Emergency Purchase - I-69 Repairs
Awarded State & local contract opportunity Posted
- Solicitation number
- RFQ 605 2600000028 2
- State
- Kentucky
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
Show all 25
- 95121647 Elevated roadway or highway
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141001 Highway and road new construction service
- 72141106 Gravel or dirt road construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- Point of contact
-
- Laura Hagan laura.hagan@ky.gov (502) 782-3980
Updated .
About this opportunity
The Commonwealth of Kentucky Transportation Cabinet (KYTC) is issuing a Request for Quote (RFQ 26.28) for emergency grouting repairs on Interstate 69 in Hopkins County, Kentucky, at mile posts 110.9 to 111.11. This is an emergency procurement involving comprehensive roadway rehabilitation to address mine subsidence issues caused by underground coal mine voids beneath the highway. The scope of work includes grouting operations (mobilization, drilling of 10,000 linear feet, curtain grout installation of 3,000 cubic yards, and infill grout installation of 9,000 cubic yards), asphalt and paving work (milling and texturing 1,000 tons, applying 1,000 tons of CL4 asphalt surface, and installing thermoplastic striping), traffic control and maintenance, temporary signage, law enforcement officer hours, queue warning systems, and demobilization services. Contractors must be prequalified in work item I-39 or J-21 for grouting work and work item C1 for roadway work, with qualified personnel required to meet minimum experience standards. Deliverables include preconstruction submittals (personnel qualifications, references, installation and work plans, and grout mix designs), real-time monitoring and data collection during operations, and comprehensive daily records and logs. A mandatory pre-bid virtual meeting is scheduled for April 10, 2026, at 12:00 p.m. Eastern Time (meeting link requested via email to Laura.Hagan@ky.gov), with written questions due by 5:00 p.m. on April 10th and responses posted by 5:00 p.m. on April 11th. Electronic bids are due by 1:30 p.m. Eastern on April 13, 2026, with a tentative award date of April 14, 2026. Work must commence within five calendar days of contract execution, with grouting work completed within 60 days of the start date and overall project completion required within 90 calendar days. Evaluation is based on prequalification status (pass/fail) and price (100 points), with the lowest responsive bidder receiving the award.
This procurement carries no designated set-asides for disadvantaged business enterprises (DBE goal of 0%), though contractors are encouraged to consider DBE participation. The project is federally funded through the Federal Highway Administration, requiring compliance with Davis-Bacon Act wage determinations, Buy America provisions, and Build America, Buy America (BABA) Act requirements, meaning all steel, iron, and manufactured products must be domestically produced. All bidders must be registered in the Kentucky eProcurement System and submit bids electronically only; hard copies and emailed bids will not be accepted, and contractors submitting bids without attending the mandatory pre-bid meeting will be deemed non-responsive. A performance and payment bond equal to 100% of the contract total is required within two business days of contract execution. Contractors must maintain Commercial General Liability Insurance with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, along with applicable automobile liability and workers' compensation insurance. Liquidated damages will be assessed if work does not commence within five days or if grouting is not completed within 60 days of the start date, calculated per KYTC Standard Specifications Section 108.09. The bid sheet submitted contains all quantities listed as zero dollars, indicating this is a blank template requiring bidders to provide complete pricing information, with estimated quantities noted as non-binding; no incumbent vendors or award value ranges are specified in the available documentation.
Files
| File | Type | Posted |
|---|---|---|
| Hopkins 2-0013.00 Bid Package.pdf | ||
| RFQ 26.28 Bid Sheet - I-69 Repairs.xlsx | XLSX spreadsheet | |
| Final_RFQ_605_2600000028_2_SO_FORM.PDF | ||
| Final_RFQ_605_2600000028_1_SO_FORM.PDF |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity