Attachment_B_-_Drawings.pdf
PDF 7 MB Posted
- Attached to
- Eau Gallie Muck Removal Project Area A1
- Solicitation number
- B-6-25-24
- Issued by
- Brevard County, Florida
About this file
This is a set of construction drawings for the Eau Gallie Area 1A Muck Removal Project in Brevard County, Florida, prepared by AtkinsRealis and Morgan & Eklund, Inc. The drawings depict a hydraulic dredging project designed to remove approximately 182,972 cubic yards of muck from the Eau Gallie River area in Melbourne, Florida, with three alternate bid items offering additional dredging quantities of 42,007 cubic yards, 34,940 cubic yards, and 31,835 cubic yards respectively. The dredge template is divided into three pay sections (X, Y, and Z), with design elevations varying from -5 to -21 feet NAVD88, and includes a pipeline corridor extending approximately 7 miles to the Florida Inland Navigation District's Dredge Material Management Area (DMMA) BV-52. The project involves dredging by hydraulic suction means with active dewatering at the DMMA facility, requiring the contractor to maintain strict compliance with manatee, sea turtle, and smalltooth sawfish protection regulations, as well as erosion and turbidity control measures. Construction cross-sections, pay section boundaries, pipeline routing details, and environmental control plans are provided across multiple sheets, with all vertical coordinates referenced to NAVD88 and horizontal coordinates to the Florida State Plane Coordinate System, East Zone, NAD83.
The drawings establish comprehensive construction requirements and site conditions for contractor implementation, including mandatory turbidity barriers, silt fence installation, navigation obstruction management, and pre-final inspection protocols to be completed within the project completion period. The contractor bears sole responsibility for all construction means, methods, quality assurance/quality control procedures, equipment ingress/egress, utility locating, and environmental compliance, with zero tolerance for dredging outside designated limits or misplacement of dredged materials. Specific provisions address site restoration at the dewatering facility, removal and reinstallation of Florida Wildlife Conservation Commission markers, protection of protected natural resources including seagrass beds, and 50-foot construction tolerance above design templates. The project includes detailed specifications for the dewatering site at DMMA BV-52, including capacity verification through preconstruction survey, stormwater perimeter ditch restoration, and coordination with existing infrastructure such as steel casing pipes and weir systems, with final payment contingent upon achievement of design depths verified through post-dredge survey conducted at the contractor's expense.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MORGAN & EKLUND, INC.
1612 NW 2ND AVENUE SUITE 3
BOCA RATON, FL 33432
(954) 421-6882
LICENSE #: LB4298
EAU GALLIE AREA A1 MUCK REMOVAL PROJECT
BID DRAWINGS
BREVARD COUNTY, FL
OCTOBER 2024
SURVEYOR
SHEET NUMBERS SHEET TITLE
C-000 COVER SHEET
G-100 TO G-102 GENERAL NOTES
G-103 PROJECT OVERVIEW - LAYOUT
G-104 PROJECT OVERVIEW - KEY MAP
C-100 DREDGE TEMPLATE WITH EXISTING CONDITIONS
C-101 TO C-102 DREDGE TEMPLATE PAY SECTIONS
C-103 CROSS SECTIONS - TYPICAL AND SLOUGHING
C-104 TO C-108 CROSS SECTIONS - DREDGE DESIGN
C-109 DMMA BV-52 EXISTING CONDITIONS
C-110 CROSS SECTIONS - DMMA
C-111 RETURN DISCHARGE - DMMA
C-112 TO C-113 PIPELINE CORRIDOR
C-114 PIPELINE CROSSING AT 5TH AVE. BRIDGE
C-115 STORMWATER PERMIETER DITCH RESTORATION
C-116 ENVIRONMENTAL AND EROSION CONTROL PLAN
BREVARD COUNTY
2725 JUDGE FRAN JAMIESON WAY
SUITE A
MELBOURNE, FL 32940
(321) 633-2016
ENGINEER OF RECORD: JUSTIN A. BARTUSEK P.E.
PROFESSIONAL ENGINEERING NO.: FL 88808 P.E.
NOTICE
THE INFORMATION IN THIS DOCUMENT WAS PREPARED BY ATKINSRÉALIS. WHILE ATKINSRÉALIS HAS
TAKEN ALL REASONABLE STEPS TO ASSURE THE ACCURACY OF THE INFORMATION CONTAINED IN
THIS DOCUMENT, IT CANNOT GUARANTEE THAT CHANGES OR ALTERATIONS TO THIS DOCUMENT
WILL NOT BE MADE BY PERSONS OTHER THAN ATKINSRÉALIS PERSONNEL AFTER THE DOCUMENT
LEAVES THE POSSESSION OF ATKINSRÉALIS. CHANGES OR ALTERATIONS MAY BE SAFETY RELATED
AND RESULT IN DAMAGE TO PROPERTY, PERSONAL INJURY OR DEATH. IF VERIFICATION OF THE
INFORMATION CONTAINED IN THIS DOCUMENT IS NEEDED, CONTACT SHOULD BE MADE DIRECTLY
WITH ATKINSRÉALIS.
THIS DOCUMENT MUST BE COMPARED TO THE ORIGINAL HARD COPY IN ORDER TO INSURE THE
ACCURACY OF THE INFORMATION CONTAINED THEREIN AND TO FURTHER INSURE THAT NO CHANGES, ALTERATIONS OR MODIFICATIONS HAVE BEEN MADE TO THE DOCUMENT. NO RELIANCE SHOULD EVER
BE MADE ON A DOCUMENT TRANSMITTED OR REVIEWED BY COMPUTER OR OTHER ELECTRONIC
MEANS UNLESS IT IS FIRST COMPARED TO THE ORIGINAL. ATKINSRÉALIS MAKES NO WARRANTIES, EXPRESSED OR IMPLIED, CONCERNING THE ACCURACY OF THE INFORMATION CONTAINED IN ANY
DOCUMENT TRANSMITTED OR REVIEWED BY COMPUTER OR OTHER ELECTRONIC MEANS.
PROJECT NUMBER: 100087645
NOT VALID FOR CONSTRUCTION
UNLESS SIGNED IN THIS BLOCK
2671 W. EAU GALLIE BLVD SUITE 104,
MELBOURNE, FL 32935
TEL: (321) 775-6642
ATKINSRÉALIS
MARIE YARBROUGH, PE
LICENSE #: FL 70748
JUSTIN BARTUSEK, PE
LICENSE #: FL 88808
ENGINEER
1" :3000'
M
E
L
B
O
U
R
N
E
C
A
U
S
E
W
A
Y
C
R
A
N
E
C
R
E
E
K
ATLANTIC OCEAN
ENGINEER OF RECORD: S. MARIE YARBROUGH P.E.
PROFESSIONAL ENGINEERING NO.: FL 70748 P.E.
E
A
U
G
L
L
I
V
E
R
INDIAN RIVER
E
L
L
I
E
C
A
U
S
E
W
A
Y
H
W
Y
A
H
A
M
ELBOURNE A
IR
PORT
SHEET INDEX
PROJECT LIMITS
D
AT
E D
ES
C
R
IP
TI
O
N
D ra w in g N am e:
C :\U se rs
\D
AY
M
\A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
\G -1
G
EN
ER
AL
N
O
TE
S.
dw g
O ct
2,
- 1 0:
am
EA
U
G
AL
LI
E
AR
EA
A
M U
C K
R
EM
O
VA
L
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
G
EN
ER
AL
N O
TE
S
100087645
RCB
JRK
KMG
SMY
G-100
S. MARIE YARBROUGH
FL 70748
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
12345678 N
O
TI
C E:
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
D
O C
U M
EN
T
W
AS
P R
EP
AR
ED
B
Y
AT
KI
N
SR
ÉA
LI
S, IN
C
. W H
IL
E
AT
KI
N
SR
ÉA
LI
S H
AS
T
AK
EN
A
LL
R
EA
SO
N
AB
LE
S
TE
PS
T
O A
SS
U
R E
TH
E
AC
C
U R
AC
Y
O F
TH
E
I N
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
I N
T H
IS
D
O C
U M
EN
T, I T
C
AN
N O
T G
U
AR
AN
TE
E
TH
AT
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S
TO
T H
IS
D
O C
U M
EN
T
W
IL
L N
O T
BE
M
AD
E
BY
P
ER
SO
N S
O
TH
ER
AN
KI
N
SR
ÉA
LI
S
PE
R
SO
N
EL
AF
TE
D
O C
U M
EN
T
LE
AV
ES
PO
SS
ES
SI
O N
O F
AT
KI
N
SR
ÉA
LI
S.
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S M
AY
B
E
SA
FE
TY
R
EL
AT
ED
LT
IN
AM
AG
TO
PR
PE
R
TY
PE
R
SO
AL
JU
R Y
EA
IF
VE
R
IF
IC
AT
IO
N
O F
TH
E
IN
FO
R M
AT
IO
N C
O N
TA
IN
ED
I
N T
H
IS
D O
C U
M
EN
T
IS
N
EE
D
ED
C
O N
TA
C
T
SH
O U
LD
B
E M
AD
E
D
IR
EC
TL
Y W
IT
H
A
TK
IN
SR
ÉA
LI
S.
T
H
IS
D O
C U
M
EN
T M
U
ST
B E
C O
M
PA
ED
O
R
IG
H
AR
PY
W
IT
TI
FI
AI
SE
IF
AP
PL
IC
AB
LE
, I
N O
R D
ER
T
O
IN
SU
R
E
TH
E
AC
C U
R
AC
Y O
F
TH
E
IN
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
TH
ER
EI
FU
SU
R
E
AN
G
ES
AL
TE
R
AT
IO
N S
O R
M O
D
IF
IC
AT
IO
N
S H
AV
E
BE
EN
M
AD
E
TO
T H
E D
O C
U M
EN
T.
N O
R
EL
IA
N
C E
SH
O
U
LD
E
VE
R B
E M
AD
E
O N
A D
O C
U M
EN
TA
TI
O
N T
R
AN
SM
IT
TE
D
O R
R
EV
IE
W
ED
B
Y C
O M
PU
TE
R O
R O
TH
ER
EL
EC
TR
O
N
IC
M
EA
N S
U N
LE
SS
IT
IS
F
IR
ST
C
O M
PA
R
ED
T
O T
H E
O R
IG
IN
AL
. A
TK
IN
SR
ÉA
LI
S
M
AK
ES
N
O W
AR
R
AN
TI
ES
, E
XP
R
ES
S
O R
IM
PL
IE
D
, C O
N C
ER
N
IN
G
T H
E A
C C
U R
AC
Y
O F
TH
E
IN
FO
R M
AT
IO
N
TA
D
O C
U M
EN
T
TR
AN
SM
IT
EV
IE
BY
O M
PU
TE
R O
R O
TH
ER
E
LE
C
TR
O N
IC
M
EA
N
S.
DATE:
O R
IG
IN
A L
IS
SU
ED
D
A
TE
NATURAL
RESOURCES
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
GENERAL NOTES:
1. THE PURPOSE OF THIS PROJECT IS TO DREDGE A BASE BID OF APPROXIMATELY 182,972
CUBIC YARDS OF MUCK FROM THE EAU GALLIE AREA 1A DREDGE TEMPLATE. ALL
QUANTITIES ARE APPROXIMATE, AND THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING
ESTIMATED QUANTITIES.
2. AN ALTERNATE BID ITEM #1 FOR THE CONTRACTOR TO DREDGE AN ADDITIONAL 42,007 CY
OF DREDGE MATERIAL FROM PAY SECTION Z TO A DESIGN ELEVATION OF -16.5 FEET
NAVD88 OR MUCK BOTTOM WHICH EVER COMES FIRST WITHIN THE DREDGE AREA
DEPICTED IN THE DRAWINGS. NOTE THAT THIS MATERIAL IS ADDITIONAL TO THE BASE BID
QUANTITY.
3. AN ALTERNATE BID ITEM #2 FOR THE CONTRACTOR TO DREDGE AN ADDITIONAL 34,940 CY
OF DREDGE MATERIAL FROM PAY SECTION Z TO A DESIGN ELEVATION OF -18 FEET NAVD88
OR MUCK BOTTOM WHICH EVER COMES FIRST WITHIN THE DREDGE AREA DEPICTED IN THE
DRAWINGS. NOTE THAT THIS MATERIAL IS ADDITIONAL TO THE BASE BID QUANTITY AND
ALTERNATE BID ITEM #1.
4. AN ALTERNATE BID ITEM #3 FOR THE CONTRACTOR TO DREDGE AN ADDITIONAL 31,835 CY
OF DREDGE MATERIAL FROM PAY SECTION Z TO A DESIGN ELEVATION OF -21 FEET NAVD88
OR MUCK BOTTOM WHICH EVER COMES FIRST WITHIN THE DREDGE AREA DEPICTED IN THE
DRAWINGS. NOTE THAT THIS MATERIAL IS ADDITIONAL TO THE BASE BID QUANTITY AND
ALTERNATE BID ITEM #1 AND ALTERNATE BID ITEM #2.
5. ALL VOLUME QUANTITIES PROVIDED INCLUDE DREDGE TOLERANCE.
6. DREDGING ACTIVITY WILL BE CONDUCTED IN DESIGNATED AREAS ONLY AND IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. NO DREDGING IS PERMITTED
OUTSIDE OF THE LINES AND GRADES DEPICTED IN THE PLANS.
7. CONTRACTOR WILL STRICTLY COMPLY WITH ALL MANATEE, SEA TURTLE, AND SMALLTOOTH
SAWFISH REGULATIONS AND PERMIT CONDITIONS.
8. CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND TURBIDITY CONTROL MEASURES
THROUGHOUT THE PROJECT.
9. BATHYMETRIC DATA (SURVEYS AND MUCK PROBES, MARCH 2017), FOR THE DREDGE AREA
HAVE BEEN PROVIDED BY AMEC INC. SURVEY INFORMATION DEPICTED WITHIN THIS PLAN
SET REPRESENT THE EXISTING CONDITIONS AT THE TIME OF THE SURVEY WITH A VERTICAL
ACCURACY OF +/- 0.3'.
10. BATHYMETRIC DATA (OCTOBER 2020) OF PIPELINE CROSSING HAVE BEEN PROVIDED BY
MORGAN & EKLUND INC.
11. GRID COORDINATES ARE IN FEET AND ARE REFERENCED TO THE FLORIDA STATE PLANE
COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83).
12. ELEVATIONS SHOWN WITHIN THIS PLAN SET ARE IN FEET AND ARE REFERENCED TO
NATIONAL AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
13. AERIAL PHOTOGRAPHS WERE PROVIDED BY BING GEOMAPS; DATED 2020.
CONSTRUCTION NOTES
SCOPE OF WORK:
3. THE WORK CONSISTS OF FURNISHING ALL LABOR, MATERIALS, EQUIPMENT, AND
PERFORMING ALL TASKS NECESSARY FOR THE MUCK REMOVAL DREDGING TO THE LINES
AND DEPTHS DESCRIBED HERE IN THE EAU GALLIE AREA 1A LIMITS IN MELBOURNE,
FLORIDA.
4. DREDGING ACTIVITIES ARE TO BE PERFORMED USING HYDRAULIC SUCTION MEANS. A
DEWATERING FACILITY IS AVAILABLE AT THE FLORIDA INLAND NAVIGATION DISTRICT (FIND)
DMMA BV-52 LOCATED APPROXIMATELY 7 MILES SOUTH OF DREDGE TEMPLATE AREA 1A.
IT IS ANTICIPATED THAT ACTIVE DEWATERING METHODS WILL BE REQUIRED.
5. THE DREDGE TEMPLATE IS DELINEATED INTO THREE (3) PAY SECTIONS: PAY SECTION X
SHALLOW FACE, PAY SECTION Y DEEP FACE WEST, AND PAY SECTION Z DEEP FACE EAST.
THE CONTRACTOR SHALL DREDGE EACH PAY SECTION TO THE LINES AND GRADES DEPICTED
IN THE DRAWINGS. CONTRACTOR SHALL NOTE THAT PAY SECTION Y SHALL BE DREDGED TO
THE SAND/MUCK INTERFACE, REMOVING ALL MUCK FOUND BETWEEN THE TOP OF MUCK
(TOM) AND BOTTOM OF MUCK (BOM) SURVEYS, (IE CONTOUR DREDGING). ADDITIONALLY,
PAY SECTION Z SHALL BE TO THE FOLLOWING - CONTOUR DREDGED OR TO THE BASE BID
DESIGN DEPTH, WHICHEVER COMES FIRST. IF THE COUNTY IS TO AWARD A BID ALTERNATE,
THE CONTRACTOR SHALL DREDGE TO THE BOTTOM OF MUCK SURVEY OR TO THE BID
ALTERNATE DESIGN DEPTH, WHICHEVER COMES FIRST.
6. THE INTENT OF THE PROJECT IS TO REMOVE AS MUCH MUCK MATERIAL AS POSSIBLE,
WITHOUT IMPACTING THE INTEGRITY OF NATIVE SUBSTRATES. A CONSTRUCTION
TOLERANCE OF 0.5 FEET ABOVE DREDGE TEMPLATE IS ALLOWED FOR ALL AREAS DREDGED.
MORE SPECIFICALLY, THE WORK CONSISTS OF THE FOLLOWING:
1. UNDERGROUND UTILITIES AND IMPROVEMENTS WERE IDENTIFIED WITHIN THE PROJECT
AREA BUT WERE NOT LOCATED AS PART OF THIS SURVEY. IT WILL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE THESE LOCATES AND ANY ADDITIONAL LOCATES PRIOR TO
CONSTRUCTION.
2. THIS WORK MUST BE COMPLETED ACCORDING TO THE PLANS AND SPECIFICATIONS WITHIN
THE TIME SPECIFIED IN THE CONTRACT. CONTRACTOR MUST COMPLETE THE WORK WHILE
MAINTAINING COMPLIANCE WITH THE CONDITIONS OF THE FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION (FDEP) UNITED STATES ARMY CORPS OF ENGINEERS (USACE),
FLORIDA INLAND NAVIGATION DISTRICT (FIND) LEASE, COAST GUARD, AND ALL LOCAL
PERMITS.
3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,
TECHNIQUES, AND PROCEDURES INCLUDING CONSTRUCTION MONITORING, PERMIT
COMPLIANCE, AND THE SEQUENCE OF THE WORK. THE ENGINEER WILL NOT BE
RESPONSIBLE FOR THE RATE OF COMPLETION OR COORDINATION OF THE WORK.
LAYOUT OF THE WORK:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUOUSLY MAINTAINING THE POSITION
OF THE DREDGE OR EXCAVATING EQUIPMENT WITHIN THE PRESCRIBED DREDGING LIMITS.
THE CONTRACTOR SHALL CONTINUOUSLY MONITOR WATER LEVELS AND DEPTH OF
DREDGING TO ENSURE THAT THE DESIGNED DEPTH IS MET. THE CONTRACTOR SHALL HAVE
ADEQUATE PERSONNEL ON SITE WITH ABILITY OF SETTING ACCURATE CONTROL FOR
CONTINUAL DREDGE OPERATIONS.
SITE CONDITIONS:
1. THE WORK IS LOCATED IN THE INDIAN RIVER LAGOON, THEREFORE EXPOSED TO WEATHER
CONDITIONS WHICH AT TIMES MAY INCLUDE STORMS AND ROUGH SEA CONDITIONS
NECESSITATING TEMPORARY SUSPENSION OF MARINE CONSTRUCTION OPERATIONS.
ADDITIONALLY, THE WORK AREA MAY BE SUBJECT TO WAKES GENERATED BY VESSELS. THE
CONTRACTOR IS RESPONSIBLE FOR BEING FAMILIAR WITH THESE CONDITIONS AND TO TAKE
THEM UNDER CONSIDERATION IN THE COST AND SCHEDULING OF THE WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO TAKE PRECAUTIONS TO INSURE THAT PARTIALLY
COMPLETED WORK IS NOT SUBJECT TO DISPLACEMENT OR DAMAGE DUE TO NATURAL SITE
CONDITIONS OR BOAT WAKES. SHOULD ANY SUCH DAMAGE OR DISPLACEMENT OF
PARTIALLY COMPLETED WORK OCCUR, THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING
ANY SUCH DAMAGE OR DISPLACEMENT OF PARTIALLY COMPLETED WORK AT NO
ADDITIONAL COST TO THE COUNTY.
2. A GEOTECHNICAL INVESTIGATION OF THE SUBSURFACE CONDITIONS WITHIN THE DREDGE
TEMPLATE HAS BEEN COMPLETED BY AMEC INC. THE FULL REPORT AND ANALYSIS IS
INCLUDED AS AN APPENDIX IN THE BID DOCUMENTS. THE CONTRACTOR SHALL PERFORM AT
THEIR OWN EXPENSE, ANY ADDITIONAL SUCH INVESTIGATIONS THAT CONTRACTOR DEEMS
NECESSARY TO VERIFY MUCK CHARACTERISTICS AND DREDGE QUANTITIES.
3. INFORMATION AND DATA FURNISHED OR REFERRED TO HEREIN ARE FOR THE
CONTRACTOR'S INFORMATION, HOWEVER, IT IS EXPRESSLY UNDERSTOOD THAT THE
COUNTY AND ENGINEER SHALL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR
CONCLUSION MADE BY THE CONTRACTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE
FAMILIAR WITH LOCAL CONDITIONS THAT MAY IN ANY MANNER AFFECT PERFORMANCE OF
THE WORK.
SITE PREPARATION:
1. THE MUCK REMOVED FROM THE DREDGE AREAS MAY BE STOCKPILED TEMPORARILY ON
THE DEWATERING SITE AND MUST BE TRUCKED OFF SITE AS PER THE TECHNICAL
SPECIFICATIONS. SILT FENCE SHALL BE ERECTED AND MAINTAINED BY THE CONTRACTOR
ALONG THE PERIMETER OF THE SITE PRIOR TO DREDGING TO AVOID THE SPREADING OF
SEDIMENT INTO ANY STORMWATER PERIMETER DITCH, IF NEEDED.
2. UPON COMPLETION AND ACCEPTANCE OF THE DREDGING, THE CONTRACTOR SHALL
RESTORE THE DEWATERING AREAS TO THEIR PRE-CONSTRUCTION SURVEY CONDITION
ACCORDING TO THE CONTRACTOR'S RESTORATION PLAN. PRIOR TO RESTORATION OF THE
DEWATERING AREA, THE CONTRACTOR SHALL MEET WITH THE COUNTY AND THE ENGINEER
ON SITE TO DISCUSS THE SPECIFICS OF THE SITE RESTORATION SUCH AS BUT NOT LIMITED
TO THE RESTORATION OF THE STORMWATER PERIMETER DITCH AT DMMA BV-52. THE
COUNTY RESERVES THE RIGHT TO KEEP THE DEWATERING AREAS FOR USE FOR OTHER
WORK IF DEEMED NECESSARY AT THAT TIME, AND IF SO THAT WORK SHALL BE REMOVED
FROM THE CONTRACTOR'S CONTRACTUAL OBLIGATION WITH THE COUNTY AND A CREDIT
WILL RESULT TO THE COUNTY.
NOTICE TO MARINERS:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE COAST GUARD IN
SUFFICIENT TIME TO ALLOW FOR PUBLICATION OF A NOTICE TO MARINERS. THE LOCAL
COAST GUARD IS:
COMMANDER 7TH COAST GUARD DISTRICT
BRICKELL PLAZA FEDERAL BUILDING
909 S.E. FIRST AVENUE, ROOM 406
MIAMI, FLORIDA 33131-3028
(LNM) TELEPHONE: (305) 415-6750 / (305) 415-6757
2. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE U.S. COAST GUARD FOR ALL BUOYS,
MARKERS, AND OTHER DREDGING AIDS PRIOR TO INSTALLATION. DREDGING AIDS, LIGHTS,
OR TARGETS SHALL NOT BE PLACED OR COLORED IN A MANNER THAT THEY WILL OBSTRUCT
OR BE CONFUSED WITH NAVIGATION AIDS.
ENVIRONMENTAL PROTECTION:
1. CONTRACTOR SHALL EXERCISE DUE CAUTION SO AS NOT TO DAMAGE EXISTING NATIVE
VEGETATION ALONG THE SHORELINE WITHIN AND AROUND THE PROJECT AREA, ACCESS
WAYS, AND STAGING AREAS. ANY NATIVE VEGETATION OR SEAGRASS OUTSIDE OF THE
DREDGE TEMPLATE DAMAGED BY CONTRACTOR DURING THE COURSE OF THE WORK SHALL
BE RESTORED BY CONTRACTOR AT CONTRACTOR'S EXPENSE.
2. IN ORDER TO ENSURE THAT MANATEES ARE NOT ADVERSELY AFFECTED BY THE
CONSTRUCTION ACTIVITIES AS DESCRIBED IN THESE SPECIFICATIONS, THE CONTRACTOR IS
REQUIRED TO STRICTLY ADHERE TO THE STATE DEPARTMENT OF ENVIRONMENTAL
PROTECTION AND THE CORPS OF ENGINEERS PERMIT STANDARD MANATEE CONDITIONS
WHICH IDENTIFY SPECIFIC REQUIREMENTS FOR THE PROTECTION OF MANATEES.
PERMITS:
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY PERMIT (FEDERAL, STATE, AND LOCAL)
REQUIRED TO COMPLETE THE PROJECT AS THEIR OPERATIONS DICTATE, WHICH HAS NOT
BEEN PREVIOUSLY OBTAINED BY THE COUNTY. COPIES OF ALL PREVIOUSLY OBTAINED
PERMITS ARE INCLUDED WITH THE BID DOCUMENTS. IT IS ANTICIPATED THAT A PERMIT
MODIFICATION FOR THE EXISTING FDEP PERMITS WILL BE REQUIRED TO ACCOMMODATE
THE CONTRACTOR'S DEWATERING METHODS, EFFLUENT WATER TREATMENT, AND FINAL
PLACMENT OF MUCK. THE CONTRACTOR SHALL PROVIDE ALL INFORMATION NECESSARY
FOR THESE PERMIT MODIFICATIONS.
GENERAL CONSTRUCTION NOTES:
1. THE CONTRACTOR SHALL MAKE THEIR OWN DETERMINATION OF THE QUANTITIES OF WORK
REQUIRED TO COMPLETE THE CONSTRUCTION SHOWN ON THE PLANS. THE CONTRACTOR
SHALL ALSO MAKE THEIR OWN ASSESSMENT OF THE SITE AND THE WORK REQUIRED PRIOR
TO BIDDING AND ANY DISCREPANCIES, ERRORS OR OMISSIONS, SHALL BE BROUGHT TO THE
ATTENTION OF THE COUNTY REPRESENTATIVE BEFORE THE BID DUE DATE.
2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND
UTILITIES OR OTHER OBJECTS PRIOR TO COMMENCING WORK AT THE SITE. ANY UTILITIES
OR OTHER ITEMS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE
CONTRACTOR AT NO COST TO THE COUNTY.
3. ALL AREAS OR ITEMS THAT ARE DAMAGED OR DISTURBED BY THE CONTRACTOR SHALL BE
RESTORED TO THEIR ORIGINAL OR BETTER CONDITION AT NO COST TO THE COUNTY.
4. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO
CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD OF ANY
CONFLICT BEFORE PERFORMING ANY WORK IN THE AFFECTED AREA.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, WHICH MAY OCCUR AS A RESULT OF THE WORK PERFORMED
BY THE CONTRACTOR AT NO COST TO THE COUNTY.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT,
MONITORING, AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL
AGENCIES.
7. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS
AND/OR LATEST EDITION UNLESS OTHERWISE NOTED.
8. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HORIZONTAL AND VERTICAL
ACCURACY DURING DREDGING. QA/QC PROCEDURES MUST BE SUBMITTED TO AND
APPROVED BY THE COUNTY AND ENGINEER.
9. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE
VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
10. REPAIR AND REPLACEMENT OF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS
WORK SHALL RESTORE THE SUBJECT PROPERTIES TO A CONDITION OF EQUAL TO, OR BETTER
THAN EXISTING CONDITIONS.
E D
ES
C
R
IP
TI
O
N
D ra w in g N am e:
C :\U se rs
\D
AY
M
\A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
\G -1
G
EN
ER
AL
N
O
TE
S.
2,
- 1 0:
am
EA
U
G
AL
LI
E
AR
EA
A
M U
C K
R
EM
O
VA
L
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
G
EN
ER
AL
N O
TE
S
100087645
JRK
JRK
KMG
SMY
G-101
S. MARIE YARBROUGH
FL 70748
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
12345678 N
O
TI
C E:
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
D
O C
U M
EN
T
W
AS
P R
EP
AR
ED
B
Y
AT
KI
N
SR
ÉA
LI
S, IN
C
. W H
IL
E
AT
KI
N
SR
ÉA
LI
S H
AS
T
AK
EN
A
LL
R
EA
SO
N
AB
LE
S
TE
PS
T
O A
SS
U
R E
TH
E
AC
C
U R
AC
Y
O F
TH
E
I N
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
I N
T H
IS
D
O C
U M
EN
T, I T
C
AN
N O
T G
U
AR
AN
TE
E
TH
AT
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S
TO
T H
IS
D
O C
U M
EN
T
W
IL
L N
O T
BE
M
AD
E
BY
P
ER
SO
N S
O
N
SR
ÉA
LI
S
PE
R
SO
N
D
O C
U M
EN
T
LE
PO
SS
ES
SI
O N
O F
AT
KI
N
SR
ÉA
LI
S.
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S M
AY
B
E
SA
FE
TY
R
EL
AT
ED
AG
PE
R
TY
PE
R
SO
R Y
R
IF
IC
AT
IO
N
O F
TH
E
IN
FO
R M
AT
IO
N C
O N
TA
IN
ED
I
N T
H
IS
D O
C U
M
EN
T
IS
N
EE
D
ED
C
O N
TA
C
T
SH
O U
LD
B
E M
AD
E
D
IR
EC
TL
Y W
IT
H
A
TK
IN
SR
ÉA
LI
S.
T
H
IS
D O
C U
M
EN
T M
U
ST
B E
C O
M
PA
O
R
IG
PY
W
TI
IF
AP
PL
IC
AB
LE
, I
N O
R D
ER
T
O
IN
SU
R
E
TH
E
AC
C U
R
AC
Y O
F
TH
E
IN
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
TH
ER
R
E
AN
G
ES
AL
TE
R
AT
IO
N S
O R
M O
D
IF
IC
AT
IO
N
S H
AV
E
BE
EN
M
AD
E
TO
T H
E D
O C
U M
EN
T.
N O
R
EL
IA
N
C E
SH
O
U
LD
E
VE
R B
E M
AD
E
O N
A D
O C
U M
EN
TA
TI
O
N T
R
AN
SM
IT
TE
D
O R
R
EV
IE
W
ED
B
Y C
O M
PU
TE
R O
R O
TH
ER
EL
EC
TR
O
N
IC
M
EA
N S
U N
LE
SS
IT
IS
F
IR
ST
C
O M
PA
R
ED
T
O T
H E
O R
IG
IN
AL
. A
TK
IN
SR
ÉA
LI
S
M
AK
ES
N
O W
AR
R
AN
TI
ES
, E
XP
R
ES
S
O R
IM
PL
IE
D
, C O
N C
ER
N
IN
G
T H
E A
C C
U R
AC
Y
O F
TH
E
IN
FO
R M
AT
N
TA
D
O C
U M
EN
T
TR
AN
SM
IT
IE
O M
PU
TE
R O
R O
TH
ER
E
LE
C
TR
O N
IC
M
EA
N
S.
DATE:
O R
IG
IN
A L
IS
SU
ED
D
A
TE
NATURAL
RESOURCES
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
11. CONSTRUCTION TRAFFIC SHALL NOT IMPEDE THE SAFE AND EFFICIENT USE OF THE
SURROUNDING ROADWAYS. THE CONTRACTOR SHALL FOLLOW FDOT STANDARD INDICES
600 SERIES FOR MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY REMOVAL OF ANY FUGITIVE DUST,
SAND OR DEBRIS WHICH MAY BE CAUSED BY THEIR ACTIONS.
13. ENGINEERS OF RECORD ARE THE ENGINEERS RESPONSIBLE FOR THE DESIGN OF THE
PROJECT
14. ENGINEER OF RECORD IS ALSO THE ENGINEER HIRED TO OBSERVE CONSTRUCTION.
15. OTHER CONTACT INFORMATION WILL BE PROVIDED AS NECESSARY.
16. THE CONTRACTOR SHALL NOT OCCUPY PRIVATE LAND OUTSIDE OF ANY EASEMENTS OR
RIGHTS OF WAY UNLESS A WRITTEN AUTHORIZATION HAS BEEN SIGNED BY THE PROPERTY
OWNER AND PROVIDED TO THE COUNTY. PRIOR TO THE USE OF PRIVATE LANDS, THE
CONTRACTOR SHALL SUBMIT A COPY OF THE AGREEMENT(S)TO THE COUNTY. ALL
AGREEMENTS SHALL INCLUDE LANGUAGE GRANTING THE COUNTY AND ENGINEER
UNRESTRICTED RIGHTS TO ACCESS THE PROPERTY IN ASSOCIATION WITH THE
PERFORMANCE OF THEIR RESPONSIBILITIES CONCERNING THIS PROJECT. IN THE EVENT
THAT THE CONTRACTOR USES PRIVATE PROPERTY FOR ANY PURPOSE WITHOUT FIRST
HAVING THE NECESSARY APPROVALS FROM THE PROPERTY OWNER OR PROVIDED THE
NECESSARY AGREEMENT TO THE COUNTY, THE COUNTY WILL DIRECT THE CONTRACTOR
TO IMMEDIATELY CEASE USING SUCH PROPERTY. PRIOR TO APPLICATION FOR FINAL
PAYMENT, THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE OWNER OF
EACH PIECE OF PRIVATE PROPERTY FOR WHICH AN AGREEMENT FOR USE WAS PROVIDED,
OR FOR WHICH THE COUNTY HAS ISSUED WRITTEN NOTIFICATION TO THE CONTRACTOR,
THAT EACH OWNER IS SATISFIED WITH THE MANNER IN WHICH THE CONTRACTOR HAS
RESTORED THE PROPERTY. FINAL PAYMENT OF OR REDUCTION IN RETAINAGE SHALL NOT
BE PAID UNTIL SUCH DOCUMENTATION IS RECEIVED BY THE COUNTY.
