The document is a Price Sheet for the Eau Gallie Muck Removal Project, involving Brevard County, Florida, and the Florida Inland Navigation District (FIND). The project encompasses hydraulic dredging of approximately 189,972 cubic yards of organic sediments from the Eau Gallie Dredge Area A1, with three alternate bid items for additional dredging volumes of 42,007 CY, 34,940 CY, and 31,835 CY. The contractor will utilize a Dredge Material Management Area (DMMA) BV-52 provided by the County along US-1 Highway, and will be responsible for dredging, dewatering, material disposal, and DMMA restoration, while complying with all applicable federal, state, and local permits and regulations.
The price sheet presents a comprehensive breakdown of lump sum and estimated measured quantity costs, categorized into base bid and alternate bid sections. While no specific unit prices are filled in, the document outlines cost categories including mobilization, site preparation, environmental protection, dredge material handling, survey work, and effluent treatment. The pricing structure includes provisions for standby time, gopher tortoise burrow grouting, and various dredging activities across different project sections. The bid allows for multiple pricing scenarios, with a summary of total bid options ranging from base bid only to base bid plus all three alternate bids, and includes a contingency line item. The document also includes standard governmental procurement elements such as prompt payment discount opportunities and addendum acknowledgment sections.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-6-25-24 Eau Gallie Muck Removal Project Price Sheet | |||||
| Lump Sum Fixed Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Lump Sum Total |
| General Conditions | |||||
| 01.01 | Mobilization/Demobilization - DMMA | 1 | LS | $ - 0 | |
| 01.02 | Mobilization/Demobilization - In Water | 1 | LS | $ - 0 | |
| 01.03 | Pre and Post Construction Videos | 1 | LS | $ - 0 | |
| Dewatering Facility / Site | |||||
| 02.01 | DMMA - Site Preparation | 1 | LS | $ - 0 | |
| 02.02 | Environmental Protection – DMMA | 1 | LS | $ - 0 | |
| 02.03 | DMMA Restoration | 1 | LS | $ - 0 | |
| 02.04 | DMMA – Perimeter Ditch Restoration | 1 | LS | $ - 0 | |
| SUB TOTAL LUMP SUM FIXED COSTS - BASE BID: | $ - 0 | ||||
| Estimated Misc. Measured Quantity Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredge Material Handling | |||||
| 03.01 | DMMA Management - Dewater, Material Transport, & Disposal | 182,972 | CY | $ - 0 | |
| 03.02 | DMMA - Untreated Raw Water Testing | 50 | EA | $ - 0 | |
| 03.03 | Vacant Gopher Tortoise Burrow Grouting | 5 | EA | $ - 0 | |
| 03.04 | Standby Time - Dredge | 300 | Hourly | $ - 0 | |
| 03.05 | Standby Time – Dewatering | 300 | Hourly | $ - 0 | |
| SUB TOTAL MISC. ESTIMATED MEASURED QUANTITY COSTS - BASE BID: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section X - Shallow Face - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| X.01 | Muck Dredging | 104,412 | CY | $ - 0 | |
| X.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| X.03 | Environmental Protection | 1 | LS | $ - 0 | |
| A.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| A.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| A.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| A.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION X: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section Y - Deep Face East - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Y.01 | Muck Dredging | 25,174 | CY | $ - 0 | |
| Y.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Y.03 | Environmental Protection | 1 | LS | $ - 0 | |
| B.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| B.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| B.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| B.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION Y: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West - Base Bid to 15ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.00 | Muck Dredging | 53,386 | CY | $ - 0 | |
| Z.02.00 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.03.00 | Environmental Protection | 1 | LS | $ - 0 | |
| C.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| C.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| C.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| C.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION Z: | $ - 0 |
SUB TOTAL BASE BID: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 1 15ft to 16.5ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.01 | Muck Dredging | 42,007 | CY | $ - 0 | |
| Z.02.01 | DMMA Management - Dewater, Material Transport, & Disposal | 42,007 | CY | $ - 0 | |
| Z.03.01 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.01 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 1: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 2 16.5ft to 18ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.02 | Muck Dredging | 34,940 | CY | $ - 0 | |
| Z.02.02 | DMMA Management - Dewater, Material Transport, & Disposal | 34,940 | CY | $ - 0 | |
| Z.03.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.02 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 2: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 3 18ft to 21ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.03 | Muck Dredging | 31,835 | CY | $ - 0 | |
| Z.02.03 | DMMA Management - Dewater, Material Transport, & Disposal | 31,835 | CY | $ - 0 | |
| Z.03.03 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.03 | Environmental Protection | 1 | LS | $ - 0 | |
| D.05 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| D.06 | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.07 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.08 | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 3: $ - 0
SUMMARY OF BID TOTALS
TOTAL BASE BID ONLY : $ - 0
TOTAL BASE BID + ALT BID 1: $ - 0
TOTAL BASE BID + ALT BID 1 + ALT BID 2: $ - 0
| TOTAL BASE BID + ALT BID 1 + ALT BID 2 + ALT BID 3: | $ - 0 |
| Contingency (15%) | ERROR:#REF! |
| TOTAL ESTIMATE | ERROR:#REF! |
ACH PAYMENTS
tc={68EDA1A9-0B41-4CCD-8EB6-60CB54FCC44D}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.
Does your company accept ACH Payment Method? _____Yes / _____ No
| PROMPT PAYMENT DISCOUNT |
| Brevard County shall remit payment in accordance with the Florida Prompt Payment Act, Florida Statutes section 218.70. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last. |
* If Prompt Payment Discount is offered, please state discount and terms:
| ADDENDUM ACKNOWLEDGMENT |
| Contractor acknowledges receipt of amendments by indicating amendment number and date of issue. |
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications and pricing for Bid #/Bid Title.
| COMPANY NAME_____________________________________________________________ |
| ADDRESS___________________________________________________________________ |
| AUTHORIZED SIGNATURE_______________________________________________________ |
| PRINTED SIGNATURE_________________________________DATE_____________________ |
| TELEPHONE #__________________________________FAX #__________________________ |
| EMAIL______________________________________________________________________ |
File details come from the government source that posted it. Updated .