This is a Scope of Work Summary for Invitation to Bid (ITB) #25-08 issued by Walton County, Florida for the ESGC Phase One Maintenance Building project located in DeFuniak Springs. The base bid encompasses construction of a pre-engineered metal building approximately 9,600 square feet in total area, including rough grading and site preparation, utility connections for water, sewer, and electrical systems, foundation and slab work, exterior shell and roof system with impact-rated doors and windows, and ADA-compliant entry features. Alternate 1 covers interior build-out with all interior framing, finishes, partitions, bathroom and break room construction, and installation of HVAC, plumbing, and electrical systems throughout the facility. Alternate 2 addresses site access and parking development including asphalt paving, grading, compaction, striping, ADA parking spaces, and stormwater management swales. A mandatory pre-bid meeting is scheduled for July 8, 2025, at 8:30 am, with bid responses due by July 30, 2025, at 3:00 pm. The contract duration is 120 days for substantial completion with an additional 30 days for punch list completion.

The project's total estimated cost is $3,283,497.67, with the base bid valued at $1,624,045.09, Alternate 1 at $805,000.00, Alternate 2 at $682,853.32, and Alternate 3 (sewer lift station) at $171,599.26, each including a 15% contingency. Bidders must submit a 5% bid security along with required documentation including local preference applications, drug-free workplace certifications, and proof of licensure as an insured, licensed General Contractor in accordance with Walton County Ordinance 2009-01. The project will be funded through Walton County resources, and the county will award the contract to the lowest, most responsible and responsive bidder. A Development Order issued by the City of DeFuniak Springs, effective February 6, 2025, through February 6, 2026, authorizes project development with specific permitting and regulatory compliance requirements.

View the file

Other files

File Type Posted
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
ESGC_Phase_One_Maintenance_Building.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
11_13_2023_agenda.pdf PDF
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
1_OVERALL_SITE_PLAN.pdf PDF
11_13_2023_agenda.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
11_13_2023_agenda.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB 25-08 – Scope of Work Summary Base Bid – Core Building & Site Work

- Construction of a pre-engineered metal building (approx. 9,600 SF total)

- Rough grading and site prep per civil/structural plans

- Installation of utility connections (water, sewer, electrical stub-outs)

- Foundation and slab per structural drawings

- Exterior shell and roof system per architectural elevations (impact-rated doors and windows included)

- ADA-compliant entry features (excluding parking lot paving) Alternate 1 – Interior Build-Out

- All interior framing and finishes per floor plan A101 and sheets A104-A105

- Bathrooms, break room, mechanical room, and office partitions

- Installation of HVAC, plumbing, and electrical systems per M, P, and E sheets

- Ceilings, VCT flooring, cabinetry, and interior doors/hardware

- ADA fixtures, restroom accessories, and finishes per specifications Alternate 2 – Site Access & Parking

- Access driveway and parking lot paving (asphalt and/or base per site plan)

- Grading, compaction, striping, ADA parking spaces, and stormwater swales

- Coordination with Public Works for ROW if applicable

File details come from the government source that posted it. Updated .