ITB_25-08_Bid_Schedule_Template.xlsx
XLSX spreadsheet 9 KB Posted
- Attached to
- ESGC Phase One Maintenance Building
- Solicitation number
- 25-19
- Issued by
- Walton County, Florida
About this file
The document is an Invitation to Bid (ITB) 25-08 for Walton County, Florida, specifically for the Eagle Springs Golf Course (ESGC) Maintenance Building project. The bid schedule covers a comprehensive construction project with a base bid and two alternates, including site preparation, utility connections, building shell construction, and optional storage area elements. The project is located in DeFuniak Springs, Florida, with a contract duration of 120 days for substantial completion and an additional 30 days for punch list items. The bid includes line items for mobilization, site grading, utility connections, building foundation, metal building shell, doors and windows, and exterior finishes.
The bid schedule provides optional pricing for additional scope items such as storage area metal panels and floor finishes, with pricing to be submitted on a lump sum (LS) basis for each line item. The contractor must be an insured, licensed General Contractor in accordance with Walton County Ordinance 2009-01 and must obtain a Walton County Building Permit per Ordinance 2005-29 (as amended). The bid includes Alternate 1 for interior build-out (framing, drywall, doors, fixtures, flooring, ceilings, painting, HVAC, plumbing, and electrical systems) and Alternate 2 for access road and parking lot construction, providing flexibility for the county to potentially expand the project scope based on available funding and priorities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 25-08 Bid Schedule
| ITB 25-08 – ESGC Maintenance Building | ||||
| Walton County, FL | ||||
| DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| BASE BID ITEMS | ||||
| Mobilization | LS | 1 | ||
| Site Grading and Preparation | LS | 1 | ||
| Utility Connections (Water/Sewer/Electric) | LS | 1 | ||
| Building Foundation and Slab | LS | 1 | ||
| Pre-Engineered Metal Building Shell Erection | LS | 1 | ||
| Impact-Rated Doors and Windows | LS | 1 | ||
| Exterior Trim and Finishes | LS | 1 | ||
| ALTERNATE 1 – INTERIOR BUILD-OUT | ||||
| Interior Framing and Drywall | LS | 1 | ||
| Interior Doors, Hardware, and Trim | LS | 1 | ||
| Bathroom Fixtures and Accessories | LS | 1 | ||
| Break Room Casework and Fixtures | LS | 1 | ||
| Flooring (VCT) and Base Trim | LS | 1 | ||
| Ceilings | LS | 1 | ||
| Interior Painting | LS | 1 | ||
| HVAC System Installation | LS | 1 | ||
| Plumbing System Installation | LS | 1 | ||
| Electrical System Installation | LS | 1 | ||
| ALTERNATE 2 – ACCESS & PARKING | ||||
| Access Road Construction | LS | 1 | ||
| Parking Lot Base and Paving | LS | 1 | ||
| ADA Striping and Signage | LS | 1 | ||
| Stormwater Swales and Drainage Features | LS | 1 | ||
| OPTIONAL PRICING (IF REQUESTED) | ||||
| OPTION: Storage Area – 8 ft Interior Metal Panels | LS | 1 | ||
| OPTION: Storage Area Floor Finish (Sealed Concrete) | LS | 1 | ||
| OPTION: Storage Area Floor Finish (Tnemec System) | LS | 1 | ||
| OPTION: Non-Impact Rated Doors/Windows | LS | 1 | ||
| TOTAL BASE BID | ||||
| TOTAL ALTERNATE 1 | ||||
| TOTAL ALTERNATE 2 | ||||
| TOTAL OPTIONAL ITEMS |