Attachment_F_-_Price_Sheet.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Eau Gallie Muck Removal Project Area A1
- Solicitation number
- B-6-25-24
- Issued by
- Brevard County, Florida
About this file
The document is a Price Sheet for the Eau Gallie Muck Removal Project issued by Brevard County, Florida, detailing a comprehensive hydraulic dredging project for the Indian River Lagoon. The project involves removing approximately 189,972 cubic yards of organic sediments from Dredge Area A1, with three alternate bid options for additional dredging volumes ranging from 31,835 to 42,007 cubic yards. The project will utilize the Florida Inland Navigation District's (FIND) Dredge Material Management Area (DMMA) BV-52 along US-1 Highway, with a substantial completion timeline of 730 calendar days and an additional 60 days for final completion. The bid opening is scheduled for February 4, 2025, at 2:00 PM, following a non-mandatory pre-bid meeting held on December 12, 2024.
The price sheet includes detailed line items for mobilization, site preparation, environmental protection, dredging, surveying, effluent treatment, and material disposal, with all estimated costs currently showing as zero. The estimated construction budget is $18,500,000, requiring a 5% bid bond and 100% public construction bond. Contractors must provide comprehensive insurance, including $2 million in general liability, workers' compensation, and pollution liability coverage. The project incorporates Build America, Buy America Act (BABAA) requirements mandating that all materials be produced in the United States. Currently, Waterfront Property Services, LLC DBA Gator Dredging from Clearwater, FL appears to be the sole vendor in the bid tabulation. The contractor will be responsible for developing and obtaining approval for detailed dredging, dewatering, spoil handling, and disposal plans that comply with all federal, state, and local permits and regulations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-6-25-24 Eau Gallie Muck Removal Project Price Sheet | |||||
| Lump Sum Fixed Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Lump Sum Total |
| General Conditions | |||||
| 01.01 | Mobilization/Demobilization - DMMA | 1 | LS | $ - 0 | |
| 01.02 | Mobilization/Demobilization - In Water | 1 | LS | $ - 0 | |
| 01.03 | Pre and Post Construction Videos | 1 | LS | $ - 0 | |
| Dewatering Facility / Site | |||||
| 02.01 | DMMA - Site Preparation | 1 | LS | $ - 0 | |
| 02.02 | Environmental Protection – DMMA | 1 | LS | $ - 0 | |
| 02.03 | DMMA Restoration | 1 | LS | $ - 0 | |
| 02.04 | DMMA – Perimeter Ditch Restoration | 1 | LS | $ - 0 |
SUB TOTAL LUMP SUM FIXED COSTS - BASE BID: $ - 0
| Estimated Measured Quantity Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredge Material Handling | |||||
| 03.01 | DMMA Management - Dewater, Material Transport, & Disposal | 182,972 | CY | $ - 0 | |
| 03.02 | DMMA - Untreated Raw Water Testing | 50 | EA | $ - 0 | |
| 03.03 | Vacant Gopher Tortoise Burrow Grouting | 5 | EA | $ - 0 | |
| 03.04 | Standby Time - Dredge | 300 | Hourly | $ - 0 | |
| 03.05 | Standby Time – Dewatering | 300 | Hourly | $ - 0 |
SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID: $ - 0
| Estimated Measured Quantity Costs - Pay Section X - Shallow Face - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| X.01 | Muck Dredging | 104,412 | CY | $ - 0 | |
| X.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| X.03 | Environmental Protection | 1 | LS | $ - 0 | |
| A.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| A.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| A.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| A.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION X: $ - 0
| Estimated Measured Quantity Costs - Pay Section Y - Deep Face East - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Y.01 | Muck Dredging | 25,174 | CY | $ - 0 | |
| Y.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Y.03 | Environmental Protection | 1 | LS | $ - 0 | |
| B.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| B.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| B.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| B.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Y: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.00 | Muck Dredging | 53,386 | CY | $ - 0 | |
| Z.02.00 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.03.00 | Environmental Protection | 1 | LS | $ - 0 | |
| C.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| C.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| C.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| C.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 1 Pay Section Z - Deep Face West 16.5ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.01 | Muck Dredging | 42,007 | CY | $ - 0 | |
| Z.02.01 | DMMA Management - Dewater, Material Transport, & Disposal | 42,007 | CY | $ - 0 | |
| Z.03.01 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.01 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 1: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 2 Pay Section Z - Deep Face West 18ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.02 | Muck Dredging | 34,940 | CY | $ - 0 | |
| Z.02.02 | DMMA Management - Dewater, Material Transport, & Disposal | 34,940 | CY | $ - 0 | |
| Z.03.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.02 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 2: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 3 Pay Section Z - Deep Face West 21ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.03 | Muck Dredging | 31,835 | CY | $ - 0 | |
| Z.02.03 | DMMA Management - Dewater, Material Transport, & Disposal | 31,835 | CY | $ - 0 | |
| Z.03.03 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.03 | Environmental Protection | 1 | LS | $ - 0 | |
| D.05 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| D.06 | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.07 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.08 | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 3: $ - 0
| Summary of Costs | ||
| TOTAL LUMP SUM FIXED COSTS - BASE BID: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - BASE BID: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION X: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION Y: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION Z: | $ - 0 | |
| Subtotal | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 1 Pay Section Z 16.5ft | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 2 Pay Section Z 18ft | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 3 Pay Section Z 21ft | $ - 0 | |
| BID ALT ESTIMATE: | $ - 0 | |
| TOTAL ESTIMATE | $ - 0 | |
| Contingency (15%) | ERROR:#REF! | |
| TOTAL ESTIMATE | ERROR:#REF! |
ACH PAYMENTS
tc={68EDA1A9-0B41-4CCD-8EB6-60CB54FCC44D}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.
Does your company accept ACH Payment Method? _____Yes / _____ No
| PROMPT PAYMENT DISCOUNT |
| Brevard County shall remit payment in accordance with the Florida Prompt Payment Act, Florida Statutes section 218.70. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last. |
* If Prompt Payment Discount is offered, please state discount and terms:
| ADDENDUM ACKNOWLEDGMENT |
| Contractor acknowledges receipt of amendments by indicating amendment number and date of issue. |
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications and pricing for Bid #/Bid Title.
| COMPANY NAME_____________________________________________________________ |
| ADDRESS___________________________________________________________________ |
| AUTHORIZED SIGNATURE_______________________________________________________ |
| PRINTED SIGNATURE_________________________________DATE_____________________ |
| TELEPHONE #__________________________________FAX #__________________________ |
| EMAIL______________________________________________________________________ |
File details come from the government source that posted it. Updated .