Eau Gallie Muck Removal Project Price Sheet Summary
This is a revised price sheet for Brevard County's Eau Gallie Muck Removal Project Area A1, a hydraulic dredging initiative in the Indian River Lagoon managed by the Florida Inland Navigation District (FIND). The project involves the removal and disposal of approximately 189,972 cubic yards of organic sediments from the dredge area, with three optional alternate bid items that could add up to 108,782 additional cubic yards. The work includes mobilization/demobilization, environmental protection, dewatering facility operations, muck dredging across three pay sections (Shallow Face, Deep Face East, and Deep Face West), survey services, and effluent treatment for nitrogen and phosphorus. The bid opening was scheduled for February 4, 2025, at 2:00 PM, with a non-mandatory pre-bid meeting held on December 12, 2024. The project timeline extends 730 calendar days for substantial completion, with an additional 60 days for final completion.
The price sheet is structured as a lump sum fixed cost bid with estimated measured quantity costs, requesting unit pricing for dredging (measured in cubic yards), hourly rates for standby time, and lump sum pricing for specialized services such as survey work and environmental protection. The contractor is responsible for dewatering, material transport, disposal at the DMMA BV-52 site, and site restoration, with all costs to be submitted on this standardized form. The estimated construction budget is $18,500,000, with contractors required to submit a 5% bid bond and 100% public construction bond. Insurance requirements include $2 million in comprehensive general liability, workers' compensation, auto liability, and contractors pollution liability coverage. The project mandates compliance with the Build America, Buy America Act, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. Award will be based on the lowest responsive total bid amount including base and alternate pay sections.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-6-25-24 Eau Gallie Muck Removal Project Price Sheet | |||||
| Lump Sum Fixed Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Lump Sum Total |
| General Conditions | |||||
| 01.01 | Mobilization/Demobilization - DMMA | 1 | LS | $ - 0 | |
| 01.02 | Mobilization/Demobilization - In Water | 1 | LS | $ - 0 | |
| 01.03 | Pre and Post Construction Videos | 1 | LS | $ - 0 | |
| Dewatering Facility / Site | |||||
| 02.01 | DMMA - Site Preparation | 1 | LS | $ - 0 | |
| 02.02 | Environmental Protection – DMMA | 1 | LS | $ - 0 | |
| 02.03 | DMMA Restoration | 1 | LS | $ - 0 | |
| 02.04 | DMMA – Perimeter Ditch Restoration | 1 | LS | $ - 0 | |
| SUB TOTAL LUMP SUM FIXED COSTS - BASE BID: | $ - 0 | ||||
| Estimated Misc. Measured Quantity Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredge Material Handling | |||||
| 03.01 | DMMA Management - Dewater, Material Transport, & Disposal | 182,972 | CY | $ - 0 | |
| 03.02 | DMMA - Untreated Raw Water Testing | 50 | EA | $ - 0 | |
| 03.03 | Vacant Gopher Tortoise Burrow Grouting | 5 | EA | $ - 0 | |
| 03.04 | Standby Time - Dredge | 300 | Hourly | $ - 0 | |
| 03.05 | Standby Time – Dewatering | 300 | Hourly | $ - 0 | |
| SUB TOTAL MISC. ESTIMATED MEASURED QUANTITY COSTS - BASE BID: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section X - Shallow Face - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| X.01 | Muck Dredging | 104,412 | CY | $ - 0 | |
| X.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| X.03 | Environmental Protection | 1 | LS | $ - 0 | |
| A.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| A.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| A.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| A.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION X: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section Y - Deep Face East - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Y.01 | Muck Dredging | 25,174 | CY | $ - 0 | |
| Y.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Y.03 | Environmental Protection | 1 | LS | $ - 0 | |
| B.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| B.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| B.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| B.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION Y: | $ - 0 | ||||
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West - Base Bid to 15ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.00 | Muck Dredging | 53,386 | CY | $ - 0 | |
| Z.02.00 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.03.00 | Environmental Protection | 1 | LS | $ - 0 | |
| C.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| C.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| C.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| C.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
| SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID PAY SECTION Z: | $ - 0 |
SUB TOTAL BASE BID: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 1 15ft to 16.5ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.01 | Muck Dredging | 42,007 | CY | $ - 0 | |
| Z.02.01 | DMMA Management - Dewater, Material Transport, & Disposal | 42,007 | CY | $ - 0 | |
| Z.03.01 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.01 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 1: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 2 16.5ft to 18ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.02 | Muck Dredging | 34,940 | CY | $ - 0 | |
| Z.02.02 | DMMA Management - Dewater, Material Transport, & Disposal | 34,940 | CY | $ - 0 | |
| Z.03.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.02 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 2: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West Alt Bid 3 18ft to 21ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.03 | Muck Dredging | 31,835 | CY | $ - 0 | |
| Z.02.03 | DMMA Management - Dewater, Material Transport, & Disposal | 31,835 | CY | $ - 0 | |
| Z.03.03 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.03 | Environmental Protection | 1 | LS | $ - 0 | |
| D.05 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| D.06 | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.07 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.08 | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 3: $ - 0
SUMMARY OF BID TOTALS
TOTAL BASE BID ONLY : $ - 0
TOTAL BASE BID + ALT BID 1: $ - 0
TOTAL BASE BID + ALT BID 1 + ALT BID 2: $ - 0
| TOTAL BASE BID + ALT BID 1 + ALT BID 2 + ALT BID 3: | $ - 0 |
| Contingency (15%) | ERROR:#REF! |
| TOTAL ESTIMATE | ERROR:#REF! |
ACH PAYMENTS
tc={68EDA1A9-0B41-4CCD-8EB6-60CB54FCC44D}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.
Does your company accept ACH Payment Method? _____Yes / _____ No
| PROMPT PAYMENT DISCOUNT |
| Brevard County shall remit payment in accordance with the Florida Prompt Payment Act, Florida Statutes section 218.70. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last. |
* If Prompt Payment Discount is offered, please state discount and terms:
| ADDENDUM ACKNOWLEDGMENT |
| Contractor acknowledges receipt of amendments by indicating amendment number and date of issue. |
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications and pricing for Bid #/Bid Title.
| COMPANY NAME_____________________________________________________________ |
| ADDRESS___________________________________________________________________ |
| AUTHORIZED SIGNATURE_______________________________________________________ |
| PRINTED SIGNATURE_________________________________DATE_____________________ |
| TELEPHONE #__________________________________FAX #__________________________ |
| EMAIL______________________________________________________________________ |
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.