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
5-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
26-Big Creek Greenway Bethelview Trailhead - Hydrology Report.pdf PDF
21-BCG Rehabilitation - Phase 4 Segment 2 60% Plans.pdf PDF
8-100% Design Drawings for Bethelview Trailhead.pdf PDF
6-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
4-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
17-1.1 RFP 25-69-1514 Big Creek GW PDB-Agreement, GCs and SCs.pdf PDF
23-Addendum 3 RFP 25-69-1514.pdf PDF
24-Addendum 4 RFP 25-69-1514.pdf PDF
28-Addendum 5 RFP 25-69-1514.pdf PDF
15-1. RFP 25-69-1514 PDB Big Creek GW.pdf PDF
18-Addendum 1 RFP 25-69-1514.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .