This is an Addendum to a competitive bid solicitation issued by Brevard County, Florida (Purchasing Services division) for the Eau Gallie Muck Removal Project Area A1. Addendum 1 modifies critical deadlines for the procurement: the bid question submission deadline has been changed to January 7, 2025, at 5:00 PM, and the bid opening date and time has been moved to January 21, 2025, at 10:00 AM. The underlying project involves hydraulic dredging and removal of approximately 189,972 cubic yards of organic sediments from the Eau Gallie Dredge Area A1 in the Indian River Lagoon, with three alternate bid items potentially adding up to 108,782 additional cubic yards. The contractor will be responsible for dredging, dewatering, and disposing of materials at the Florida Inland Navigation District's Dredge Material Management Area (DMMA) BV-52, with a substantial completion timeline of 730 calendar days plus 60 days for final completion. All prospective bidders are required to acknowledge receipt of this addendum with their bid submission. All other original terms and conditions of the bid package remain unchanged.

The addendum does not address pricing, evaluation criteria, bonding requirements, insurance specifications, or other substantive bid requirements, as these remain governed by the original bid documents. Bidders should note that the revised deadlines supersede the previously announced schedule, and timely acknowledgment of this addendum is mandatory for bid acceptance.

View the file

Other files

File Type Posted
Bid_Tabulation_-_Names_Only_1.pdf PDF
Bid_Tabulation_-_Names_Only_1.pdf PDF
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Addendum_3.pdf PDF
Addendum_3.pdf PDF
Addendum_3.pdf PDF
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Attachment_F_-_REVISED_Price_Sheet_1.xlsx XLSX spreadsheet
Addendum_2.pdf PDF
Addendum_2.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
Attachment_E_-_DRAFT_CONTRACTOR_CONTRACT.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
B-6-25-24_INV_&_SPECS_1.pdf PDF
Attachment_B_-_Drawings.pdf PDF
C-6_FDEP_Permit_Modification.pdf PDF
D-1_FIND_Long-Range-Term_Dredged_Material_Management_Plan_Update_Jan._2021.pdf PDF
D-6_Gopher_Tortoise_Initial_Assess._2022.pdf PDF
Attachment_B_-_Drawings.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
Attachment_A_-Technical_Specifications.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
D-1_FIND_Long-Range-Term_Dredged_Material_Management_Plan_Update_Jan._2021.pdf PDF
D-4_Dredge_Material_Testing_Report.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
C-4_USFWS_Letter_for_Permit.pdf PDF
C-5_FDEP_Permit.pdf PDF
D-2_DMMA_BV-52_Groundwater_Well_Map.pdf PDF
D-5_FWC_Standard_Drawings_&_Tech_Specs.pdf PDF
Attachment_A_-Technical_Specifications.pdf PDF
Attachment_F_-_Price_Sheet.xlsx XLSX spreadsheet
C-2_USACE_Permit.pdf PDF
C-6_FDEP_Permit_Modification.pdf PDF
D-1_FIND_Long-Range-Term_Dredged_Material_Management_Plan_Update_Jan._2021.pdf PDF
D-3_Geotechnical_Report.pdf PDF
D-5_FWC_Standard_Drawings_&_Tech_Specs.pdf PDF
D-7_Eau_Gallie_Utility_Crossing_Summary_Report.pdf PDF
Attachment_F_-_Price_Sheet.xlsx XLSX spreadsheet
C-5_FDEP_Permit.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
C-1_FIND_Lease_Agreement.pdf PDF
C-4_USFWS_Letter_for_Permit.pdf PDF
C-5_FDEP_Permit.pdf PDF
Attachment_B_-_Drawings.pdf PDF
C-3_USACE_Permit_Modification.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

Eau Gallie Muck Removal B-6-25-24

December 6, 2024

ADDENDUM 1

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 1 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.

Please note that the bid opening date and time HAS BEEN CHANGED to January 21, 2025 @ 10:00

AM.

Please note that the bid question date and time HAS BEEN CHANGED to January 7, 2025 @ 5:00

PM.

All other terms and conditions remain unchanged.

Sincerely, Mary Bowers Purchasing Manager

END OF ADDENDUM 1

File details come from the government source that posted it. Updated .