Remediation and Restoration Activities
Cancelled Solicitation Posted
- Solicitation number
- 6913G627Q300002
- Agency
-
Immediate Office of the Secretary of Transportation
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- F999 Other Environmental Services
- Place of performance
- Matawan, New Jersey 07747, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Volpe National Transportation Systems Center, under an interagency agreement with the Department of Transportation, is soliciting remedial action services on behalf of the Federal Aviation Administration (FAA) Facilities Environmental Cleanup Program, with proposals due November 23, 2026 at 1:00 PM Eastern. The procurement is a Total Small Business set-aside, and the Set Aside line governs eligibility.
Place of performance is the QPI RCAG facility in Matawan, New Jersey. Deliverables and administration run through Volpe at 220 Binney Street, Cambridge, MA 02142-1001. The contractor must excavate approximately 4,800 square feet of lead- and PCB-contaminated soil to 1.5 feet below ground surface, plus one 10-by-10-foot hot spot to 2 feet, with an estimated maximum of 300 cubic yards. Contaminated soil is live-loaded for off-site disposal at government-approved facilities selected by a Licensed Site Remediation Professional. The contractor performs waste characterization sampling and disposal documentation, then restores the site with approved clean fill compacted to original grade.
The draft Remediation and Restoration Work Plan, covering technical approach, schedule, Site Safety and Health Plan, and Risk Management Plan, is due within ten business days of kick-off. The government reviews it for five business days, and the final plan is due five business days after comments. Site close-out email and all disposal manifests are due within ten business days of demobilization or five business days after receipt of disposal paperwork. The period of performance runs from notice to proceed through May 31, 2027, with work Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays. A Service Contract Act wage determination (Monmouth and Ocean counties, Revision 34, effective August 12, 2026) applies.
Pricing is a firm-fixed-price single line item, CLIN 00100, quantity one. The price must be all-inclusive, covering work planning, remediation, restoration, site closeout, laboratory analysis, survey, equipment rentals, trucking, disposal, permits, and all travel. Proposals require the SAM UEI on the cover page, SF-1449, pricing backup, a two-page technical narrative for CLIN 00100, schedule information, and past performance documentation, submitted by email to Roland Regan (Contracting Officer). The Contracting Officer's Representative is Michelle Heimgartner. Questions are due November 16, 2026 at 1:00 PM Eastern.
Award is best value, with price weighted most heavily, followed by schedule, technical explanation, and past performance, in descending order of importance. Offerors must provide representations on Buy American, Iran sanctions, Sudan restrictions, and covered telecommunications equipment, with disclosure within 72 hours of discovering any non-compliant product or service. The government does not pay proposal preparation costs.
Notice text
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination.
The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°, -74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work.
Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg.
See SOW for greater details.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Remediation, Gasoline Underground Storage Tank Putah Creek | — | No set-aside | |
| F108--Contaminated Soil Disposal | Veterans Integrated Service Network 22 | Service-Disabled Veteran-Owned Small Business | |
| Arizona-nevada group optimized remediation contract | ENDIST Los Angeles | Total Small Business | |
| Construction-NUWCDIVNPT-Interior Renovations | Naval Sea Systems Command | Total Small Business | |
| Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) | ENDIST Mobile | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity