ITB_25-08_Bid_Schedule_Template.xlsx
XLSX spreadsheet 9 KB Posted
- Attached to
- ESGC Phase One Maintenance Building
- Solicitation number
- 25-19
- Issued by
- Walton County, Florida
About this file
ESGC Phase One Maintenance Building Bid Schedule Summary
This is a bid schedule template for Invitation to Bid (ITB) #25-08 issued by Walton County, Florida, for the construction of the ESGC Phase One Maintenance Building at the Eagle Springs Golf Course Complex in DeFuniak Springs. The project encompasses construction of a pre-engineered metal maintenance facility of approximately 9,600 square feet on a 24,970-square-foot site. The base bid includes mobilization, site grading and preparation, utility connections (water, sewer, and electric), building foundation and slab, metal building shell erection, impact-rated doors and windows, and exterior trim and finishes. Alternate 1 covers interior build-out including framing, drywall, doors, hardware, bathroom fixtures, break room casework, flooring, ceilings, painting, HVAC, plumbing, and electrical systems. Alternate 2 addresses access road construction, parking lot base and paving, ADA striping and signage, and stormwater drainage features. Optional pricing items include storage area configurations with interior metal panels and floor finish options, as well as non-impact-rated door and window alternatives. A mandatory pre-bid meeting was scheduled for July 8, 2025, at 8:30 a.m., with bid responses due July 30, 2025, at 3:00 p.m. The contract duration is 120 days to substantial completion plus an additional 30 days for punch list completion.
The total estimated project cost is $3,283,497.67, comprising the base bid of $1,624,045.09, Alternate 1 interior build-out of $805,000.00, Alternate 2 access and parking of $682,853.32, and a sewer lift station component of $171,599.26, with 15 percent contingency included for each alternate. Bidders must submit a 5 percent bid security and provide comprehensive documentation including local preference applications, drug-free workplace certifications, and proof of licenses. The selected contractor must be a licensed General Contractor in compliance with Walton County Ordinance 2009-01 and must obtain a county building permit under Ordinance 2005-29. The project will be funded through Walton County resources, and the county will award the contract to the lowest, most responsible and responsive bidder meeting project specifications. A Development Order issued by the City of DeFuniak Springs is effective from February 6, 2025, through February 6, 2026, authorizing project development with specific permitting and regulatory compliance conditions. No incumbent vendors are identified, and no specific set-aside designations for disadvantaged enterprises are indicated in the procurement documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 25-08 Bid Schedule
| ITB 25-08 – ESGC Maintenance Building | ||||
| Walton County, FL | ||||
| DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| BASE BID ITEMS | ||||
| Mobilization | LS | 1 | ||
| Site Grading and Preparation | LS | 1 | ||
| Utility Connections (Water/Sewer/Electric) | LS | 1 | ||
| Building Foundation and Slab | LS | 1 | ||
| Pre-Engineered Metal Building Shell Erection | LS | 1 | ||
| Impact-Rated Doors and Windows | LS | 1 | ||
| Exterior Trim and Finishes | LS | 1 | ||
| ALTERNATE 1 – INTERIOR BUILD-OUT | ||||
| Interior Framing and Drywall | LS | 1 | ||
| Interior Doors, Hardware, and Trim | LS | 1 | ||
| Bathroom Fixtures and Accessories | LS | 1 | ||
| Break Room Casework and Fixtures | LS | 1 | ||
| Flooring (VCT) and Base Trim | LS | 1 | ||
| Ceilings | LS | 1 | ||
| Interior Painting | LS | 1 | ||
| HVAC System Installation | LS | 1 | ||
| Plumbing System Installation | LS | 1 | ||
| Electrical System Installation | LS | 1 | ||
| ALTERNATE 2 – ACCESS & PARKING | ||||
| Access Road Construction | LS | 1 | ||
| Parking Lot Base and Paving | LS | 1 | ||
| ADA Striping and Signage | LS | 1 | ||
| Stormwater Swales and Drainage Features | LS | 1 | ||
| OPTIONAL PRICING (IF REQUESTED) | ||||
| OPTION: Storage Area – 8 ft Interior Metal Panels | LS | 1 | ||
| OPTION: Storage Area Floor Finish (Sealed Concrete) | LS | 1 | ||
| OPTION: Storage Area Floor Finish (Tnemec System) | LS | 1 | ||
| OPTION: Non-Impact Rated Doors/Windows | LS | 1 | ||
| TOTAL BASE BID | ||||
| TOTAL ALTERNATE 1 | ||||
| TOTAL ALTERNATE 2 | ||||
| TOTAL OPTIONAL ITEMS |