This Overall Site Plan document is an engineering drawing prepared for Walton County, Florida's Eagle Springs Golf Course Complex maintenance facility project in DeFuniak Springs. The plan illustrates the proposed 24,970 square foot project site layout, including the planned maintenance building construction, utility infrastructure (water, sewer, and electrical systems with specified pipe diameters and service locations), stormwater management facilities, a dry retention basin, site grading with elevation contours ranging from approximately 247 feet to 271 feet, and cart path modifications due to Live Oak Road Extension construction. The site plan identifies existing conditions including a railroad right-of-way (CSX and B&W Harbeson Lumber Company lines with 100-foot clearances), surrounding roadways (Live Oak Avenue, Country Club Lane, 26th Street), a Uniti Fiber box requiring potential relocation, and specific removal and capping requirements for existing infrastructure. The plan was prepared by DRMP, Inc., a licensed engineering firm (Certificate of Authorization No. 26486853), with design responsibility assigned to Ryan R. Culton, P.E., and is dated August 2022 under project number 19-0328.010.

The site plan establishes the technical baseline for construction bid specifications, indicating the precise locations of utility connections at designated control points (CP1 and CP2 with specific coordinates and elevations), grading requirements, and infrastructure modifications necessary for the approximately 9,600 square foot pre-engineered metal building. The plan's topographic survey data and utility mapping directly support the invitation to bid process, ensuring that contractors can accurately assess site conditions, utility availability, and construction logistics for submission of competitive bids due July 30, 2025, with project completion required within 120 days of contract award plus 30 days for punch list items.

View the file

Other files

File Type Posted
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
ESGC_Phase_One_Maintenance_Building_(Addendum_#5_Revision).pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
P22-0080_Geotechnical_Report_-_Eagle_Springs_Additions.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET.pdf PDF
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
ITB_25_19_ESGC_PHASE_1_MAINT._BUILDING_ATTENDANCE_SHEET_Updated.docx DOCX document
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_MAINTENANCE_BLDG_Arch_Plans.pdf PDF
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
ESGC_Phase_One_Maintenance_Building.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
Contract_No._25-19.pdf PDF
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
100_percent_Engineers_Estimate.xls XLS spreadsheet
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
2025.06.24_PLAN_SET.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_CIVIL_PLAN_SET_signed.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
Eagle_Springs_DO.pdf PDF
11_13_2023_agenda.pdf PDF
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
11_13_2023_agenda.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
23-1518_-_Pdf_agenda_item.pdf PDF
Excerpt_from_11-13-23_BCC_Meeting_Minutes_(See_Item_#32).pdf PDF
ITB_25-08_Scope_of_Work_Summary.docx DOCX document
1_OVERALL_SITE_PLAN.pdf PDF
ITB_25-19_ESGC_Maint_Bldg_Intake_Meeting_Form_.doc DOC document
11_13_2023_agenda.pdf PDF
ITB_25-08_Bid_Schedule_Template.xlsx XLSX spreadsheet
EAGLE_SPRINGS_OWNER_REVIEW_05.17.23.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS

OE

OE

OE

OE

OE

OE

OE

OE

OE

O E

O E

O E

OE

O E

OE

OE

X

X

X X

DLP 2" PVCDLP 2" PVC

18" TWIN

18"

18"18"

18" 20"

18"

22"

22"

FAUCET

8" PINE

12" OAK

12" OAK

20"

17"

17" 17"

17"

17"12"

15"

12"12"

12"

12"

12"

24"20"

18"10" 10"

10"

10"

10" 25"

25"

PWR SRVC

24"

24"

24"

24"

24"

SSS STOP

PMPSTCO

CP1

SET

8' IRC

"DRMP LB2648"

N:632367.290

E:1453230.365

ELEV:271.64'

CP2

SET

8' IRC

"DRMP LB2648"

N:632038.087

E:1453833.778

ELEV:259.62'

260.71

SET NL 60D

267.64

SET NL 60D

269.82

SET NL 60D

269.71

SET NL 60D

266.17

SET NL 60D

S61° 23' 04"E 687.37'

7'

268' 269'

270'

271'

271'

270'

269'

268' 267'26

6'26 5'

0'

9'

8'

267'

6'

5' 26

4' 26 3' 26

2'

1'

0'

9' 258'

263'

262'

1'

260'

260'

261'

259'

259'

259'

8'

8'

9'

8'

7'

6'

5'

4'

253'

2'

1'

6'

247'

3'

252'

0'

249' 248'

8'

253'

252'

251'

251'

252'

253'

0'252'

250'

267'

255'

253'254'

260'

265'

256'257'258'259' 261'262'263'264'

THE PROPOSED IMPROVEMENTS HAVE

THIS CONCRETE PAD BEING REMOVED.

AND WATER CAPPED/ABANDONED

THERE IS A UNITI FIBER BOX HERE. THIS BOX WAS NOT

LOCATED ON THE SURVEY. IT DOES NOT SEEM THE

PROPOSED IMPROVEMENTS/GRADING WOULD IMPACT IT.

TEE BOX WOULD BE REMOVED

RE-ROUTED CART PATH DUE TO LIVE

OAK ROAD EXTENSION CONSTRUCTION

PROPOSED BUILDING

S.W.M.F.

US HWY 331

CO

U

N

TR

Y

CL

U B

LA

N

E

LIV

E OAK AVE EXTENSIO

N

08/2022

19-0328.010

State of Florida # 85751

RYAN R. CULTON, P.E.

W

AL

TO

N

C O

U N

TY

, F

LO

RI

DA

EA

G

LE

S

PR

IN

G S

G O

LF

C

O U

RS

E

M

AI

N

TE

N

AN

CE

F

AC

IL

IT

Y

D R M P

C e r t i f i c a t e o f

A u t h o r i z a t i o n

N o

S

W h r e e t

S u i e

B o c a

R a t o n

F

L

P h o n e

F a x

W D

R M

P C

O M

E N

G I N

E E

U R

V E

Y O

P

L A

N N

E

C I E

N T

I S

T S

DRMP, Inc.

AS SHOWN

O V

E R

A L L

S

I T

E

P

L A

N

GRAPHIC SCALE

0 60 90 120

SCALE: 1" = 60'

AutoCAD SHX Text

LIVE OAK AVENUE W

AutoCAD SHX Text

W B HARBESON LUMBER COMPANY RAILROAD (100' RIGHT-OF-WAY)

AutoCAD SHX Text

INV=247.24'

AutoCAD SHX Text

INV=247.43'

AutoCAD SHX Text

INV=247.53'

AutoCAD SHX Text

(18' CMP)

AutoCAD SHX Text

26TH STREET

AutoCAD SHX Text

20' EASEMENT

AutoCAD SHX Text

CSX RAILROAD (100' RIGHT-OF-WAY)

AutoCAD SHX Text

TOPOGRAPHIC LIMITS

AutoCAD SHX Text

TOPOGRAPHIC LIMITS

AutoCAD SHX Text

DRAWING:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DO NOT SCALE THIS DRAWING - DIMENSIONS AND NOTES TAKE PREFERENCE

AutoCAD SHX Text R E V I S I O N S

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

RAJ

AutoCAD SHX Text

RAJ

AutoCAD SHX Text

MZ

AutoCAD SHX Text

RRC

File details come from the government source that posted it. Updated .