This is a Bid Schedule Template for Invitation to Bid (ITB) #25-08 issued by Walton County, Florida for the ESGC Phase One Maintenance Building project located in DeFuniak Springs. The project involves construction of a maintenance facility at the Eagle Springs Golf Course Complex, with a base bid covering mobilization, site grading and preparation, utility connections, building foundation and slab, pre-engineered metal building shell erection, impact-rated doors and windows, and exterior trim and finishes. Alternate 1 encompasses interior build-out including framing, drywall, interior doors, bathroom fixtures, break room casework, flooring, ceilings, painting, and HVAC, plumbing, and electrical system installations. Alternate 2 covers access road construction, parking lot base and paving, ADA striping and signage, and stormwater drainage features. Optional pricing items include storage area interior metal panels, floor finishes with sealed concrete or Tnemec system, and non-impact rated doors and windows. A mandatory pre-bid meeting is scheduled for July 8, 2025, at 8:30 a.m., with bid responses due by July 30, 2025, at 3:00 p.m. The contract duration is 120 days for substantial completion, with an additional 30 days allocated for punch list completion.

The project's total estimated cost is $3,283,497.67, comprising base bid ($1,624,045.09), Alternate 1 interior build-out ($805,000.00), Alternate 2 access and parking ($682,853.32), and contingency allocations. Bidders must submit a 5% bid security and comply with all submission requirements, including local preference applications, drug-free workplace certifications, and proof of licensure as an insured, licensed General Contractor per Walton County Ordinance 2009-01. The contract will be awarded to the lowest, most responsible and responsive bidder. Project funding is provided through Walton County resources, and the procurement contains no specific set-aside designations for disadvantaged enterprises. A Development Order has been issued by the City of DeFuniak Springs, effective February 6, 2025, through February 6, 2026, authorizing project development with specific permitting and regulatory compliance conditions.

View the file

Other files

File Type Posted
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
ESGC_Phase_One_Maintenance_Building.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
11_13_2023_agenda.pdf PDF
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
1_OVERALL_SITE_PLAN.pdf PDF
11_13_2023_agenda.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
11_13_2023_agenda.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB 25-08 Bid Schedule

ITB 25-08 – ESGC Maintenance Building
Walton County, FL
DESCRIPTIONUNITQTYUNIT PRICETOTAL
BASE BID ITEMS
MobilizationLS1
Site Grading and PreparationLS1
Utility Connections (Water/Sewer/Electric)LS1
Building Foundation and SlabLS1
Pre-Engineered Metal Building Shell ErectionLS1
Impact-Rated Doors and WindowsLS1
Exterior Trim and FinishesLS1
ALTERNATE 1 – INTERIOR BUILD-OUT
Interior Framing and DrywallLS1
Interior Doors, Hardware, and TrimLS1
Bathroom Fixtures and AccessoriesLS1
Break Room Casework and FixturesLS1
Flooring (VCT) and Base TrimLS1
CeilingsLS1
Interior PaintingLS1
HVAC System InstallationLS1
Plumbing System InstallationLS1
Electrical System InstallationLS1
ALTERNATE 2 – ACCESS & PARKING
Access Road ConstructionLS1
Parking Lot Base and PavingLS1
ADA Striping and SignageLS1
Stormwater Swales and Drainage FeaturesLS1
OPTIONAL PRICING (IF REQUESTED)
OPTION: Storage Area – 8 ft Interior Metal PanelsLS1
OPTION: Storage Area Floor Finish (Sealed Concrete)LS1
OPTION: Storage Area Floor Finish (Tnemec System)LS1
OPTION: Non-Impact Rated Doors/WindowsLS1
TOTAL BASE BID
TOTAL ALTERNATE 1
TOTAL ALTERNATE 2
TOTAL OPTIONAL ITEMS

File details come from the government source that posted it. Updated .