100_percent_Engineers_Estimate.xls
XLS spreadsheet 46 KB Posted
- Attached to
- ESGC Phase One Maintenance Building
- Solicitation number
- 25-19
- Issued by
- Walton County, Florida
About this file
This is an Opinion of Probable Construction Cost document for the Eagle Springs Golf Course Complex Phase One Maintenance Building project, managed by Walton County, Florida. The project involves constructing a pre-engineered metal maintenance facility of approximately 9,600 square feet in DeFuniak Springs, with site development including utility connections, stormwater management, grading, and a retention basin. The base bid encompasses building materials, construction, utility hookups, and site preparation, while two additional alternates provide options for interior build-out and access/parking lot paving. The mandatory pre-bid meeting is scheduled for July 8, 2025, at 8:30 am, with bid responses due by July 30, 2025, at 3:00 pm. The contract duration is 120 days for substantial completion and an additional 30 days for punch list completion. Bidders must be licensed General Contractors in compliance with Walton County Ordinance 2009-01 and must obtain a county building permit subject to Walton County Ordinance 2005-29, as amended.
The total estimated construction cost is $3,283,497.67, with the base bid valued at $1,624,045.09 including mobilization, site work, building shell erection, and utility connections. Alternate 1 for interior build-out (framing, drywall, HVAC, plumbing, electrical systems) is estimated at $805,000.00, Alternate 2 for access and parking lot improvements (concrete, asphalt, storm drainage, landscaping) is $682,853.32, and Alternate 3 for a sewer lift station and forcemain is $171,599.26. A 15% contingency is applied to each cost section. Bidders must submit 5% bid security along with required documentation including local preference applications, drug-free workplace certifications, and proof of licenses. The county will award the contract to the lowest, most responsible and responsive bidder meeting project specifications. Funding is provided through Walton County resources, with project development authorized under a Development Order issued by the City of DeFuniak Springs, effective February 6, 2025, through February 6, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100%_2025
| Eagle Springs Golf Course Maintenance Facility Live Oak Avenue Extension | |||||||||||||||||||||||||||||||||||||||||||||||||
| Walton County, Florida | |||||||||||||||||||||||||||||||||||||||||||||||||
| Opinion of Probable Construction Cost | |||||||||||||||||||||||||||||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | ||||||||||||||||||||||||||||||||||||||||||||
| BASE BID ITEMS | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | Mobilization (5% of site work) | LS | 1 | $ 61,001.64 | $ 61,001.64 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | Maintenance of Traffic | LS | 1 | $ 10,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 3 | Site Grading and Preparation (including stormwater pond) | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 4 | Site Demolition, Clearing and Grubbing, and Cleanup | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 5 | Site Erosion Control | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 6 | Utility Connections (Water/Sewer/Electric) | LS | 1 | $ 110,000.00 | $ 110,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 7 | Building Foundation and Slab | LS | 1 | $ 250,000.00 | $ 250,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 8 | Pre-Engineered Metal Building Shell Erection | LS | 1 | $ 500,000.00 | $ 500,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 9 | Impact-Rated Doors and Windows | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 10 | Insulation and Vapor Barrier | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 11 | Exterior Trim and Finishes | LS | 1 | $ 75,000.00 | $ 75,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 12 | *Regular Excavation | CY | 3958 | $ 15.86 | $ 62,773.88 | ||||||||||||||||||||||||||||||||||||||||||||
| 13 | *Regular Embankment (Fill) | CY | 4040 | $ 16.94 | $ 68,437.60 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 1,412,213.12 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 211,831.97 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 1 – INTERIOR BUILD-OUT | |||||||||||||||||||||||||||||||||||||||||||||||||
| 14 | Interior Framing and Drywall | LS | 1 | $ 160,000.00 | $ 160,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 15 | Interior Doors, Hardware, and Trim | LS | 1 | $ 70,000.00 | $ 70,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 16 | Bathroom Fixtures and Accessories | LS | 1 | $ 65,000.00 | $ 65,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 17 | Break Room Casework, Hardware and Fixtures | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 18 | Flooring (VCT) and Base Trim | LS | 1 | $ 60,000.00 | $ 60,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 19 | Ceilings | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 20 | Interior Painting | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 21 | HVAC System Installation | LS | 1 | $ 125,000.00 | $ 125,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 22 | Plumbing System Installation | LS | 1 | $ 50,000.00 | $ 50,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 23 | Electrical System Installation | LS | 1 | $ 85,000.00 | $ 85,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 700,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 105,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 2 – ACCESS & PARKING | |||||||||||||||||||||||||||||||||||||||||||||||||