17. UNDER NO CIRCUMSTANCES WILL THE USE OF EXPLOSIVES FOR EXCAVATION BE
PERMITTED.
18. MATERIAL REMOVED FROM BEYOND THE DREDGING LIMITS AS SPECIFIED ON THE
CONTRACT DRAWINGS SHALL BE CONSIDERED EXCESSIVE DREDGING FOR WHICH NO
PAYMENT WILL BE MADE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEDERAL,
STATE, AND LOCAL REGULATORY PERMITS, IMPLICATIONS, VIOLATIONS AND/OR FEES AS A
RESULT OF EXCESSIVE DREDGING.
19. ANY DREDGED MATERIALS DEPOSITED AT LOCATIONS OTHER THAN AS DESIGNATED OR
APPROVED BY THE COUNTY SHALL BE CONSIDERED MISPLACED MATERIAL AND SHALL NOT
BE PAID FOR UNTIL THE CONTRACTOR, AT THEIR EXPENSE, REMOVES AND RE-DEPOSITS
SUCH MISPLACED MATERIAL TO THE APPROVED DISPOSAL SITE. THIS REQUIRED REMOVAL
AND REDEPOSIT OF THE MISPLACED MATERIAL AND ANY NECESSARY DISPOSAL SITE
RESTORATION WORK SHALL NOT BE THE BASIS FOR A TIME EXTENSION OR ADDITIONAL
COMPENSATION UNDER THIS CONTRACT.
20. DEBRIS, SUCH AS STUMPS, ROCKS, ROCK FRAGMENTS, ROOTS, LOGS, TRASH, VEGETATION, ETC. AND ANY OTHER OBJECTS (EXCEPT ARCHEOLOGICAL OR HISTORIC RESOURCES) THAT
EXIST WITHIN THE PROJECT AREA OR ARE UNEARTHED DURING THE DREDGING
OPERATIONS, SHALL BE REMOVED, TRANSPORTED, AND DISPOSED OF AT AN APPROPRIATE
DISPOSAL SITE AND WILL NOT CONSTITUTE A CHANGE OF CONDITION TO THE
CONTRACT/AGREEMENT. REMOVAL AND DISPOSAL OF DEBRIS WILL TO BE SOLE
RESPONSIBILITY OF THE CONTRACTOR IN ITS ENTIRELY. IF ARCHEOLOGICAL OR HISTORIC
RESOURCES ARE ENCOUNTERED THE CONTRACTOR SHALL NOTIFY THE COUNTY
IMMEDIATELY AND STOP WORK UNTIL DIRECTED TO RESTART. REMOVAL AND DISPOSAL
OF DEBRIS AND OBSTRUCTIONS SHALL NOT BE PROVIDED SEPARATELY FOR PAYMENT. ALL
COSTS ASSOCIATED WITH THE REQUIRED DISPOSAL OF DEBRIS SHALL BE INCLUDED IN THE
CONTRACT PRICE FOR DREDGING.
21. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY MATERIAL THAT
ACCUMULATES IN THE DREDGED CHANNEL OR OTHER AREAS AS A RESULT OF THE
CONTRACTOR'S ACTIVITY AND/OR OPERATIONS.
22. THE WORK IS TO BE COMPLETED WITHIN THE AREA SHOWN ON THE PLANS. IF ADDITIONAL
AREA IS REQUIRED FOR STORAGE OF EQUIPMENT OR MATERIALS, ARRANGEMENTS FOR
SUCH STORAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. NO
STAGING, OFFLOADING, OR PARKING MAY OCCUR ON VACANT LOTS WITHIN THE
RESIDENTIAL NEIGHBORHOODS (PER COUNTY CODE) WITHOUT WRITTEN PERMISSION
FROM THE LANDOWNER AND COUNTY FOR APPROVAL.
23. SPECIAL MEASURES SHALL BE TAKEN TO PREVENT BILGE PUMPAGE OR EFFLUENT,
CHEMICALS, FUELS, OILS, GREASES, AND BITUMINOUS MATERIALS FROM ENTERING THE
WATER.
24. DISPOSAL OF ANY MATERIALS, WASTES, EFFLUENT, TRASH, GARBAGE, OIL, GREASE,
CHEMICAL, ETC., IN AND ADJACENT TO THE PROJECT SITE SHALL NOT BE PERMITTED. IF
ANY WASTE MATERIALS ARE DUMPED IN UNAUTHORIZED AREAS THE CONTRACTOR SHALL
REMOVE THE MATERIAL AND RESTORE THE AREA TO THE ORIGINAL CONDITION. IF
NECESSARY, CONTAMINATED GROUND SHALL BE EXCAVATED, DISPOSED OF AS DIRECTED
BY THE ENGINEER OF RECORD, AND REPLACED WITH SUITABLE FILL MATERIAL.
25. DREDGED MATERIAL WILL BE TRANSPORTED OFFSITE TO THE PRE-APPROVED LOCATION.
26. THE COUNTY HAS PERFORMED A DESIGN SURVEY THAT IS INCLUDED IN THE CONTRACT
DRAWINGS. THIS DESIGN SURVEY WAS USED TO CALCULATE AN ESTIMATED QUANTITY OF
MATERIAL TO BE DREDGED. THIS QUANTITY IS CONSIDERED AN ESTIMATE ONLY.
PAYMENT FOR THIS WORK SHALL BE BASED ON THE ACTUAL VOLUME UPON SURVEY
VERIFICATION OF DREDGING, AS IDENTIFIED BY THE FINAL CONSTRUCTION SURVEY
PROVIDED AT THE CONTRACTOR'S COST. THE CONTRACTOR SHALL MAKE AN ASSESSMENT
OF THIS AND ANY OTHER RELEVANT INFORMATION NECESSARY, IN THE JUDGEMENT OF
THE CONTRACTOR, IN DETERMINING THE EXPECTED VOLUME TO BE REMOVED. ALL
INTERIM SURVEYS (NECESSARY FOR INTERIM PAY REQUESTS) WILL BE DONE BY THE
CONTRACTOR AT THEIR OWN EXPENSE. COMPLETE SURVEY REQUIREMENTS ARE
PROVIDED IN THE SPECIFICATIONS.
SAFETY NOTES:
1. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND ENFORCE
ALL APPLICABLE SAFETY REGULATIONS. THE INFORMATION HEREIN HAS BEEN PROVIDED
FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY THAT THE OWNER,
OWNER'S ENGINEER, OR ENGINEER OF RECORD WILL INSPECT AND/OR ENFORCE SAFETY
REGULATIONS.
2. DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THE PROJECT, ALL SAFETY
REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
CONTROL AND SAFETY OF PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO
THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER OF THE DEPARTMENT OF
TRANSPORTATION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL PERSONNEL IN THE
PROJECT AREA WEAR PROPER PERSONAL PROTECTION EQUIPMENT, INCLUDING BUT NOT
LIMITED TO SAFETY VESTS, HARD HATS, SAFETY BOOTS, EYE PROTECTION, HEARING
PROTECTION, AND PERSONAL FLOATATION DEVICES.
DEWATERING SITE CONSTRUCTION NOTES:
1. CONTRACTOR SHALL PROVIDE ACTIVE DEWATERING DETAILS REGARDING LOCATION,
SPECIFICATIONS, PROCEDURES AND PERMITS FOR THE DEWATERING SITE TO THE COUNTY
AND ENGINEER OF RECORD FOR REVIEW PRIOR TO MOBILIZATION. NO EQUIPMENT OR
PERSONNEL MAY OCCUPY ANY LANDS OR EASEMENTS AT THE DEWATERING AREA NOT
OWNED DIRECTLY BY THE COUNTY.
2. CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THOSE MEASURES NECESSARY TO
PREVENT, CONTROL AND ABATE ANY EROSION OF THE GROUND SURFACE OR SHORELINE
BANKS CAUSED BY THE WORK. THE USE OF BEST MANAGEMENT PRACTICES SUCH AS
STRAW BALES, EROSION SCREENS, AND TURBIDITY SCREENS SHALL BE USED FOR THIS
PORTION OF THE WORK. THE CONTRACTOR SHALL CONSTRUCT OR INSTALL TEMPORARY
AND PERMANENT EROSION AND SEDIMENTATION CONTROL FEATURES AS REQUIRED.
EROSION AND SEDIMENT CONTROL MEASURES SUCH AS BERMS, DIKES, DRAINS,
SEDIMENT TRAPS, SEDIMENTATION BASINS, GRASSING, MULCHING, SYNTHETIC STRAW
BALES, AND SILT FENCES SHALL BE MAINTAINED UNTIL COMPLETION OF THE WORK.
ADDITIONAL DREDGE TEMPLATE CONSTRUCTION NOTES:
1. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL MANATEE REGULATIONS.
2. AREAS WHERE PROTECTED NATURAL RESOURCES ARE PRESENT, THE CONTRACTOR WILL BE
REQUIRED TO PROTECT THE RESOURCES WITH TURBIDITY BARRIERS MAINTAINED IN THE
AREA WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR WILL BE RESPONSIBLE TO
SUBMIT A RESOURCE TURBIDITY BARRIER PLAN AS A PART OF THE BMP PLAN.
3. TURBIDITY CONTROL MEASURES WILL BE PROPERLY MAINTAINED IN COMPLIANCE WITH
FEDERAL AND STATE WATER QUALITY STANDARDS. IF TURBIDITY LEVELS EXCEED WATER
QUALITY STANDARDS, DREDGING ACTIVITY WILL CEASE UNTIL LEVELS RETURN TO THE
ACCEPTABLE RANGE. THE CONTRACTOR WILL BE RESPONSIBLE FOR MONITORING AND
RECORDING TURBIDITY READINGS EVERY FOUR HOURS (PER FDEP PERMIT
REQUIREMENTS). THE REPORTS MUST BE SUBMITTED TO THE ENGINEER OF RECORD ON A
WEEKLY BASIS. WEEKLY REPORTS OF MONITORING MUST BE SUBMITTED TO THE FDEP
PERMIT COMPLIANCE OFFICER BY 10AM EVERY MONDAY. SEE FDEP PERMIT FOR REPORT
FORMAT.
4. THE CONTRACTOR WILL OPERATE IN A MANNER THAT WILL CAUSE THE LEAST IMPACT TO
WATERWAY NAVIGATION AND ACCOMMODATE LOCAL TRAFFIC WITHIN REASON. ANY
QUESTIONS AND/OR CONCERNS SHOULD BE DIRECTED TO BREVARD COUNTY
REPRESENTATIVES.
5. DREDGE BARGES, CABLES, BUOYS, ETC. AT THE COMPLETION OF EACH DAY'S WORK WILL
HAVE WORKING MARKING/ANCHOR LIGHTS TO WARN VESSELS OF THEIR LOCATION.
6. DAMAGE TO ANY PROPERTY, UTILITIES, STRUCTURES OR NATURAL RESOURCES SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR IN A TIMELY MANNER AT THE
CONTRACTOR'S EXPENSE.
7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR ALL EQUIPMENT INGRESS
AND EGRESS TO AND FROM THE PROJECT WORK AREAS. THE CONTRACTOR SHALL MAKE
AN INVESTIGATION OF WATER ACCESS ROUTES AND THE ROAD FOR TRANSPORTATION,
LOAD LIMITS FOR BRIDGES AND ROADS, AND OTHER ROAD CONDITIONS AFFECTING THE
TRANSPORTATION OF MATERIALS AND EQUIPMENT TO THE WORK SITES.
8. THE TRAFFIC USING THE PROJECT AREA IS GENERALLY RECREATION AND SMALL
COMMERCIAL VESSELS. THE CONTRACTOR WILL THEN BE RESPONSIBLE TO PROVIDE A
MOBILIZATION AND DREDGE SEQUENCE PLAN AT THE PRE-CONSTRUCTION MEETING
IDENTIFYING THE CONFLICTS AND THE DURATION OF IMPACT TO NAVIGABLE TRAFFIC.
9. THE CONTRACTOR WILL BE REQUIRED TO CONDUCT THE WORK IN SUCH MANNER AS TO
OBSTRUCT NAVIGATION AS LITTLE AS POSSIBLE DURING NORMAL WORKING HOURS, AND
IN THE EVENT THE CONTRACTOR'S EQUIPMENT OBSTRUCTS THE CHANNEL AS TO MAKE
DIFFICULT OR ENDANGER THE SAFE PASSAGE OF VESSELS, CONTRACTOR SHALL MAKE
REASONABLE EFFORTS TO AFFORD A PRACTICABLE AND SAFE PASSAGE. UPON THE
COMPLETION OF THE WORK THE CONTRACTOR SHALL PROMPTLY REMOVE THE DREDGE
EQUIPMENT, ETC. INCLUDING BUOYS AND OTHER MARKERS TO ALLOW SAFE PASSAGE. IN
ADDITION, THE CONTRACTOR WILL NOT OBSTRUCT NAVIGATION DURING NON-WORKING
PERIODS, AND ANY SUSPENSION OF WORK THAT OCCURS FOR THE DURATION OF THE
PROJECT. THE CONTRACTOR WILL ALSO BE REQUIRED TO REMOVE OBSTRUCTIONS
(INCLUDING TURBIDITY CURTAINS, ONCE TURBIDITY IS BELOW 29 NTUS ABOVE
BACKGROUND) TO NAVIGATION DURING THE EVENING AFTER NORMAL WORKING HOURS
AND WILL MAINTAIN CLOSE COMMUNICATION WITH THE COUNTY AND ENGINEER AS TO
TRAFFIC CONDITIONS AND TO ANY PROBLEMS THAT ARISE.
10. DREDGE/BARGE OPERATOR WILL MONITOR VHF CH. 16 AT ALL TIMES DURING
OPERATIONS TO COMMUNICATE WITH VESSELS.
11. THE CONTRACTOR SHALL ALSO INVESTIGATE THE AVAILABILITY OF ANY STAGING,
STORAGE, AND STOCK PILING AREAS AND SHALL MAKE ALL ARRANGEMENTS FOR USE OF
ANY SUCH AREAS FOR THE DELIVERY OF ANY MATERIALS AND EQUIPMENT TO BE USED IN
COMPLETING THE WORK.
12. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE FOR APPROVAL A PLAN DEPICTING THE
LOCATION OF THE DREDGE PIPELINE, PUMPS, SITE ACCESS, AND EQUIPMENT
INFORMATION TO BE USED FOR DREDGING ACTIVITIES.
13. NEAR COMPLETION OF THE PROJECT THE COUNTY AND CONTRACTOR WILL CONDUCT A
PRE-FINAL INSPECTION. IN ADDITION TO THE COMPLETION OF POST-DREDGE SURVEY, THE
COUNTY WILL INSPECT FOR DEMOBILIZATION AND CLEAN-UP OF TEMPORARY STAGING
AREAS. THE COUNTY WILL PERFORM THE PRE-FINAL INSPECTION TO VERIFY WORK IS
COMPLETE AND READY FOR FINAL ACCEPTANCE. THE COUNTY PRE-FINAL INSPECTION MAY
RESULT IN ADDITIONAL WORK TO BE DONE. THE CONTRACTOR SHALL ENSURE ITEMS ARE
CORRECTED BEFORE NOTIFYING THE COUNTY SO THAT A FINAL INSPECTION CAN BE
SCHEDULED. ANY ITEMS NOTED ON THE PRE-FINAL INSPECTION SHALL BE CORRECTED IN A
TIMELY MANNER. PRE-FINAL INSPECTION AND DEFICIENCY CORRECTIONS SHALL BE
ACCOMPLISHED WITHIN THE PROJECT COMPLETION PERIOD.
MARIE YARBROUGH, PE
MARIE.YARBROUGH@ATKINSREALIS.COM
2671 W. EAU GALLIE BLVD SUITE 104,
MELBOURNE, FL 32935
TELEPHONE: (321) 775-6642
JUSTIN BARTUSEK, PE
JUSTIN.BARTUSEK@ATKINSREALIS.COM
2671 W. EAU GALLIE BLVD SUITE 104,
MELBOURNE, FL 32935
TELEPHONE: (321) 775-6238
E D
ES
C
R
IP
TI
O
N
D ra w in g N am e:
C :\U se rs
\D
AY
M
\A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
\G -1
G
EN
ER
AL
N
O
TE
S.
2,
- 1 0:
am
EA
U
G
AL
LI
E
AR
EA
A
M U
C K
R
EM
O
VA
L
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
G
EN
ER
AL
N O
TE
S
100087645
JRK
JRK
KMG
SMY
G-102
S. MARIE YARBROUGH
FL 70748
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
12345678 N
O
TI
C E:
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
D
O C
U M
EN
T
W
AS
P R
EP
AR
ED
B
Y
AT
KI
N
SR
ÉA
LI
S, IN
C
. W H
IL
E
AT
KI
N
SR
ÉA
LI
S H
AS
T
AK
EN
A
LL
R
EA
SO
N
AB
LE
S
TE
PS
T
O A
SS
U
R E
TH
E
AC
C
U R
AC
Y
O F
TH
E
I N
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
I N
T H
IS
D
O C
U M
EN
T, I T
C
AN
N O
T G
U
AR
AN
TE
E
TH
AT
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S
TO
T H
IS
D
O C
U M
EN
T
W
IL
L N
O T
BE
M
AD
E
BY
P
ER
SO
N S
O
N
SR
ÉA
LI
S
PE
R
SO
N
D
O C
U M
EN
T
LE
PO
SS
ES
SI
O N
O F
AT
KI
N
SR
ÉA
LI
S.
C
H
AN
G
ES
O R
A
LT
ER
AT
IO
N
S M
AY
B
E
SA
FE
TY
R
EL
AT
ED
AG
PE
R
TY
PE
R
SO
R Y
R
IF
IC
AT
IO
N
O F
TH
E
IN
FO
R M
AT
IO
N C
O N
TA
IN
ED
I
N T
H
IS
D O
C U
M
EN
T
IS
N
EE
D
ED
C
O N
TA
C
T
SH
O U
LD
B
E M
AD
E
D
IR
EC
TL
Y W
IT
H
A
TK
IN
SR
ÉA
LI
S.
T
H
IS
D O
C U
M
EN
T M
U
ST
B E
C O
M
PA
O
R
IG
PY
W
TI
IF
AP
PL
IC
AB
LE
, I
N O
R D
ER
T
O
IN
SU
R
E
TH
E
AC
C U
R
AC
Y O
F
TH
E
IN
FO
R
M
AT
IO
N
C O
N
TA
IN
ED
TH
ER
R
E
AN
G
ES
AL
TE
R
AT
IO
N S
O R
M O
D
IF
IC
AT
IO
N
S H
AV
E
BE
EN
M
AD
E
TO
T H
E D
O C
U M
EN
T.
N O
R
EL
IA
N
C E
SH
O
U
LD
E
VE
R B
E M
AD
E
O N
A D
O C
U M
EN
TA
TI
O
N T
R
AN
SM
IT
TE
D
O R
R
EV
IE
W
ED
B
Y C
O M
PU
TE
R O
R O
TH
ER
EL
EC
TR
O
N
IC
M
EA
N S
U N
LE
SS
IT
IS
F
IR
ST
C
O M
PA
R
ED
T
O T
H E
O R
IG
IN
AL
. A
TK
IN
SR
ÉA
LI
S
M
AK
ES
N
O W
AR
R
AN
TI
ES
, E
XP
R
ES
S
O R
IM
PL
IE
D
, C O
N C
ER
N
IN
G
T H
E A
C C
U R
AC
Y
O F
TH
E
IN
FO
R M
AT
N
TA
D
O C
U M
EN
T
TR
AN
SM
IT
IE
O M
PU
TE
R O
R O
TH
ER
E
LE
C
TR
O N
IC
M
EA
N
S.
DATE:
O R
IG
IN
A L
IS
SU
ED
D
A
TE
NATURAL
RESOURCES
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
STANDARD MANATEE CONSTRUCTION CONDITIONS:
THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING MANATEE PROTECTION
CONSTRUCTION CONDITIONS:
1. THE CONTRACTOR SHALL INSTRUCT ALL PERSONNEL ASSOCIATED WITH THE PROJECT OF
THE POTENTIAL PRESENCE OF MANATEES AND THE NEED TO AVOID COLLISIONS WITH
MANATEES. ALL CONSTRUCTION PERSONNEL ARE RESPONSIBLE FOR OBSERVING
WATER-RELATED ACTIVITIES FOR THE PRESENCE OF MANATEE(S).
2. THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION PERSONNEL THAT THERE ARE CIVIL
AND CRIMINAL PENALTIES FOR HARMING, HARASSING, OR KILLING MANATEES WHICH ARE
PROTECTED UNDER THE MARINE MAMMAL PROTECTION ACT OF 1972, THE ENDANGERED
SPECIES ACT OF 1973, AND THE FLORIDA MANATEE SANCTUARY ACT.
3. TURBIDITY BARRIERS SHALL BE MADE OF MATERIAL IN WHICH MANATEES CANNOT BECOME
ENTANGLED, ARE PROPERLY SECURED, AND ARE REGULARLY MONITORED TO AVOID
MANATEE ENTRAPMENT. BARRIERS MUST NOT BLOCK MANATEE ENTRY TO OR EXIT FROM
ESSENTIAL HABITAT.
4. ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT "NO
WAKE/IDLE" SPEEDS AT ALL TIMES WHILE IN THE CONSTRUCTION AREA AND WHILE IN
WATER WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR FOOT CLEARANCE
FROM THE BOTTOM. ALL VESSELS WILL FOLLOW ROUTES OF DEEP WATER WHENEVER
POSSIBLE.
5. IF MANATEE(S) ARE SEEN WITHIN 100 YARDS OF THE ACTIVE DAILY
CONSTRUCTION/DREDGING OPERATION OR VESSEL MOVEMENT, ALL APPROPRIATE
PRECAUTIONS SHALL BE IMPLEMENTED TO ENSURE PROTECTION OF THE MANATEE. THESE
PRECAUTIONS SHALL INCLUDE THE OPERATION OF ALL MOVING EQUIPMENT NO CLOSER
THAN 50 FEET OF A MANATEE. OPERATION OF ANY EQUIPMENT CLOSER THAN 50 FEET TO A
MANATEE SHALL NECESSITATE IMMEDIATE SHUTDOWN OF THAT EQUIPMENT. ACTIVITIES
WILL NOT RESUME UNTIL THE MANATEE(S) HAS DEPARTED THE PROJECT AREA OF ITS OWN
VOLITION.
6. ANY COLLISION WITH AND/OR INJURY TO A MANATEE SHOULD BE REPORTED IMMEDIATELY
TO THE FWC HOTLINE AT 1-888-404-FWCC. COLLISION AND/OR INJURY SHOULD ALSO BE
REPORTED TO THE U.S. FISH AND WILDLIFE SERVICE IN JACKSONVILLE (1-904-232-2580) FOR
NORTH FLORIDA OR VERO BEACH (1-772-562-3909) IN SOUTH FLORIDA.
7. TEMPORARY SIGNS CONCERNING MANATEES SHALL BE POSTED PRIOR TO AND DURING ALL
CONSTRUCTION/DREDGING ACTIVITIES. ALL SIGNS ARE TO BE REMOVED BY THE
CONTRACTOR UPON COMPLETION OF THE PROJECT. A SIGN MEASURING AT LEAST 3 FT. BY 4
FT. WHICH READS "CAUTION: MANATEE AREA" WILL BE POSTED IN A LOCATION
PROMINENTLY VISIBLE TO WATER RELATED CONSTRUCTION CREWS. A SECOND SIGN
SHOULD BE POSTED IF VESSELS ARE ASSOCIATED WITH THE CONSTRUCTION AND SHOULD BE
PLACED VISIBLE TO THE VESSEL OPERATOR. THE SECOND SIGN SHOULD BE AT LEAST 8-12"
BY 11" WHICH READS "CAUTION: MANATEE HABITAT. IDLE SPEED IS REQUIRED IF
OPERATING A VESSEL IN THE CONSTRUCTION AREA. ALL EQUIPMENT MUST BE SHUTDOWN
IF A MANATEE COMES WITHIN 50 FEET OF OPERATION.
SEATURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING CONSTRUCTION CONDITIONS FOR
PROTECTION OF SEA TURTLES AND SMALLTOOTH SAWFISH:
1. THE CONTRACTOR SHALL INSTRUCT ALL PERSONNEL ASSOCIATED WITH THE PROJECT OF
THE POTENTIAL PRESENCE OF THESE SPECIES AND THE NEED TO AVOID COLLISIONS WITH
SEA TURTLES AND SMALLTOOTH SAWFISH. ALL CONSTRUCTION PERSONNEL ARE
RESPONSIBLE FOR OBSERVING WATER-RELATED ACTIVITIES FOR THE PRESENCE OF THESE
SPECIES.
2. THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION PERSONNEL THAT THERE ARE CIVIL
AND CRIMINAL PENALTIES FOR HARMING, HARASSING, OR KILLING SEA TURTLES OR
SMALLTOOTH SAWFISH, WHICH ARE PROTECTED UNDER THE ENDANGERED SPECIES ACT OF
1973.
3. SILTATION BARRIERS SHALL BE MADE OF MATERIAL IN WHICH A SEA TURTLE OR
SMALLTOOTH SAWFISH CANNOT BECOME ENTANGLED. SILTATION BARRIERS SHALL BE
PROPERLY SECURED AND REGULARLY MONITORED TO AVOID PROTECTED SPECIES
ENTRAPMENT. BARRIERS MAY NOT BLOCK SEA TURTLE OR SMALLTOOTH SAWFISH ENTRY TO
OR EXIT FROM DESIGNATED CRITICAL HABITAT WITHOUT PRIOR AGREEMENT FROM THE
NATIONAL MARINE FISHERIES SERVICE'S PROTECTED RESOURCES DIVISION, ST. PETERSBURG, FLORIDA.
4. ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT “NO
WAKE/IDLE” SPEEDS AT ALL TIMES WHILE IN THE CONSTRUCTION AREA AND WHILE IN
WATER DEPTHS WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR-FOOT
CLEARANCE FROM THE BOTTOM. ALL VESSELS WILL PREFERENTIALLY FOLLOW DEEP-WATER
ROUTES (E.G., MARKED CHANNELS) WHENEVER POSSIBLE.
5. IF A SEA TURTLE OR SMALLTOOTH SAWFISH IS SIGHTED WITHIN 100 YARDS OF THE ACTIVE
DAILY CONSTRUCTION OPERATION OR VESSEL MOVEMENT, ALL APPROPRIATE PRECAUTIONS
SHALL BE IMPLEMENTED BY THE CONTRACTOR TO ENSURE ITS PROTECTION. THESE
PRECAUTIONS SHALL INCLUDE CESSATION OF OPERATION OF ANY MOVING EQUIPMENT
CLOSER THAN 50 FEET OF A SEA TURTLE OR SMALLTOOTH SAWFISH. OPERATION OF ANY
MECHANICAL CONSTRUCTION EQUIPMENT SHALL CEASE IMMEDIATELY IF A SEA TURTLE OR
SMALLTOOTH SAWFISH IS SEEN WITHIN A 50 - FT RADIUS OF THE EQUIPMENT. ACTIVITIES
MAY NOT RESUME UNTIL THE PROTECTED SPECIES HAS DEPARTED THE PROJECT AREA OF ITS
OWN VOLITION.
6. ANY COLLISION WITH AND/OR INJURY TO A SEA TURTLE OR SMALLTOOTH SAWFISH SHALL
BE REPORTED IMMEDIATELY TO THE OWNER/ENGINEER AND TO THE NATIONAL MARINE
FISHERIES PROTECTED RESOURCES DIVISION (727-824-5312) AND TO THE LOCAL
AUTHORIZED SEA TURTLESTRANDING/RESCUE ORGANIZATION.
EASTERN INDIGO SNAKE CONSTRUCTION CONDITIONS:
THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING CONSTRUCTION CONDITIONS FOR
PROTECTION OF EASTERN INDIGO SNAKE:
1. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL POST EDUCATIONAL
POSTERS (AT LEAST 11” BY 17”) IN THE CONSTRUCTION OFFICE AND THROUGHOUT THE
CONSTRUCTION SITE, INCLUDING ANY ACCESS ROADS. THE POSTERS MUST BE CLEARLY
VISIBLE TO ALL CONSTRUCTION STAFF. THE POSTERS SHALL CONTAIN THE FOLLOWING
INFORMATION:
2. IF YOU SEE A LIVE EASTERN INDIGO SNAKE ON THE SITE:
· CEASE CLEARING ACTIVITIES AND ALLOW THE LIVE EASTERN INDIGO SNAKE SUFFICIENT
TIME TO MOVE AWAY FROM THE SITE WITHOUT INTERFERENCE; PERSONNEL MUST NOT
ATTEMPT TO TOUCH OR HANDLE SNAKE DUE TO PROTECTED STATUS.
· TAKE PHOTOGRAPHS OF THE SNAKE, IF POSSIBLE, FOR IDENTIFICATION AND
DOCUMENTATION PURPOSES.
· IMMEDIATELY NOTIFY SUPERVISOR OR THE APPLICANT'S DESIGNATED AGENT, AND THE
APPROPRIATE USFWS OFFICE, WITH THE LOCATION INFORMATION AND CONDITION OF
THE SNAKE.
· IF THE SNAKE IS LOCATED IN A VICINITY WHERE CONTINUATION OF THE CLEARING OR
CONSTRUCTION ACTIVITIES WILL CAUSE HARM TO THE SNAKE, THE ACTIVITIES MUST HALT
UNTIL SUCH TIME THAT A REPRESENTATIVE OF THE USFWS RETURNS THE CALL (WITHIN
ONE DAY) WITH FURTHER GUIDANCE AS TO WHEN ACTIVITIES MAY RESUME.
3. IF YOU SEE A DEAD EASTERN INDIGO SNAKE ON THE SITE:
· CEASE CLEARING ACTIVITIES AND IMMEDIATELY NOTIFY SUPERVISOR OR THE APPLICANT'S
DESIGNATED AGENT, AND THE APPROPRIATE USFWS OFFICE, WITH THE LOCATION
INFORMATION AND CONDITION OF THE SNAKE.
· TAKE PHOTOGRAPHS OF THE SNAKE, IF POSSIBLE, FOR IDENTIFICATION AND
DOCUMENTATION PURPOSES.
· THOROUGHLY SOAK THE DEAD SNAKE IN WATER AND THEN FREEZE THE SPECIMEN. THE
APPROPRIATE WILDLIFE AGENCY WILL RETRIEVE THE DEAD SNAKE.
4. TELEPHONE NUMBERS OF USFWS FLORIDA FIELD OFFICES TO BE CONTACTED IF A LIVE OR
DEADEASTERN INDIGO SNAKE IS ENCOUNTERED: NORTH FLORIDA FIELD OFFICE- (904)
731-3336 PANAMA CITY FIELD OFFICE - (850) 769-0552SOUTH FLORIDA FIELD OFFICE - (772) 562-3909
IF AN EASTERN INDIGO SNAKE IS DISCOVERED DURING GOPHER TORTOISE
RELOCATIONACTIVITIES (I.E. BURROW EXCAVATION), THE USFWS SHALL BE CONTACTED WITHIN
ONE BUSINESS DAY TO OBTAIN FURTHER GUIDANCE WHICH MAY RESULT IN FURTHER PROJECT
CONSULTATION.
PROJECT CONTROL TABLE
NORTH AMERICAN DATUM OF 1983 - FL EAST 0901
DESIGNATION EASTING NORTHING NAVD 88' (FT) PID DESCRIPTION
111 777145.15 1378233.48 3.59 EGH-4 1991 USACE DISK
BASELINE POINT TABLE
STA EASTING NORTHING
START: 0+00 779013.62 1382033.18
STOP: 35+50 782351.90 1383241.18
SEE SHEET C-100 FOR PAY SECTION BOUNDARIES
DREDGE LIMITS POINT TABLE
NAME
NORTHING
28.139629
28.140091
28.136719
28.137005
28.136501
28.137009
28.136370
28.134549
28.135021
28.134050
28.135362
28.135615
28.138504
EASTING
-80.618863
-80.611519
-80.611873
-80.610976
-80.610768
-80.609378
-80.609064
-80.614384
-80.614622
-80.617672
-80.618147
-80.615406
-80.618426
AREA LIMIT (TYP.)
M
I L
I L
E
M I L
E
M I L
E
M I L
E
M I L
E
M I L
E
M I
T
Y
P
I
C
S
C
T
I
A
BV-52 DREDGE
MATERIAL
MANAGEMENT AREA
PROPOSED PIPELINE ROUTE.
LOCATE MINIMUM 100' FROM
EDGE OF CHANNEL (TYP.)
MAXIMUM PUMPING DISTANCE
APPROX. 7 MILES.
ICW CHANNEL (TYP.)
PIPELINE CROSSING
OF ICW
M
E
L
B
O
U
R
T
E
R
N
A
T
I
O
N
R
P
O
R
T
E
L
L
V
E
R
E
L
L
B
V
V
E
N
U
E
M
E
L
B
O
U
R
N
E
C
R
A
E
E
K
E A
U
G
A L L
V
D
B
R I D
G E
MELBOURNE BEACH
A A
F
L
O
R
I
A
I L
R
O
A
D
I N
D
I
R
B
A
C
H
INDIAN RIVER
T
H
A
V E
N U
E
B
R I D
G E
POTENTIAL UTILITY CROSSING
AREA. CONTRACTOR TO
VERIFY UTILITY LOCATIONS
PRIOR TO DREDGING AND
PIPELINE ANCHORING
UTILITY CROSSING
NO DREDGING OR
PIPELINE ANCHORING
IN THIS AREA
POTENTIAL UTILITY CROSSING AREA.
CONTRACTOR TO VERIFY UTILITY
LOCATIONS PRIOR TO DREDGING
AND PIPELINE ANCHORING
EXACT PIPELINE LAYOUT, FLOATING VS
SUBMERGED REACHES, AND BOOSTER
PUMP LOCATIONS SHALL MEET ALL U.S.
COAST GUARD AND U.S. ARMY CORPS OF
ENGINEERS REQUIREMENTS AND BE
PROVIDED BY CONTRACTOR.
FEET
0 2500 5000
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
2345678
N O
T I C
E
T H
E
I N
F O
R M
A T
I O
N
C
U M
E N
T
W
P
E
P A
R E
D
B
Y
A
T K
I N
S R
É A
L I S
I N
C
W
H I L E
A T
K I N
S R
É A
L
K
L
R
E A
S O
N A
B
E
A
S S
U R
E
T
C
U R
A C
Y
O
F
T
F O
R M
A T
I
N T
A I N
C
U M
E N
N
N
A R
A N
T
A T
C H
A N
G E
S
O
R
A
L T
E R
A T
I O
T
H
C
U M
E N
T
W
I
M
A D
E
B
Y
P
E R
S O
N S
O T
H
K
I N
S R
É A
L
R
S O
N N
F
T
C U
M E
A V
E
P O
S S
E S
S I O
N
O
F
A
T K
I N
S R
É A
L I S
C
H A
N G
A
L T
E R
A T
I O
S
A F
E T
Y
R
E L A
T E
D
A
S U
M
A
O
P E
R T
R S
O N
J U
A T
V E
R I F
I C
A T
I
F O
R M
A T
I
N T
A I N
C
U M
E
E
D E
D
C O
N T
A C
T
S
H O
U
M
A D
E
D
I R
E C
T
T
H
A
T K
I N
S R
É A
L I S
T
H
C
U M
E N
T
M
U S
T
B
E
C O
M P
A R
I G
I N
P
R T
I F
I
I S
A
A P
P L I C
A B
L E
D
I N
S U
C
U R
A C
Y
O
F
T
F O
R M
A T
I O
N
C
O N
T A
I N
E D
T H
E R
E
R T
H
S U
A
N G
E
T
E R
A T
I O
M O
D I F
I C
A T
I O
V
E
B
E E
N
M
A D
E
T
O
T
C
U M
E N
T
N
O
R
E L I A
N C
E
S
H O
U
E
R
B
E
M A
C
U M
E N
T A
T I O
N
T
R A
N S
M I T
T E
D
O
R
R
E V
I E
W E
D
B
Y
C
O M
P U
T E
R
O
R
O
T H
E R
E L E
C T
R O
N
A
L E
R
M
P A
R E
D
T
O
T
I G
I N
A L
A
T K
I N
S R
É A
L I S
M A
K E
S
N
O
W
A R
R A
N T
I E
S
E
X P
R E
I M
P L I E
D
C
O N
C E
R N
I N
G
T
C
U R
A C
Y
O
F
T
H E
I N
F O
R M
A T
I
N T
A I N
C
U M
E
A N
S M
I T
T
V
I E
W
C O
M P
U T
O
T H
E
C T
R O
N
A
N S
DATE:
O R
I G
I N
S U
T
NATURAL
RESOURCES
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
D A
T E
D E
S C
R I P
T I O
N
D r a w i n g
N a m e
C
U s e r s B
R U
S O n e D r i v e
C o r p A t k i n s R é a l i s E a u
G a l l i e
M u c k
R e m o v a l
P r o j e c t
H a m m e r h e a d
D e s i g n
S e p t e m b e r G
P
R O
J E
E
R V
I E
W
L A
Y O
U T d w c t a m
E A
U
G
A L L
E
A
C
K
R
E M
O V
A L
C O
N S
T R
U C
T I O
N
D
R A
W I N
G S
P R
O J E
E
R V
I E
W
L A
Y O
U T
100087645
JRK
JRK
KMG
SMY
G-103
S. MARIE YARBROUGH
FL 70748
P
I
C
C
T
I
A
FEET
0 2500 5000
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
2345678
N O
T I C
E
T H
E
I N
F O
R M
A T
I O
N
C
U M
E N
T
W
E
P A
R E
D
B
Y
A
T K
I N
S R
É A
L I S
I N
C
W
H I L E
A T
K I N
S R
É A
L
K
L
R
E A
S O
N A
B
E
A
S S
U R
E
T
C
U R
A C
Y
O
F
T
F O
R M
A T
I
N T
A I N
C
U M
E N
N
N
A R
A N
T
A T
C H
A N
G E
S
O
R
A
L T
E R
A T
I O
T
H
C
U M
E N
T
W
I
M
A D
E
B
Y
P
E R
S O
N S
O T
H
K
I N
S R
É A
L
R
S O
N N
T
C U
M E
A V
E
P O
S S
E S
S I O
N
O
F
A
T K
I N
S R
É A
L I S
C
H A
N G
A
L T
E R
A T
I O
S
A F
E T
Y
R
E L A
T E
D
A
S U
M
A
O
P E
R T
R S
O N
J U
A T
V E
R I F
I C
A T
I
F O
R M
A T
I
N T
A I N
C
U M
E
E
D E
D
C O
N T
A C
T
S
H O
U
M
A D
E
D
I R
E C
T
T
H
A
T K
I N
S R
É A
L I S
T
H
C
U M
E N
T
M
U S
T
B
E
C O
M P
A R
I G
I N
P
R T
I F
I
I S
A
A P
P L I C
A B
L E
D
I N
S U
C
U R
A C
Y
O
F
T
F O
R M
A T
I O
N
C
O N
T A
I N
E D
T H
E R
E
R T
H
S U
A
N G
E
T
E R
A T
I O
M O
D I F
I C
A T
I O
V
E
B
E E
N
M
A D
E
T
O
T
C
U M
E N
T
N
O
R
E L I A
N C
E
S
H O
U
E
R
B
E
M A
C
U M
E N
T A
T I O
N
T
R A
N S
M I T
T E
D
O
R
R
E V
I E
W E
D
B
Y
C
O M
P U
T E
R
O
R
O
T H
E R
E L E
C T
R O
N
A
L E
R
M
P A
R E
D
T
O
T
I G
I N
A L
A
T K
I N
S R
É A
L I S
M A
K E
S
N
O
W
A R
R A
N T
I E
S
E
X P
R E
I M
P L I E
D
C
O N
C E
R N
I N
G
T
C
U R
A C
Y
O
F
T
H E
I N
F O
R M
A T
I
N T
A I N
C
U M
E
A N
S M
I T
T
V
I E
W
C O
M P
U T
O
T H
E
C T
R O
N
A
N S
DATE:
O R
I G
I N
S U
T
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
D A
T E
D E
S C
R I P
T I O
N
D r a w i n g
N a m e
C
U s e r s B
R U
S O n e D r i v e
C o r p A t k i n s R é a l i s E a u
G a l l i e
M u c k
R e m o v a l
P r o j e c t
H a m m e r h e a d
D e s i g n
S e p t e m b e r G
P
R O
J E
E
R V
I E
W
L A
Y O
U T d t a m
E A
U
G
A L L
E
A
C
K
R
E M
O V
A L
C O
N S
T R
U C
T I O
N
D
R A
W I N
G S
P R
O J E
E
R V
I E
W
K
P
100087645
JRK
JRK
KMG
SMY
G-104
S. MARIE YARBROUGH
FL 70748
C-100
C-112
C-112
C-113
C-109
C-114
-17
-16
-14
-13
-12
-11
-10
-13
-12
-11
-10
-9
-8
-7
-6
-6
-7
-8
-9
-10
-1
-11
AREA 1A LIMITS
DREDGE LIMITS
UTILITY CROSSING
AREA SOUTH OF THIS LOCATION.
CONTRACTOR TO VERIFY
UTILITY LOCATIONS PRIOR TO
DREDGING AND PIPELINE ANCHORING.
ICW CHANNEL (TYP)
NO DREDGE WITHIN 50'
OF ANY STRUCTURE (TYP)
BASELINE
END OF
TEMPLATE
STA 35+50
X6
FWC MARKER
X4
Z
X7
X5
X3
X2
X1
Y
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
2345678
N O
T I C
E
T H
E
I N
F O
R M
A T
I O
N
C
U M
E N
T
W
E
P A
R E
D
B
Y
A
T K
I N
S R
É A
L I S
I N
C
W
H I L E
A T
K I N
S R
É A
L
K
L
R
E A
S O
N A
B
E
A
S S
U R
E
T
C
U R
A C
Y
O
F
T
F O
R M
A T
I
N T
A I N
C
U M
E N
N
N
A R
A N
T
A T
C H
A N
G E
S
O
R
A
L T
E R
A T
I O
T
H
C
U M
E N
T
W
I
M
A D
E
B
Y
P
E R
S O
N S
O T
H
K
I N
S R
É A
L
R
S O
N N
T
C U
M E
A V
E
P O
S S
E S
S I O
N
O
F
A
T K
I N
S R
É A
L I S
C
H A
N G
A
L T
E R
A T
I O
S
A F
E T
Y
R
E L A
T E
D
A
S U
M
A
O
P E
R T
R S
O N
J U
A T
V E
R I F
I C
A T
I
F O
R M
A T
I
N T
A I N
C
U M
E
E
D E
D
C O
N T
A C
T
S
H O
U
M
A D
E
D
I R
E C
T
T
H
A
T K
I N
S R
É A
L I S
T
H
C
U M
E N
T
M
U S
T
B
E
C O
M P
A R
I G
I N
P
R T
I F
I
I S
A
A P
P L I C
A B
L E
D
I N
S U
C
U R
A C
Y
O
F
T
F O
R M
A T
I O
N
C
O N
T A
I N
E D
T H
E R
E
R T
H
S U
A
N G
E
T
E R
A T
I O
M O
D I F
I C
A T
I O
V
E
B
E E
N
M
A D
E
T
O
T
C
U M
E N
T
N
O
R
E L I A
N C
E
S
H O
U
E
R
B
E
M A
C
U M
E N
T A
T I O
N
T
R A
N S
M I T
T E
D
O
R
R
E V
I E
W E
D
B
Y
C
O M
P U
T E
R
O
R
O
T H
E R
E L E
C T
R O
N
A
L E
R
M
P A
R E
D
T
O
T
I G
I N
A L
A
T K
I N
S R
É A
L I S
M A
K E
S
N
O
W
A R
R A
N T
I E
S
E
X P
R E
I M
P L I E
D
C
O N
C E
R N
I N
G
T
C
U R
A C
Y
O
F
T
H E
I N
F O
R M
A T
I
N T
A I N
C
U M
E
A N
S M
I T
T
V
I E
W
C O
M P
U T
O
T H
E
C T
R O
N
A
N S
DATE:
O R
I G
I N
S U
T
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
D A
T E
D E
S C
R I P
T I O
N
D r a w i n g
N a m e
C
U s e r s B
R U
S O n e D r i v e
C o r p A t k i n s R é a l i s E a u
G a l l i e
M u c k
R e m o v a l
P r o j e c t
H a m m e r h e a d
D e s i g n
S e p t e m b e r C
D
R E
D G
E
T
E M
P L A
T
H
E
X I S
T I N
G
C
O N
D I T
I O
N S d t a m
E A
U
G
A L L
E
A
C
K
R
E M
O V
A L
C O
N S
T R
U C
T I O
N
D
R A
W I N
G S
D R
E D
M
P L A
T
H
E
X I S
T I N
G
C
O N
D I T
I O
N S
100087645
JRK
JRK
KMG
SMY
C-100
S. MARIE YARBROUGH
FL 70748
LEGEND
MAJOR CONTOUR
MINOR CONTOUR
PROPOSED
PIPELINE
DREDGE
BOUNDARY
MUCK THICKNESS
CONTOUR
*CONTOURS ARE BATHYMETRY/TOP
OF MUCK
FWC MARKER CONDITIONS:
REMOVE AND REINSTALL ALL FWC
MARKER(S) FOUND WITHIN THE
DREDGE TEMPLATE. REFER TO
TECHNICAL SPECIFICATIONS 35 24 00.
SECTIONS
DREDGE
TEMPLATE (CY)
AREA (SF)
X1 17,907 366,328
X2 862 32,852
X3 48,280 1,043,097
X4 509 46,108
X5 28215 757,010
X6 4,893 182,672
X7 3,746 115,122
Y 25,174 360,124
Z 162,167 845,881
FEET
0 300 600
MUCK THICKNESS
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
COLOR VOLUME (CY)
68,735
62,046
55,651
31,827
24,993
19,258
13,301
5,171
0.50
0.50
MIN MAX
-17
-16
-14
-13
-12
-11
-10
-13
-12
-11
-10
-9
-8
-7
-6
-6
-7
-8
-9
-10
-1
-11
AREA 1A LIMITS
DREDGE LIMITS
UTILITY CROSSING
AREA SOUTH OF THIS LOCATION.
CONTRACTOR TO VERIFY
UTILITY LOCATIONS PRIOR TO
DREDGING AND PIPELINE ANCHORING.
ICW CHANNEL (TYP)
NO DREDGE WITHIN 50'
OF ANY STRUCTURE (TYP)
BASELINE
END OF
TEMPLATE
STA 35+50
FWC MARKER
Point Table
Name
Northing
28.139622
28.140083
28.136712
28.136997
28.136493
28.137002
28.136362
28.134541
28.135014
28.134042
28.135355
28.135607
28.138496
Easting
-80.618868
-80.611524
-80.611877
-80.610981
-80.610773
-80.609383
-80.609069
-80.614389
-80.614627
-80.617677
-80.618152
-80.615411
-80.618430
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
2345678
N O
T I C
E
T H
E
I N
F O
R M
A T
I O
N
C
U M
E N
T
W
E
P A
R E
D
B
Y
A
T K
I N
S R
É A
L I S
I N
C
W
H I L E
A T
K I N
S R
É A
L
K
L
R
E A
S O
N A
B
E
A
S S
U R
E
T
C
U R
A C
Y
O
F
T
F O
R M
A T
I
N T
A I N
C
U M
E N
N
N
A R
A N
T
A T
C H
A N
G E
S
O
R
A
L T
E R
A T
I O
T
H
C
U M
E N
T
W
I
M
A D
E
B
Y
P
E R
S O
N S
O T
H
K
I N
S R
É A
L
R
S O
N N
T
C U
M E
A V
E
P O
S S
E S
S I O
N
O
F
A
T K
I N
S R
É A
L I S
C
H A
N G
A
L T
E R
A T
I O
S
A F
E T
Y
R
E L A
T E
D
A
S U
M
A
O
P E
R T
R S
O N
J U
A T
V E
R I F
I C
A T
I
F O
R M
A T
I
N T
A I N
C
U M
E
E
D E
D
C O
N T
A C
T
S
H O
U
M
A D
E
D
I R
E C
T
T
H
A
T K
I N
S R
É A
L I S
T
H
C
U M
E N
T
M
U S
T
B
E
C O
M P
A R
I G
I N
P
R T
I F
I
I S
A
A P
P L I C
A B
L E
D
I N
S U
C
U R
A C
Y
O
F
T
F O
R M
A T
I O
N
C
O N
T A
I N
E D
T H
E R
E
R T
H
S U
A
N G
E
T
E R
A T
I O
M O
D I F
I C
A T
I O
V
E
B
E E
N
M
A D
E
T
O
T
C
U M
E N
T
N
O
R
E L I A
N C
E
S
H O
U
E
R
B
E
M A
C
U M
E N
T A
T I O
N
T
R A
N S
M I T
T E
D
O
R
R
E V
I E
W E
D
B
Y
C
O M
P U
T E
R
O
R
O
T H
E R
E L E
C T
R O
N
A
L E
R
M
P A
R E
D
T
O
T
I G
I N
A L
A
T K
I N
S R
É A
L I S
M A
K E
S
N
O
W
A R
R A
N T
I E
S
E
X P
R E
I M
P L I E
D
C
O N
C E
R N
I N
G
T
C
U R
A C
Y
O
F
T
H E
I N
F O
R M
A T
I
N T
A I N
C
U M
E
A N
S M
I T
T
V
I E
W
C O
M P
U T
O
T H
E
C T
R O
N
A
N S
DATE:
O R
I G
I N
S U
T
2725 JUDGE FRAN JAMIESON WAY
VIERA, FL 32940
2671 W. EAU GALLIE BLVD., SUITE 104
MELBOURNE, FL 32935
TEL. (321) 242-4942 | www.AtkinsRealis.com
ENGINEER OF RECORD:
FEET
0 300 600
D A
T E
D E
S C
R I P
T I O
N
D r a w i n g
N a m e
C
U s e r s B
R U
S O n e D r i v e
C o r p A t k i n s R é a l i s E a u
G a l l i e
M u c k
R e m o v a l
P r o j e c t
H a m m e r h e a d
D e s i g n
S e p t e m b e r C
D
R E
D G
E
T
E M
P L A
T
H
E
X I S
T I N
G
C
O N
D I T
I O
N S d t a m
E A
U
G
A L L
E
A
C
K
R
E M
O V
A L
C O
N S
T R
U C
T I O
N
D
R A
W I N
G S
D R
E D
M
P L A
C
T I O
N S
100087078
JRK
JRK
KMG
SMY
C-101
S. MARIE YARBROUGH
FL 70748
LEGEND
MAJOR CONTOUR
MINOR CONTOUR
PROPOSED
PIPELINE
DREDGE
BOUNDARY
MUCK THICKNESS
CONTOUR
*CONTOURS ARE BATHYMETRY/TOP
OF MUCK
Boundary
*SEE PAGE C-102 FOR INTERNAL
POINT COORDINATES
Point Table
Name
Northing
28.136997
28.136493
28.137002
28.136362
28.134541
28.135014
28.134960
28.135907
28.136430
28.136054
Easting
-80.610981
-80.610773
-80.609383
-80.609069
-80.614389
-80.614627
-80.614796
-80.615724
-80.614675
-80.613982
Point Table
Name
Northing
28.136430
28.136271
28.137288
28.136950
Easting
-80.614675
-80.614993
-80.615700
-80.614883
Point Table
Name
Northing
28.134042
28.135355
28.135607
28.134960
Easting
-80.617677
-80.618152
-80.615411
-80.614796
Point Table
Name
Northing
28.136712
28.136472
28.137645
28.138169
Easting
-80.611877
-80.612643
-80.613210
-80.611725
Point Table
Name
Northing
28.140083
28.138169
28.140018
Easting
-80.611524
-80.611725
-80.612558
Point Table
Name
Northing
28.137645
28.138169
28.140018
28.139832
28.139156
28.137689
28.137520
28.136974
28.137156
Easting
-80.613210
-80.611725
-80.612558
-80.615521
-80.614749
-80.614603
-80.613824
-80.613607
-80.612974
Point Table
Name
Northing
28.135907
28.136430
28.136054
28.136271
28.137288
28.136950
28.136472
28.139832
28.139156
28.137689
28.137520
28.136974
28.137156
28.137278
28.137971
28.139701
Easting
-80.615724
-80.614675
-80.613982
-80.614993
-80.615700
-80.614883
-80.612643
-80.615521
-80.614749
-80.614603
-80.613824
-80.613607
-80.612974
-80.617157
-80.616125
-80.617602
Point Table
Name
Northing
28.137278
28.138185
28.138143
Easting
-80.617157
-80.618106
-80.617444
Point Table
Name
Northing
28.139622
28.138496
28.137278
28.137971
28.139701
28.138185
28.138143
Easting
-80.618868
-80.618430
-80.617157
-80.616125
-80.617602
-80.618106
-80.617444
SHEET NO.
DESIGN:
APPROVED:
DRAWN:
JOB NO.:
CLIENT:
CHECKED:
2345678
N O
T I C
E
T H
E
I N
F O
R M
A T
I O
N
C
U M
E N
T
W
E
P A
R E
D
B
Y
A
T K
I N
S R
É A
L I S
I N
C
W
H I L E
A T
K I N
S R
É A
L
K
L
R
E A
S O
N A
B
E
A
S S
U R
E
T
C
U R
A C
Y
O
F
T
F O
R M
A T
I
N T
A I N
C
U M
E N
N
N
A R
A N
T
A T
C H
A N
G E
S
O
R
A
L T
E R
A T
I O
T
H
C
U M
E N
T
W
I
M
A D
E
B
Y
P
E R
S O
N S
O T
H
K
I N
S R
É A
L
R
S O
N N
T
C U
M E
A V
E
P O
S S
E S
S I O
N
O
F
A
T K
I N
S R
É A
L I S
C
H A
N G
A
L T
E R
A T
I O
S
A F
E T
Y
R
E L A
T E
D
A
S U
M
A
O
P E
R T
R S
O N
J U
A T
V E
R I F
I C
A T
I
F O
R M
A T
I
N T
A I N
C
U M
E
E
D E
D
C O
N T
A C
T
S
H O
U
M
A D
E
D
I R
E C
T
T
H
A
T K
I N
S R
É A
L I S
T
H
C
U M
E N
T
M
U S
T
B
E
C O
M P
A R
I G
I N
P
R T
I F
I
I S
A
A P
P L I C
A B
L E
D
I N
S U
C
U R
A C
Y
O
F
T
F O
R M
A T
I O
N
C
O N
T A
I N
E D
T H
E R
E
R T
H
S U
A
N G
E
T
E R
A T
I O
M O
D I F
I C
A T
I O
V
E
B
E E
N
M
A D
E
T
O
T
C
U M
E N
T
N
O
R
E L I A
N C
E
S
H O
U
E
R
B
E
M A
C
U M
E N
T A
T I O
N
T
R A
N S
M I T
T E
D
O
R
R
E V
I E
W E
D
B
Y
C
O M
P U
T E
R
O
R
O
T H
E R
E L E
C T
R O
N
A
L E
R
M
P A
R E
D
T
O
T
I G
I N
A L
A
T K
I N
S R
É A
L I S
M A
K E
S
N
O
W
A R
R A
N T
I E
S
E
X P
R E
I M
P L I E
D
C
O N
C E
R N
I N
G
T
C
U R
A C
Y
O
F
T
H E
I N
F O
R M
A T
I
N T
A I N
C
U M
E
A N
S M
I T
T
V
I E
W
C O
M P
U T
O
T H
E
C T
R O
N
A
N S
DATE:
O R
I G
I N
S U
T
2725 JUDGE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .