Remediation Services at Operable Units (OUs) 5 (Shore Road) and 6 (Morgan Francis) at the Raymark Superfund Site in Stratford, CT

Closed Solicitation Posted

Solicitation number
W912WJ25R0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
562910 Remediation Services

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers New England District is seeking a small business contractor to perform comprehensive environmental remediation services at the Raymark Superfund Site in Stratford, Connecticut. The solicitation (W912WJ25R0001) requires excavation and offsite disposal of approximately 10,000 cubic yards of contaminated soil from Operable Unit 5 (Shore Road) and 5,000 cubic yards of waste from an adjacent creek for Operable Unit 6 (Morgan Francis). Key contract requirements include constructing a RCRA hazardous waste landfill cap, implementing robust air monitoring and dust control practices, and restoring the site with extensive environmental protection measures. The evaluation will assess past performance, technical approach, and pricing, with specific attention to the contractor's ability to manage complex remediation in a residential area. Proposal responses were originally due December 13, 2024, with multiple amendments extending and adjusting submission requirements, and potential contractors were required to attend a mandatory site visit on November 13, 2024.

The contract is 100% set aside for small businesses with a total not-to-exceed value of $49 million and a guaranteed minimum of $10,000. The contract will be an Indefinite Delivery/Indefinite Quantity (IDIQ) agreement with a 5-year performance period, allowing for task order-based work execution. The primary place of performance is the 6-acre Morgan Francis property in Stratford, Connecticut, which will require extensive infrastructure development including stormwater basins, gas vent systems, utility corridors, and access roads. The remediation work involves constructing a RCRA cap with an average thickness of 4 feet, including a low permeability liner system and soil cover. Contractors must propose binding labor rates for the entire 5-year contract period and demonstrate capability to manage complex environmental remediation involving contaminated soils containing PCBs, metals, and asbestos in a densely populated residential area.

Notice text

3 versions

Update #3 · Latest ·

The proposed work is to remediate OU5 (Shore Road) and OU6 (Morgan Francis). The Raymark Superfund Site includes areas that have been contaminated as a result of manufacturing processes from the former Raymark facility. Specifically, contaminated waste material was used as fill in various locations within the Town of Stratford, CT. The OU5 remediation requires the excavation and offsite disposal of approximately 10,000 cubic yards of contaminated soil (primarily PCBs, metals, and Asbestos) and site restoration. The OU5 property is in the vicinity of Shore Road and the Housatonic Boat Club. OU6 (Morgan Francis) property was a historically low-lying area that was filled with Raymark waste. The remediation for that property requires the excavation of approximately 5,000 cubic yards of waste from an adjacent creek, restoration, consolidation of that waste on the Morgan Francis Property, and construction of a Resource Conservation and Recovery Act (RCRA) hazardous waste landfill cap and supporting infrastructure. The area of the Morgan Francis site to be capped is approximately 6 acres. The to-be-constructed RCRA cap will have an average thickness of 4 feet and will consist of a low permeability liner system with soil cover. The Site abuts a residential area of town and, as such, there are significant air monitoring, dust control, traffic management, and public safety requirements as part of this project. This project has the following major components: Remediation, including excavation, and restoration of OU5; Remediation, including excavation, and restoration of a section of creek adjacent to Morgan Francis; RCRA cap constructed per design and specifications; Supporting infrastructure, including but not limited to, storm-water basins, swales, gas vent system, utility corridors, access roads; Robust air monitoring and dust prevention practices.

Update #2 ·

The proposed work is to remediate OU5 (Shore Road) and OU6 (Morgan Francis). The Raymark Superfund Site includes areas that have been contaminated as a result of manufacturing processes from the former Raymark facility. Specifically, contaminated waste material was used as fill in various locations within the Town of Stratford, CT. The OU5 remediation requires the excavation and offsite disposal of approximately 10,000 cubic yards of contaminated soil (primarily PCBs, metals, and Asbestos) and site restoration. The OU5 property is in the vicinity of Shore Road and the Housatonic Boat Club. OU6 (Morgan Francis) property was a historically low-lying area that was filled with Raymark waste. The remediation for that property requires the excavation of approximately 5,000 cubic yards of waste from an adjacent creek, restoration, consolidation of that waste on the Morgan Francis Property, and construction of a Resource Conservation and Recovery Act (RCRA) hazardous waste landfill cap and supporting infrastructure. The area of the Morgan Francis site to be capped is approximately 6 acres. The to-be-constructed RCRA cap will have an average thickness of 4 feet and will consist of a low permeability liner system with soil cover. The Site abuts a residential area of town and, as such, there are significant air monitoring, dust control, traffic management, and public safety requirements as part of this project. This project has the following major components: Remediation, including excavation, and restoration of OU5; Remediation, including excavation, and restoration of a section of creek adjacent to Morgan Francis; RCRA cap constructed per design and specifications; Supporting infrastructure, including but not limited to, storm-water basins, swales, gas vent system, utility corridors, access roads; Robust air monitoring and dust prevention practices.

Update #1 ·

The proposed work is to remediate OU5 (Shore Road) and OU6 (Morgan Francis). The Raymark Superfund Site includes areas that have been contaminated as a result of manufacturing processes from the former Raymark facility. Specifically, contaminated waste material was used as fill in various locations within the Town of Stratford, CT. The OU5 remediation requires the excavation and offsite disposal of approximately 10,000 cubic yards of contaminated soil (primarily PCBs, metals, and Asbestos) and site restoration. The OU5 property is in the vicinity of Shore Road and the Housatonic Boat Club. OU6 (Morgan Francis) property was a historically low-lying area that was filled with Raymark waste. The remediation for that property requires the excavation of approximately 5,000 cubic yards of waste from an adjacent creek, restoration, consolidation of that waste on the Morgan Francis Property, and construction of a Resource Conservation and Recovery Act (RCRA) hazardous waste landfill cap and supporting infrastructure. The area of the Morgan Francis site to be capped is approximately 6 acres. The to-be-constructed RCRA cap will have an average thickness of 4 feet and will consist of a low permeability liner system with soil cover. The Site abuts a residential area of town and, as such, there are significant air monitoring, dust control, traffic management, and public safety requirements as part of this project.

This project has the following major components:

Remediation, including excavation, and restoration of OU5

Remediation, including excavation, and restoration of a section of creek adjacent to Morgan Francis

RCRA cap constructed per design and specifications

Supporting infrastructure, including but not limited to, storm-water basins, swales, gas vent system, utility corridors, access roads

Robust air monitoring and dust prevention practices.

Files

File Type Posted
Amendment 0010.pdf PDF
Amendment 0009 - Revised Binding Rates Table.xlsx XLSX spreadsheet
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Spec Section 01 35 29 Revision 2.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 20.pdf PDF
Amendment 0006 - Drawing C-106 Revision 2.pdf PDF
Amendment 0006.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 00.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - Revised Seed Task Order PWS.pdf PDF
Amendment 0004 - Final Raymark PDI Report.pdf PDF
Amendment 0004 - Past Performance Questionnaire.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - Updated Bid Schedule.pdf PDF
Amendment 0004 - Revised Drawing C-106.pdf PDF
Amendment 0004 - Revised Spec Section 01 35 29.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 1 of 3).pdf PDF
Amendment 0004 - OU6 Final Remedial Investigation Report (Vol 1 and 2).pdf PDF
Amendment 0004 - WSP Raymark MF SIR.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 2 of 3).pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Site Visit Map.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Bid Schedule.docx DOCX document
Specifications.pdf PDF
W912WJ25R0001.pdf PDF
Drawings.pdf PDF
Binding Rates Table.xlsx XLSX spreadsheet
PWS - IDIQ.pdf PDF
PWS - Seed Task Order.pdf PDF
Show all 33

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors