About this file
Summary
This file is a U.S. Army Corps of Engineers (USACE) Section 408 permit modification document for Department of Army Permits SAJ-2018-02904, dated February 11, 2022, issued for the Eau Gallie Muck Removal Project Area A1 in Brevard County, Florida. The permit authorizes hydraulic dredging of approximately 189,972 cubic yards of organic sediments from the Eau Gallie Dredge Area A1 in the Indian River Lagoon, with three optional alternate bid items totaling up to 108,782 additional cubic yards. The contractor must perform hydraulic dredging, dewatering, and disposal of sediments using the Florida Inland Navigation District's Dredge Material Management Area (DMMA) BV-52 located along US Highway 1. The project requires the contractor to develop and obtain approval for detailed dredging, dewatering, spoil handling, and disposal plans that comply with all applicable federal, state, and local permits and regulations. The bid opening is scheduled for February 4, 2025, at 2:00 PM, with a substantial completion timeline of 730 calendar days and an additional 60 days for final completion.
The estimated construction budget is $18,500,000, with the contractor required to provide a 5% bid bond and 100% public construction bond. Insurance requirements include $2 million in comprehensive general liability coverage, workers' compensation, auto liability, and contractors pollution liability insurance. The project is subject to the Build America, Buy America Act (BABAA), requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. The USACE permit establishes standard terms and conditions including limitations of authorization, indemnification requirements, environmental compliance obligations, and rights to inspection and access. The contractor is solely responsible for design sufficiency, construction quality, and remedial action for any deficiencies, as well as restoration of the DMMA upon project completion without expense to the United States.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Bidding Purposes Only
FOR
PALMER.JOHN.
C.1364675034
Digitally signed by
PALMER.JOHN.C.1364675034
Date: 2022.02.15 16:41:50 -05'00'
Submit this form and one set of as-built engineering drawings to the U.S. Army Corps of Engineers, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019. For electronic mail (not to exceed 15 MB). If you have questions regarding this requirement, please contact the Enforcement Branch at 904-232-3697.
Please type
3.
Department of Army Permits SAJ-2018-02904.
Department of Army Permits SAJ-2018-02904.
11 February 2022
EC 1165-2-220
10 Sep 18
APPENDIX K
Standard Terms and Conditions This appendix includes the standard conditions that must be included in all Section 408 approval notifications, except where marked as optional. Use of optional conditions should be based on scope and scale of the approved activity:
LIMITS OF THE AUTHORIZATION
1. This permission only authorizes you, the requester, to undertake the activity described herein under the authority provided in Section 14 of the Rivers and Harbors Act of 1899, as amended (33 USC 408). This permission does not obviate the need to obtain other federal, state, or local authorizations required by law. This permission does not grant any property rights or exclusive privileges, and you must have appropriate real estate instruments in place prior to construction and/or installation.
2. The time limit for completing the work authorized ends on _____ . If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.
3. Without prior written approval of the USACE, you must neither transfer nor assign this permission nor sublet the premises or any part thereof, nor grant any interest, privilege or license whatsoever in connection with this permission. Failure to comply with this condition will constitute noncompliance for which the permission may be revoked immediately by USACE.
4. The requester understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration of the work herein authorized, or if, in the opinion of the Secretary of the Army or an authorized representative, said work will cause unreasonable conditions and/or obstruction of USACE project authorized design, the requester will be required upon due notice from the USACE, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim can be made against the United States on account of any such removal or alteration.
INDEMNIFICATION AND HOLD HARMLESS
5. The United States will in no case be liable for:
a. any damage or injury to the structures or work authorized by this permission that may be caused or result from future operations undertaken by the United States, and no claim or right to compensation will accrue from any damage; or
b. damage claims associated with any future modification, suspension or revocation of this permission.
K-1
6. The United States will not be responsible for damages or injuries which may arise from or be incident to the construction, maintenance, and use of the project requested by you, nor for damages to the property or injuries to your officers, agents, servants, or employees, or others who may be on your premises or project work areas or the federal project(s) rights-of-way. By accepting this permission, you hereby agree to fully defend, indemnify, and hold harmless the United States and USACE from any and all such claims, subject to any limitations in law.
7. Any damage to the water resources development project or other portions of any federal project(s) resulting from your activities must be repaired at your expense.
REEVALUATION OF PERMISSION
8. The determination that the activity authorized by this permission would not impair the usefulness of the federal project and would not be injurious to the public interest was made in reliance on the information you provided.
9. This office, at its sole discretion, may reevaluate its decision to issue this permission at any time circumstances warrant, which may result in a determination that it is appropriate or necessary to modify or revoke this permission. Circumstances that could require a reevaluation include, but are not limited to, the following:
a. you fail to comply with the terms and conditions of this permission;
b. the information provided in support of your application for permission proves to have been inaccurate or incomplete; or
c. significant new information surfaces which this office did not consider in reaching the original decision that the activity would not impair the usefulness of the water resources development project and would not be injurious to the public interest.
CONDUCT OF WORK UNDER THIS PERMISSION
10. You are responsible for implementing any requirements for mitigation, reasonable and prudent alternatives, or other conditions or requirements imposed as a result of environmental compliance.
11. Work/usage allowed under this permission must proceed in a manner that avoids interference with the inspection, operation, and maintenance of the federal project.
12. In the event of any deficiency in the design or construction of the requested activity, you are solely responsible for taking remedial action to correct the deficiency.
13. The right is reserved to the USACE to enter upon the premises at any time and for any purpose necessary or convenient in connection with government purposes, to make inspections, to operate and/or to make any other use of the lands as may be necessary in connection with government purposes, and you will have no claim for damages on account thereof against the United States or any officer, agent or employee thereof.
K-2
14. You must provide copies of pertinent design, construction, and/or usage submittals/documents. USACE may request that survey and photographic documentation of the alteration work and the impacted project area be provided before, during, and after construction and/or installation.
15. You may be required to perform an inspection of the federal project with the USACE, prior to your use of the structure, to document existing conditions.
16. USACE shall not be responsible for the technical sufficiency of the alteration design nor for the construction and/or installation work.
17. (optional, at the discretion of the district) Once permission is granted, you must notify the USACE District at least ( ) days before work/usage is started so that post- permission over sight can be performed by USACE.
18. (optional, at the discretion of the district) You must schedule a final inspection with the USACE within ( ) days after completion of the work/usage.
19. (optional, at the discretion of the district) You must submit a copy of "as-built" drawings within ( ) days of completion of work showing the new work as it relates to identifiable features of the federal project.
K-3