About this file
This is an Opinion of Probable Construction Cost estimate prepared for Walton County, Florida for the ESGC Phase One Maintenance Building project at Eagle Springs Golf Course Complex in DeFuniak Springs. The project involves construction of a pre-engineered metal building maintenance facility of approximately 9,600 square feet on a 24,970 square foot site, including site preparation, utility connections, building shell erection, and infrastructure development. The base bid encompasses mobilization, site grading, demolition and clearing, erosion control, water/sewer/electric utility connections, building foundation and slab, metal building shell erection, impact-rated doors and windows, insulation, exterior finishes, and earthwork totaling $1,412,213.12 before contingency. The project includes three bid alternates: Alternate 1 for interior build-out featuring framing, drywall, bathrooms, flooring, ceilings, painting, HVAC, plumbing, and electrical systems ($700,000.00); Alternate 2 for access and parking with concrete sidewalks, asphalt paving, storm drainage, landscaping, and signage ($593,785.50); and Alternate 3 for sewer lift station installation and forcemain with grinder station and site electrical work ($149,216.75). A mandatory pre-bid meeting is scheduled for July 8, 2025, at 8:30 am with bid responses due July 30, 2025, at 3:00 pm. The contract term is 120 days to substantial completion with an additional 30 days for punch list completion.
The total project cost is estimated at $3,283,497.67 including a 15% contingency applied to the base bid and each alternate. The base bid total with contingency is $1,624,045.09, Alternate 1 totals $805,000.00, Alternate 2 totals $682,853.32, and Alternate 3 totals $171,599.26. A 5% bid security deposit is required from all bidders. The project will be funded through Walton County resources with no specific disadvantaged enterprise set-aside designations indicated. The contractor must be an insured, licensed General Contractor in accordance with Walton County Ordinance 2009-01 and must obtain a Walton County Building Permit subject to applicable ordinances. Award will be made to the lowest, most responsible and responsive bidder meeting project specifications. Optional pricing items for storage area finishes and alternative door/window ratings are available but pricing has not been established in this estimate document.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100%_2025
| Eagle Springs Golf Course Maintenance Facility Live Oak Avenue Extension | |||||||||||||||||||||||||||||||||||||||||||||||||
| Walton County, Florida | |||||||||||||||||||||||||||||||||||||||||||||||||
| Opinion of Probable Construction Cost | |||||||||||||||||||||||||||||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | ||||||||||||||||||||||||||||||||||||||||||||
| BASE BID ITEMS | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | Mobilization (5% of site work) | LS | 1 | $ 61,001.64 | $ 61,001.64 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | Maintenance of Traffic | LS | 1 | $ 10,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 3 | Site Grading and Preparation (including stormwater pond) | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 4 | Site Demolition, Clearing and Grubbing, and Cleanup | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 5 | Site Erosion Control | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 6 | Utility Connections (Water/Sewer/Electric) | LS | 1 | $ 110,000.00 | $ 110,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 7 | Building Foundation and Slab | LS | 1 | $ 250,000.00 | $ 250,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 8 | Pre-Engineered Metal Building Shell Erection | LS | 1 | $ 500,000.00 | $ 500,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 9 | Impact-Rated Doors and Windows | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 10 | Insulation and Vapor Barrier | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 11 | Exterior Trim and Finishes | LS | 1 | $ 75,000.00 | $ 75,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 12 | *Regular Excavation | CY | 3958 | $ 15.86 | $ 62,773.88 | ||||||||||||||||||||||||||||||||||||||||||||
| 13 | *Regular Embankment (Fill) | CY | 4040 | $ 16.94 | $ 68,437.60 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 1,412,213.12 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 211,831.97 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 1 – INTERIOR BUILD-OUT | |||||||||||||||||||||||||||||||||||||||||||||||||
| 14 | Interior Framing and Drywall | LS | 1 | $ 160,000.00 | $ 160,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 15 | Interior Doors, Hardware, and Trim | LS | 1 | $ 70,000.00 | $ 70,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 16 | Bathroom Fixtures and Accessories | LS | 1 | $ 65,000.00 | $ 65,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 17 | Break Room Casework, Hardware and Fixtures | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 18 | Flooring (VCT) and Base Trim | LS | 1 | $ 60,000.00 | $ 60,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 19 | Ceilings | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 20 | Interior Painting | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 21 | HVAC System Installation | LS | 1 | $ 125,000.00 | $ 125,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 22 | Plumbing System Installation | LS | 1 | $ 50,000.00 | $ 50,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 23 | Electrical System Installation | LS | 1 | $ 85,000.00 | $ 85,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 700,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 105,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 2 – ACCESS & PARKING | |||||||||||||||||||||||||||||||||||||||||||||||||
| 24 | 6" concrete (sidewalk) | SY | 124 | $ 132.22 | $ 16,395.28 | ||||||||||||||||||||||||||||||||||||||||||||
| 25 | Concrete Wheel Stop | EA | 25 | $ 150.00 | $ 3,750.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 26 | 6" white solid striping (thermoplastic) | GM | 0.08 | $ 6,416.99 | $ 513.36 | ||||||||||||||||||||||||||||||||||||||||||||
| 27 | 6" blue solid striping (thermoplastic) | LF | 94 | $ 7.30 | $ 686.20 | ||||||||||||||||||||||||||||||||||||||||||||
| 28 | 24" Stop Bar | LF | 34 | $ 10.34 | $ 351.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 29 | Handicap symbol | EA | 1 | $ 300.00 | $ 300.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 30 | Preformed White Directional Arrows | EA | 10 | $ 148.80 | $ 1,488.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 31 | Site Single Post Sign w/Panel Less Than 12 sf (excludes ADA signage) | EA | 5 | $ 557.45 | $ 2,787.25 | ||||||||||||||||||||||||||||||||||||||||||||
| 32 | ADA Single Post Sign w/Panel Less Than 12 sf | EA | 1 | $ 557.45 | $ 557.45 | ||||||||||||||||||||||||||||||||||||||||||||
| 33 | 1.5" Asphalt SP 12.5 (roadway and cart path) | TN | 492 | $ 360.00 | $ 177,120.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 34 | 6" Limerock Base (OBG 4) | SY | 6022 | $ 22.00 | $ 132,484.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 35 | 12" Type B Stabilization | SY | 122 | $ 14.96 | $ 1,825.12 | ||||||||||||||||||||||||||||||||||||||||||||
| 36 | Riprap | TN | 19 | $ 217.24 | $ 4,127.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 37 | Type F DBI | EA | 8 | $ 5,600.00 | $ 44,800.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 38 | 18" Mitered End Section (1:4 slope) | EA | 2 | $ 3,300.00 | $ 6,600.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 39 | 30" Double Mitered End Section (one MES @1:2 slope, One MES @1:4 slope) | EA | 2 | $ 5,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 40 | 18" RCP Storm Pipe | LF | 617 | $ 161.00 | $ 99,337.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 41 | 30" RCP Storm Pipe | LF | 92 | $ 329.16 | $ 30,282.72 | ||||||||||||||||||||||||||||||||||||||||||||
| 42 | Performance turf - Sod | SY | 7000 | $ 4.34 | $ 30,380.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 43 | Landscaping and Irrigation | LS | 1 | $ 30,000.00 | $ 30,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 593,785.50 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 89,067.82 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 3 – SEWER LIFT STATION AND FORCEMAIN | |||||||||||||||||||||||||||||||||||||||||||||||||
| 44 | Mobilization (5% of utility work) | LS | 1 | $ 3,386.75 | $ 3,386.75 | ||||||||||||||||||||||||||||||||||||||||||||
| 45 | 4" PVC (SDR35)(Sanitary Sewer, included cleanouts and connections) | LF | 81 | $ 140.00 | $ 11,340.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 46 | 8" PVC (SDR35)(Sanitary Sewer) | LF | 5 | 180 | $ 900.00 | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | |
| 47 | 2" Forcemain (SDR21) (Sanitary Sewer, includes all bends, fittings, and connections) | LF | 1400 | $ 30.00 | $ 42,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 48 | 2" Water service (HDPE, DR9 AWWA C906) | LF | 708 | $ 30.00 | $ 21,240.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 49 | 2" gate valve w/ valve box | EA | 2 | $ 500.00 | $ 1,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 50 | Directional Drill | LF | 30 | $ 55.00 | $ 1,650.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 51 | Manhole | EA | 1 | $ 10,500.00 | $ 10,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 52 | 2" backflow (RPZ) | LS | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 53 | 2" water meter | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 54 | 8"X8"x2" tapping sleeve and valve | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 55 | Grinder Lift Station with Appurtenances | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 56 | Bollards | EA | 4 | $ 300.00 | $ 1,200.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 57 | Site Electrical | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 149,216.75 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 22,382.51 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 171,599.26 | ||||||||||||||||||||||||||||||||||||||||||||||||
| OPTIONAL PRICING (IF REQUESTED) | |||||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area – 8 ft Interior Metal Panels | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Sealed Concrete) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Tnemec System) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Non-Impact Rated Doors/Windows | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL BASE BID | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 1 | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 2 | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 3 | $ 171,599.26 | $ 3,283,497.67 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL OPTIONAL ITEMS |