This is a Scope of Work Summary for Invitation to Bid (ITB) #25-08 issued by Walton County, Florida for the ESGC Phase One Maintenance Building project located in DeFuniak Springs. The base bid encompasses construction of a pre-engineered metal building approximately 9,600 square feet in total area, including rough grading and site preparation, utility connections for water, sewer, and electrical systems, foundation and slab work, exterior shell and roof system with impact-rated doors and windows, and ADA-compliant entry features. Alternate 1 covers interior build-out with all interior framing, finishes, partitions, bathroom and break room construction, and installation of HVAC, plumbing, and electrical systems throughout the facility. Alternate 2 addresses site access and parking development including asphalt paving, grading, compaction, striping, ADA parking spaces, and stormwater management swales. A mandatory pre-bid meeting is scheduled for July 8, 2025, at 8:30 am, with bid responses due by July 30, 2025, at 3:00 pm. The contract duration is 120 days for substantial completion with an additional 30 days for punch list completion.
The project's total estimated cost is $3,283,497.67, with the base bid valued at $1,624,045.09, Alternate 1 at $805,000.00, Alternate 2 at $682,853.32, and Alternate 3 (sewer lift station) at $171,599.26, each including a 15% contingency. Bidders must submit a 5% bid security along with required documentation including local preference applications, drug-free workplace certifications, and proof of licensure as an insured, licensed General Contractor in accordance with Walton County Ordinance 2009-01. The project will be funded through Walton County resources, and the county will award the contract to the lowest, most responsible and responsive bidder. A Development Order issued by the City of DeFuniak Springs, effective February 6, 2025, through February 6, 2026, authorizes project development with specific permitting and regulatory compliance requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 25-08 – Scope of Work Summary Base Bid – Core Building & Site Work
- Construction of a pre-engineered metal building (approx. 9,600 SF total)
- Rough grading and site prep per civil/structural plans
- Installation of utility connections (water, sewer, electrical stub-outs)
- Foundation and slab per structural drawings
- Exterior shell and roof system per architectural elevations (impact-rated doors and windows included)
- ADA-compliant entry features (excluding parking lot paving) Alternate 1 – Interior Build-Out
- All interior framing and finishes per floor plan A101 and sheets A104-A105
- Bathrooms, break room, mechanical room, and office partitions
- Installation of HVAC, plumbing, and electrical systems per M, P, and E sheets
- Ceilings, VCT flooring, cabinetry, and interior doors/hardware
- ADA fixtures, restroom accessories, and finishes per specifications Alternate 2 – Site Access & Parking
- Access driveway and parking lot paving (asphalt and/or base per site plan)
- Grading, compaction, striping, ADA parking spaces, and stormwater swales
- Coordination with Public Works for ROW if applicable