ITB_25-08_Scope_of_Work_Summary.docx

DOCX document 36 KB Posted

Attached to
ESGC Phase One Maintenance Building
Solicitation number
25-19
Issued by
Walton County, Florida

About this file

The document is an Invitation to Bid (ITB 25-08) issued by Walton County, Florida, for the construction of a maintenance building at the Eagle Springs Golf Course Complex in DeFuniak Springs. The project encompasses a base bid for a pre-engineered metal building of approximately 9,600 square feet, including site preparation, utility connections, foundation, and exterior shell construction. The contract includes two alternates: Alternate 1 covers the interior build-out with framing, finishes, bathrooms, mechanical rooms, and systems installation; Alternate 2 involves site access and parking lot construction. The contract duration is set at 120 days for substantial completion, with an additional 30 days for punch list items.

The bid requires the selected contractor to be an insured, licensed General Contractor in compliance with Walton County Ordinance 2009-01 and obtain a Walton County Building Permit as per Ordinance 2005-29 (amended by 2007-91). The scope of work includes detailed specifications for site grading, utility connections, structural elements, ADA-compliant features, interior systems, and parking infrastructure. Specific requirements include impact-rated doors and windows, HVAC, plumbing, electrical systems, flooring, cabinetry, and coordination with Public Works for right-of-way access if necessary. The project appears to be funded through local county resources, with emphasis on comprehensive facility construction and site development.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB 25-08 – Scope of Work Summary Base Bid – Core Building & Site Work

- Construction of a pre-engineered metal building (approx. 9,600 SF total)

- Rough grading and site prep per civil/structural plans

- Installation of utility connections (water, sewer, electrical stub-outs)

- Foundation and slab per structural drawings

- Exterior shell and roof system per architectural elevations (impact-rated doors and windows included)

- ADA-compliant entry features (excluding parking lot paving) Alternate 1 – Interior Build-Out

- All interior framing and finishes per floor plan A101 and sheets A104-A105

- Bathrooms, break room, mechanical room, and office partitions

- Installation of HVAC, plumbing, and electrical systems per M, P, and E sheets

- Ceilings, VCT flooring, cabinetry, and interior doors/hardware

- ADA fixtures, restroom accessories, and finishes per specifications Alternate 2 – Site Access & Parking

- Access driveway and parking lot paving (asphalt and/or base per site plan)

- Grading, compaction, striping, ADA parking spaces, and stormwater swales

- Coordination with Public Works for ROW if applicable

File details come from the government source that posted it. Updated .