| 24 | 6" concrete (sidewalk) | SY | 124 | $ 132.22 | $ 16,395.28 | ||||||||||||||||||||||||||||||||||||||||||||
| 25 | Concrete Wheel Stop | EA | 25 | $ 150.00 | $ 3,750.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 26 | 6" white solid striping (thermoplastic) | GM | 0.08 | $ 6,416.99 | $ 513.36 | ||||||||||||||||||||||||||||||||||||||||||||
| 27 | 6" blue solid striping (thermoplastic) | LF | 94 | $ 7.30 | $ 686.20 | ||||||||||||||||||||||||||||||||||||||||||||
| 28 | 24" Stop Bar | LF | 34 | $ 10.34 | $ 351.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 29 | Handicap symbol | EA | 1 | $ 300.00 | $ 300.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 30 | Preformed White Directional Arrows | EA | 10 | $ 148.80 | $ 1,488.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 31 | Site Single Post Sign w/Panel Less Than 12 sf (excludes ADA signage) | EA | 5 | $ 557.45 | $ 2,787.25 | ||||||||||||||||||||||||||||||||||||||||||||
| 32 | ADA Single Post Sign w/Panel Less Than 12 sf | EA | 1 | $ 557.45 | $ 557.45 | ||||||||||||||||||||||||||||||||||||||||||||
| 33 | 1.5" Asphalt SP 12.5 (roadway and cart path) | TN | 492 | $ 360.00 | $ 177,120.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 34 | 6" Limerock Base (OBG 4) | SY | 6022 | $ 22.00 | $ 132,484.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 35 | 12" Type B Stabilization | SY | 122 | $ 14.96 | $ 1,825.12 | ||||||||||||||||||||||||||||||||||||||||||||
| 36 | Riprap | TN | 19 | $ 217.24 | $ 4,127.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 37 | Type F DBI | EA | 8 | $ 5,600.00 | $ 44,800.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 38 | 18" Mitered End Section (1:4 slope) | EA | 2 | $ 3,300.00 | $ 6,600.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 39 | 30" Double Mitered End Section (one MES @1:2 slope, One MES @1:4 slope) | EA | 2 | $ 5,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 40 | 18" RCP Storm Pipe | LF | 617 | $ 161.00 | $ 99,337.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 41 | 30" RCP Storm Pipe | LF | 92 | $ 329.16 | $ 30,282.72 | ||||||||||||||||||||||||||||||||||||||||||||
| 42 | Performance turf - Sod | SY | 7000 | $ 4.34 | $ 30,380.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 43 | Landscaping and Irrigation | LS | 1 | $ 30,000.00 | $ 30,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 593,785.50 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 89,067.82 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 3 – SEWER LIFT STATION AND FORCEMAIN | |||||||||||||||||||||||||||||||||||||||||||||||||
| 44 | Mobilization (5% of utility work) | LS | 1 | $ 3,386.75 | $ 3,386.75 | ||||||||||||||||||||||||||||||||||||||||||||
| 45 | 4" PVC (SDR35)(Sanitary Sewer, included cleanouts and connections) | LF | 81 | $ 140.00 | $ 11,340.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 46 | 8" PVC (SDR35)(Sanitary Sewer) | LF | 5 | 180 | $ 900.00 | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | |
| 47 | 2" Forcemain (SDR21) (Sanitary Sewer, includes all bends, fittings, and connections) | LF | 1400 | $ 30.00 | $ 42,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 48 | 2" Water service (HDPE, DR9 AWWA C906) | LF | 708 | $ 30.00 | $ 21,240.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 49 | 2" gate valve w/ valve box | EA | 2 | $ 500.00 | $ 1,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 50 | Directional Drill | LF | 30 | $ 55.00 | $ 1,650.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 51 | Manhole | EA | 1 | $ 10,500.00 | $ 10,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 52 | 2" backflow (RPZ) | LS | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 53 | 2" water meter | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 54 | 8"X8"x2" tapping sleeve and valve | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 55 | Grinder Lift Station with Appurtenances | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 56 | Bollards | EA | 4 | $ 300.00 | $ 1,200.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 57 | Site Electrical | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 149,216.75 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 22,382.51 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 171,599.26 | ||||||||||||||||||||||||||||||||||||||||||||||||
| OPTIONAL PRICING (IF REQUESTED) | |||||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area – 8 ft Interior Metal Panels | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Sealed Concrete) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Tnemec System) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Non-Impact Rated Doors/Windows | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL BASE BID | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 1 | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 2 | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 3 | $ 171,599.26 | $ 3,283,497.67 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL OPTIONAL ITEMS |
This is the start of the file's text. The full file is on GovTribe.