Brevard County is procuring a comprehensive muck removal project for the Eau Gallie Dredge Area A1 in the Indian River Lagoon, involving hydraulic dredging of approximately 189,972 cubic yards of organic sediments, with options for three alternate bid items that could add up to 108,782 additional cubic yards. The project requires the contractor to perform hydraulic dredging, dewatering, and disposal of sediments using the Florida Inland Navigation District's (FIND) Dredge Material Management Area (DMMA) BV-52 along US-1 Highway. Key deliverables include developing and obtaining approval for detailed dredging, dewatering, spoil handling, and disposal plans that comply with all federal, state, and local permits and regulations. The bid opening is scheduled for February 4, 2025, at 2:00 PM, with a non-mandatory pre-bid meeting previously held on December 12, 2024. The project has a substantial completion timeline of 730 calendar days, with an additional 60 days for final completion. Evaluation will be based on the lowest responsive total bid amount, including base and alternate pay sections, with the contractor responsible for all aspects of material removal, transportation, and DMMA restoration.

The procurement does not specify explicit set-aside designations for disadvantaged enterprises. The sole vendor currently listed in the bid tabulation is Waterfront Property Services, LLC DBA Gator Dredging from Clearwater, FL. The project will utilize existing infrastructure, including the FIND DMMA BV-52, which has been previously surveyed for environmental considerations such as gopher tortoise burrows. The estimated construction budget is $18,500,000, with the contractor required to provide a 5% bid bond and a 100% public construction bond. Insurance requirements are comprehensive, including $2 million in comprehensive general liability insurance, workers' compensation, auto liability, and contractors pollution liability insurance. The project includes provisions for the Build America, Buy America Act (BABAA), requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. Additional requirements include disclosures related to foreign influence and scrutinized companies, with potential for economies of scale as project volume increases.

Opportunity text

The project includes dredging, dewatering, and disposing of approximately 189,972 cubic yards (CY) of organic sediments from the Eau Gallie Dredge Area A1, as described herein and depicted in the Project Drawings. Three alternate bid items are included in the bid that requires the dredging of an additional 42,007 CY, 34,940 CY, and 31,835 CY, respectively. The dredging shall be accomplished by hydraulic dredging methods. The County shall provide a site located on the FIND property (Dredge Material Management Area) DMMA BV-52 along US-1 Highway. The Contractor will have full use of the DMMA without charge but will be responsible for the removal and the ultimate disposition of the dredged material and the restoration of the DMMA at the completion of the project. The Contractor is responsible for developing various plans for review and approval by the Owner and the Owner's Engineer that include the proposed dredging, dewatering and spoil handling, and disposal methods and comply with all applicable Federal, State, and local permits, laws, and regulations and FIND's Lease Agreement with Brevard County. Details of the required plans are found within the Technical Specifications. Conditions and Specifications relevant to this project are provided in detail as part of the Bid Documents.

Files

File Type Posted
Notice_of_Award_1.pdf PDF
Bid_Tabulation_-_Names_Only_1.pdf PDF
Bid_Tabulation_-_Names_Only_1.pdf PDF
Bid_Tabulation_-_Names_Only_1.pdf PDF
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Addendum_3.pdf PDF
Addendum_3.pdf PDF
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Addendum_3.pdf PDF
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Addendum_2.pdf PDF
Addendum_2.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
Attachment_B_-_Drawings.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
C-6_FDEP_Permit_Modification.pdf PDF
C-4_USFWS_Letter_for_Permit.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
D-1_FIND_Long-Range-Term_Dredged_Material_Management_Plan_Update_Jan._2021.pdf PDF
C-5_FDEP_Permit.pdf PDF
C-4_USFWS_Letter_for_Permit.pdf PDF
D-6_Gopher_Tortoise_Initial_Assess._2022.pdf PDF
D-2_DMMA_BV-52_Groundwater_Well_Map.pdf PDF
C-5_FDEP_Permit.pdf PDF
Attachment_B_-_Drawings.pdf PDF
D-5_FWC_Standard_Drawings_&_Tech_Specs.pdf PDF
Attachment_B_-_Drawings.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
Attachment_A_-Technical_Specifications.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
Attachment_A_-Technical_Specifications.pdf PDF
Attachment_F_-_Price_Sheet.xlsx XLSX spreadsheet
C-6_FDEP_Permit_Modification.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
C-2_USACE_Permit.pdf PDF
D-2_DMMA_BV-52_Groundwater_Well_Map.pdf PDF
D-1_FIND_Long-Range-Term_Dredged_Material_Management_Plan_Update_Jan._2021.pdf PDF
C-6_FDEP_Permit_Modification.pdf PDF
D-3_Geotechnical_Report.pdf PDF
D-4_Dredge_Material_Testing_Report.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity