ESGC Phase One Maintenance Building
Closed State & local contract opportunity
- Solicitation number
- 25-19
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15538 Field Offices And Sheds, Construction Type
- 90921 Building Construction, Industrial (Warehouse, Etc.)
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 90924 Building Construction, Commercial And Institutional
- 90925 Building Construction, Prefabricated (All Types)
- 90930 Building Construction (Not Otherwise Classified)
- Point of contact
-
- Jason Cutshaw cutjason@co.walton.fl.us (850) 892-8176
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Walton County, Florida is seeking bids for the ESGC Phase One Maintenance Building project through Invitation to Bid (ITB) #25-19, which involves constructing a maintenance facility at the Eagle Springs Golf Course Complex in DeFuniak Springs. The base bid covers building materials, construction, utility hookups, and site grading for a pre-engineered metal building of approximately 9,600 square feet, with two alternate bid options: Alternate 1 for interior build-out and Alternate 2 for access and parking lot paving. The project requires a licensed General Contractor compliant with Walton County Ordinance 2009-01 who will obtain a county building permit, with a mandatory pre-bid meeting scheduled for July 8, 2025, at 8:30 am and bid responses due by July 30, 2025, at 3:00 pm. The contract duration is 120 days for substantial completion, with an additional 30 days allocated for punch list completion. Bidders must submit a 5% bid security and comprehensive documentation including local preference applications, drug-free workplace certifications, and proof of licenses. The county will award the contract to the lowest, most responsible and responsive bidder who best meets project specifications.
The procurement does not indicate specific set-aside designations for disadvantaged enterprises, and no incumbent vendors are explicitly mentioned. The project's total estimated cost is $3,283,497.67, broken down into base bid ($1,624,045.09), Alternate 1 interior build-out ($805,000.00), Alternate 2 access and parking ($682,853.32), and Alternate 3 sewer lift station ($171,599.26). The project will be funded through Walton County resources, with a 15% contingency included for each alternate. The maintenance building will be constructed on a 24,970 square foot project site and includes comprehensive infrastructure development such as utility connections, stormwater management, and a dry retention basin. The facility will feature impact-rated doors and windows, HVAC systems, plumbing, electrical infrastructure, and potential future fire sprinkler system capabilities. A Development Order has been issued by the City of DeFuniak Springs, effective from February 6, 2025, to February 6, 2026, authorizing project development with specific permitting and regulatory compliance conditions.
Opportunity text
The proposed project, hereinafter referred to as the "Project" consists of the construction of a maintenance building at the Eagle Springs Golf Course Complex. The base bid includes all building materials and construction, utility hookups, and site grading. Bid alternates include the interior build-out (Alternate 1) and access/parking lot paving (Alternate 2).
Location: DeFuniak Springs, Florida
Contract Time: The contract duration is ONE HUNDRED AND TWENTY (120) days to substantial completion with an additional THIRTY (30) days for punch list completion.
Special Requirement:
The Contractor selected for award of this bid must be an insured, licensed General Contractor in accordance with Walton County Ordinance 2009-01, and must obtain a Walton County Building Permit subject to the requirements of Walton County Ordinance 2005-29, as amended by 2007-91.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity