The document is a 100% Engineers Estimate for the Eagle Springs Golf Course Maintenance Facility Live Oak Avenue Extension project in Walton County, Florida. The project involves constructing a maintenance building with a base bid and three alternates, including the main building construction, interior build-out, access and parking, and a sewer lift station. The contract duration is 120 days for substantial completion with an additional 30 days for punch list completion. The project requires a licensed General Contractor who must obtain a Walton County Building Permit.
The total estimated project cost is $3,283,497.67, broken down into base bid ($1,624,045.09), Alternate 1 interior build-out ($805,000.00), Alternate 2 access and parking ($682,853.32), and Alternate 3 sewer lift station ($171,599.26). The estimate includes a 15% contingency for each alternate and covers various construction elements such as site preparation, utility connections, building shell, foundation, interior systems, parking infrastructure, and sewer infrastructure. Optional pricing is also included for potential additional storage area improvements. The project requires the contractor to be insured and licensed in accordance with Walton County ordinances.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100%_2025
| Eagle Springs Golf Course Maintenance Facility Live Oak Avenue Extension | |||||||||||||||||||||||||||||||||||||||||||||||||
| Walton County, Florida | |||||||||||||||||||||||||||||||||||||||||||||||||
| Opinion of Probable Construction Cost | |||||||||||||||||||||||||||||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | ||||||||||||||||||||||||||||||||||||||||||||
| BASE BID ITEMS | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | Mobilization (5% of site work) | LS | 1 | $ 61,001.64 | $ 61,001.64 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | Maintenance of Traffic | LS | 1 | $ 10,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 3 | Site Grading and Preparation (including stormwater pond) | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 4 | Site Demolition, Clearing and Grubbing, and Cleanup | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 5 | Site Erosion Control | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 6 | Utility Connections (Water/Sewer/Electric) | LS | 1 | $ 110,000.00 | $ 110,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 7 | Building Foundation and Slab | LS | 1 | $ 250,000.00 | $ 250,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 8 | Pre-Engineered Metal Building Shell Erection | LS | 1 | $ 500,000.00 | $ 500,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 9 | Impact-Rated Doors and Windows | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 10 | Insulation and Vapor Barrier | LS | 1 | $ 100,000.00 | $ 100,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 11 | Exterior Trim and Finishes | LS | 1 | $ 75,000.00 | $ 75,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 12 | *Regular Excavation | CY | 3958 | $ 15.86 | $ 62,773.88 | ||||||||||||||||||||||||||||||||||||||||||||
| 13 | *Regular Embankment (Fill) | CY | 4040 | $ 16.94 | $ 68,437.60 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 1,412,213.12 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 211,831.97 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 1 – INTERIOR BUILD-OUT | |||||||||||||||||||||||||||||||||||||||||||||||||
| 14 | Interior Framing and Drywall | LS | 1 | $ 160,000.00 | $ 160,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 15 | Interior Doors, Hardware, and Trim | LS | 1 | $ 70,000.00 | $ 70,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 16 | Bathroom Fixtures and Accessories | LS | 1 | $ 65,000.00 | $ 65,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 17 | Break Room Casework, Hardware and Fixtures | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 18 | Flooring (VCT) and Base Trim | LS | 1 | $ 60,000.00 | $ 60,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 19 | Ceilings | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 20 | Interior Painting | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 21 | HVAC System Installation | LS | 1 | $ 125,000.00 | $ 125,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 22 | Plumbing System Installation | LS | 1 | $ 50,000.00 | $ 50,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 23 | Electrical System Installation | LS | 1 | $ 85,000.00 | $ 85,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 700,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 105,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 2 – ACCESS & PARKING | |||||||||||||||||||||||||||||||||||||||||||||||||
| 24 | 6" concrete (sidewalk) | SY | 124 | $ 132.22 | $ 16,395.28 | ||||||||||||||||||||||||||||||||||||||||||||
| 25 | Concrete Wheel Stop | EA | 25 | $ 150.00 | $ 3,750.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 26 | 6" white solid striping (thermoplastic) | GM | 0.08 | $ 6,416.99 | $ 513.36 | ||||||||||||||||||||||||||||||||||||||||||||
| 27 | 6" blue solid striping (thermoplastic) | LF | 94 | $ 7.30 | $ 686.20 | ||||||||||||||||||||||||||||||||||||||||||||
| 28 | 24" Stop Bar | LF | 34 | $ 10.34 | $ 351.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 29 | Handicap symbol | EA | 1 | $ 300.00 | $ 300.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 30 | Preformed White Directional Arrows | EA | 10 | $ 148.80 | $ 1,488.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 31 | Site Single Post Sign w/Panel Less Than 12 sf (excludes ADA signage) | EA | 5 | $ 557.45 | $ 2,787.25 | ||||||||||||||||||||||||||||||||||||||||||||
| 32 | ADA Single Post Sign w/Panel Less Than 12 sf | EA | 1 | $ 557.45 | $ 557.45 | ||||||||||||||||||||||||||||||||||||||||||||
| 33 | 1.5" Asphalt SP 12.5 (roadway and cart path) | TN | 492 | $ 360.00 | $ 177,120.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 34 | 6" Limerock Base (OBG 4) | SY | 6022 | $ 22.00 | $ 132,484.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 35 | 12" Type B Stabilization | SY | 122 | $ 14.96 | $ 1,825.12 | ||||||||||||||||||||||||||||||||||||||||||||
| 36 | Riprap | TN | 19 | $ 217.24 | $ 4,127.56 | ||||||||||||||||||||||||||||||||||||||||||||
| 37 | Type F DBI | EA | 8 | $ 5,600.00 | $ 44,800.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 38 | 18" Mitered End Section (1:4 slope) | EA | 2 | $ 3,300.00 | $ 6,600.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 39 | 30" Double Mitered End Section (one MES @1:2 slope, One MES @1:4 slope) | EA | 2 | $ 5,000.00 | $ 10,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 40 | 18" RCP Storm Pipe | LF | 617 | $ 161.00 | $ 99,337.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 41 | 30" RCP Storm Pipe | LF | 92 | $ 329.16 | $ 30,282.72 | ||||||||||||||||||||||||||||||||||||||||||||
| 42 | Performance turf - Sod | SY | 7000 | $ 4.34 | $ 30,380.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 43 | Landscaping and Irrigation | LS | 1 | $ 30,000.00 | $ 30,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 593,785.50 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 89,067.82 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ALTERNATE 3 – SEWER LIFT STATION AND FORCEMAIN | |||||||||||||||||||||||||||||||||||||||||||||||||
| 44 | Mobilization (5% of utility work) | LS | 1 | $ 3,386.75 | $ 3,386.75 | ||||||||||||||||||||||||||||||||||||||||||||
| 45 | 4" PVC (SDR35)(Sanitary Sewer, included cleanouts and connections) | LF | 81 | $ 140.00 | $ 11,340.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 46 | 8" PVC (SDR35)(Sanitary Sewer) | LF | 5 | 180 | $ 900.00 | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | 8" PVC (SDR35)(Sanitary Sewer) | |
| 47 | 2" Forcemain (SDR21) (Sanitary Sewer, includes all bends, fittings, and connections) | LF | 1400 | $ 30.00 | $ 42,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 48 | 2" Water service (HDPE, DR9 AWWA C906) | LF | 708 | $ 30.00 | $ 21,240.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 49 | 2" gate valve w/ valve box | EA | 2 | $ 500.00 | $ 1,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 50 | Directional Drill | LF | 30 | $ 55.00 | $ 1,650.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 51 | Manhole | EA | 1 | $ 10,500.00 | $ 10,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 52 | 2" backflow (RPZ) | LS | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 53 | 2" water meter | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 54 | 8"X8"x2" tapping sleeve and valve | EA | 1 | $ 2,000.00 | $ 2,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 55 | Grinder Lift Station with Appurtenances | LS | 1 | $ 35,000.00 | $ 35,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 56 | Bollards | EA | 4 | $ 300.00 | $ 1,200.00 | ||||||||||||||||||||||||||||||||||||||||||||
| 57 | Site Electrical | LS | 1 | $ 15,000.00 | $ 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
| SUB-TOTAL | $ 149,216.75 | ||||||||||||||||||||||||||||||||||||||||||||||||
| CONTINGENCY (15%) | $ 22,382.51 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 171,599.26 | ||||||||||||||||||||||||||||||||||||||||||||||||
| OPTIONAL PRICING (IF REQUESTED) | |||||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area – 8 ft Interior Metal Panels | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Sealed Concrete) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Storage Area Floor Finish (Tnemec System) | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| OPTION: Non-Impact Rated Doors/Windows | LS | 1 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL BASE BID | $ 1,624,045.09 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 1 | $ 805,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 2 | $ 682,853.32 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL ALTERNATE 3 | $ 171,599.26 | $ 3,283,497.67 | |||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL OPTIONAL ITEMS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .