ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc

DOC document 66 KB Posted

Attached to
ESGC Phase One Maintenance Building
Solicitation number
25-19
Issued by
Walton County, Florida

About this file

The document is an Intake Meeting Form for Invitation to Bid (ITB) 25-19, involving Walton County, Florida for the Eagle Springs Golf Course (ESGC) Phase One Maintenance Building project. The project involves constructing a maintenance building with a base bid covering building materials, construction, utility hookups, and site grading, with two bid alternates for interior build-out and parking lot paving. The pre-bid meeting is mandatory and scheduled for 5/30 at 9:00 AM, with questions due by 6/12 and bid closing on 6/24/25 at 3:00 PM. The contract duration is 120 days for substantial completion and an additional 30 days for punch list items, with a potential Board of County Commissioners award date to be determined.

The estimated project cost is approximately $1.4 million, with no grant or federal funds involved. The project will require a licensed General Contractor in compliance with Walton County Ordinance 2009-01 and will necessitate obtaining a Walton County Building Permit. Payment will be structured as a unit price contract with potential monthly lump sum progress payments. Local vendor preference is indicated, and the project does not trigger Davis-Bacon Act requirements. Key project personnel include Project Manager Chance or David, with Shane authorized to issue change orders, and Jason Cutshaw serving as the purchasing contact.

View the file

Other files

File Type Posted
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
ESGC_Phase_One_Maintenance_Building.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
11_13_2023_agenda.pdf PDF
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
1_OVERALL_SITE_PLAN.pdf PDF
11_13_2023_agenda.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
11_13_2023_agenda.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated 4/23/2025

SEQ CHAPTER \h \r 1

INTAKE MEETING FORM

CONSTRUCTION CONTRACT

Name of Project:
ITB 25-19 ESGC Phase one maintenance building

Date Rec’d in Purchasing:

Bid Number: ITB 25-19

Intake Meeting Attendees:
Jason, Shane, Matt T, Brad, Scott, Buddy, Dave, David
Has this project been budgeted? Aprox 1.4 mil
Account #:
NEED
Has BCC approved to go forward with this project?
Yes No
@ Which BCC Meeting?
11/13/2023
Are all rights of way, permits, etc., in hand so that contract can be awarded immediately after award by BCC?
Project Manager Chance/ Engineer DRMP Randall Jernigan
Cost of permits to be borne by contractor (per §218.80, F.S. must be disclosed in bid docs or contractor cannot be charged.)
Project Manager / Engineer DRMP

INVITATION TO BID

Drawings/Specs prepared by:
Russell Johnson
Brief description of project:
Project Manager Chance, Shane
Will Purchasing office be closed any days (besides Fridays) prior to the bid close date?
TBD
Cost to obtain copies of bid docs:
N/A (electronic)
If this is a road construction contract, who is responsible for traffic control/signage? WHERE IS THIS SPELLED OUT IN THE DRAWINGS/SPECS/SCOPE OF WORK?
Project Manager (Chance or David)
License Required:
Project Manger

Are Contract Special Conditions (i.e. Pre-Cast Construction, Hot Mix Asphalt, MOT, etc.)

Anything else we need to know?

Project Manager

Instructions to Bidders

How long is bid to remain open and subject to acceptance?
30 days

Bid Form

Name & address of County contact person:
Jason Cutshaw
Phone & FAX numbers of County contact person:
850-892-8176

Ext. 1229

How many days after Notice of Award must signed contract be returned by contractor?
Typically (10)
How many days after Notice to Proceed must work begin?
10
How many days to completion?
SUBSTANTIAL:120

FINAL: 30 (60 for Alt)

Will a Limited Notice to Proceed be necessary for any long lead time materials? TBD PM

Contract

Hours of Work
Daylight – Dark

M-S Other:

Payment options Default payment is UNIT PRICE(req bid sched)
Unit Price Not-To-Exceed
__X_ Lump Sum Proposal
___Lump Sum @ Completion
____ Progress Payments
If progress payments are to be made, provide details concerning schedule:
Lump sum per month
Estimated value of contract (in order to calculate liquidated damages):
DRMP NEED!
Who has authority to issue change orders?
Shane
Who is designated project manager?
Chance or David
Who is the Purchasing contact?
Jason Cutshaw
Are grant funds being used for this project? If so, please provide copy of grant contract. When does grant K expire?
No
Local Vendor Preference:

Yes: X No:

Are federal funds being used to fund this project? (Does Davis-Bacon Act apply?)
No
Local Vendor Preference:

Yes: No:

Are there any special warranty or guarantee conditions (i.e., for live plants)?

THINGS TO SAY OUT LOUD AT THE PREBID MEETING:
PM, ENG, Legal,

Insurance, Lead time on materials, Sewer plan,

Legal to complete front end documents by:
CR

§255.0525, F.S.

Projects in excess of $200K – must advertise at least once in newspaper 21 days prior to bid opening and 5 days prior to any scheduled pre-bid meeting

Projects in excess of $500K – must be advertised at least once in a newspaper 30 days prior to bid opening and 5 days prior to any scheduled pre-bid meeting

Pre-Bid Meeting

Date: 5/30 Time: 9 Mandatory?

YES

LOCATION: CPD

Conference Bridge: 850-635-0655, 261217

Questions/requests for clarification must be submitted to Purchasing by: 6/12

Close Bidding

Date:

6/24/25

Time: 3:00 pm

Open Bids

Immediately Following

Begin Advertisement: TBD 5/23

BCC Award Date:TBD

NOTE: IF THERE ARE ALTERNATES TO THE BID, BE SURE BID SCHEDULE CONTAINS A LINE ITEM FOR COST OF BOND FOR THE ALTERNATE.

W:\Board of County Commissioners\Central Purchasing\PURCHASING\Solicitation ITB\ITB 2025\ITB 25-10 11 Maint Building Eagle Springs\ITB 25-08 ESGC Maint Bldg Intake Meeting Form .doc 7/2/2012 W:\Board of County Commissioners\Central Purchasing\PURCHASING\Solicitation ITB\ITB 2025\ITB 25-10 11 Maint Building Eagle Springs\ITB 25-08 ESGC Maint Bldg Intake Meeting Form .doc

File details come from the government source that posted it. Updated .