This document is an Amendment to a federal solicitation for remediation services at the Raymark Superfund Site in Stratford, Connecticut. The amendment provides a map and updated list of locations for a site visit scheduled on November 13, 2024. The overall contract is a single-award, indefinite-delivery, indefinite-quantity (IDIQ) Remedial Action Contract (RAC) with a total not-to-exceed value of $49 million. Work will be issued through negotiated firm-fixed-price task orders. The contract is 100% set-aside for small businesses. Key requirements include the remediation of Operable Units 5 and 6, including excavation and off-site disposal of contaminated soil, creek restoration, and construction of a RCRA hazardous waste landfill cap. The contract period shall not exceed 5 years. Offerors must propose binding labor rates for the full 5-year term and are advised of potential wage determination updates. Interested offerors are required to attend the site visit and acknowledge any conflicts of interest related to prior work at the Raymark site.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - Revised Binding Rates Table.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Spec Section 01 35 29 Revision 2.pdf PDF
Amendment 0006 - Drawing C-106 Revision 2.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 20.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 00.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 1 of 3).pdf PDF
Amendment 0004 - Revised Spec Section 01 35 29.pdf PDF
Amendment 0004 - Revised Seed Task Order PWS.pdf PDF
Amendment 0004 - Final Raymark PDI Report.pdf PDF
Amendment 0004 - Past Performance Questionnaire.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - Revised Drawing C-106.pdf PDF
Amendment 0004 - Updated Bid Schedule.pdf PDF
Amendment 0004 - OU6 Final Remedial Investigation Report (Vol 1 and 2).pdf PDF
Amendment 0004 - WSP Raymark MF SIR.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 2 of 3).pdf PDF
Amendment 0003 - Site Visit Map.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Drawings.pdf PDF
Bid Schedule.docx DOCX document
W912WJ25R0001.pdf PDF
Specifications.pdf PDF
PWS - IDIQ.pdf PDF
Binding Rates Table.xlsx XLSX spreadsheet
PWS - Seed Task Order.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is necessary to provide a map and updated list of location addresses for the site visit scheduled for 13 November 2024. All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Nov-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ25R0001

X 9B. DATED (SEE ITEM 11)

30-Oct-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Nov-2024

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ25R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

IDIQ INFORMATION

1. This contract is a Single Award Indefinite Delivery Indefinite Quantity (IDIQ) Remedial Action Contract (RAC) for the Raymark Superfund Site in Stratford, Connecticut. Task orders will be issued on a firm‐fixed‐price basis.

Small Business Set-Aside: The contract is set‐aside 100% for small business concerns.

2. Pricing of Task Orders: After award of the base contract, work will be issued through negotiated task orders on a firm fixed price basis. Specific task and pricing information for work to be performed under this contract shall be included in each negotiated task order. Cost or pricing data may be required in subsequent task orders pursuant to Contract Clause 52.215‐20 (Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data).

3. Contract Amount: The total amount of task orders awarded and follow‐on modifications to those task orders, under this solicitation, shall not exceed $49M. The Government is obligated to satisfy a minimum guaranteed amount of not less than $10,000. Task order limitation are as defined in FAR 52.216‐19 (Ordering Limitations) in Section I – Contract Clauses.

4. The Seed Task Order will be awarded concurrently with that base IDIQ contract award.

5. Contract Period: The contract duration shall not exceed the 5 year ordering period.

6. Wage Determinations and Binding Labor Rates: The contract awardee will be required to pay wages in accordance with the applicable wage determinations listed in Section J, as updated. Task order and modification requests for proposal (RFPs) and subsequent awards will include updated wage determinations in compliance with Department of Labor regulations.The contract awardee will also be required to propose pricing on task orders that is consistent with its proposed binding rates, submitted as required by Section L of this solicitation. Binding rates will be incorporated into the negotiated contract, and all task order and modification proposals must use the binding rates. The offeror is required to propose five years of binding rates, inclusive of all escalation. Offerors should anticipate possible updates to wage determinations when proposing binding rates for all five years of the contract.

No adjustment will be made to binding rates after contract award.

7. All clauses, not specifically associated with a specific type of line item, will apply to all line items on the contract.

8. Potential Conflicts of Interest: If an offeror has an organizational conflict of interest that cannot be avoided, minimized or mitigated, the contract award will be withheld from the apparent successful offeror.

9. If an offeror or proposed Team Member currently provides, or has provided services within the past 10 years at the Raymark Superfund Site, such offeror must provide the Government with a statement that identifies the current or past work or affiliation, when it occurred, and substance of the work sufficient to allow the Government to determine if an organizational conflict of interest exists. If the offeror has an organizational conflict of interest, it should also present its plan to avoid, minimize or mitigate the conflict: such plan would be considered part of the offeror’s proposal.

W912WJ25R0001

10. Offerors who have had no past affiliation with, or who have performed no work within the past 10 years at the Raymark Superfund Site must furnish a certificate from an officer of the Offeror (such as President, Vice President, Managing Member of LLC, Owner) to that effect. The statement or certification should be submitted as a separate document along with, but not included in, either volume of the offeror’s proposal. An Offeror that fails to provide either statement or certification, as applicable, may be deemed non-responsible and the proposal will be rejected. The procedure for reviewing any organizational conflict of interest will be in accordance with FAR Part 9.5 et seq.

11. Offerors MUST have an active registration in SAM.gov at the date/time of the solicitation closing in accordance with FAR 52.204-7(b)(1). This includes Joint Venture and partnership offerors.

12. Offerors providing less than 100 days for acceptance will be rejected and will not be reviewed.

13. To ensure timely award of this requirement all Requests for Information must be submitted prior to 22 November 2024.

SITE VISIT INFORMATION

Offerors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

An organized site visit is scheduled as follows:

1:00 PM – 3:00 PM ET on 13 November 2024

High visibility vests and boots or other appropriate footwear should be worn, as locations may have difficult terrain, sharps, etc.

Carpool where possible, as parking may be challenging.

The site visit will include the following locations:

300 Ferry Boulevard, Stratford, CT 06615 51 Shore Road, Stratford, CT 00615 Shakespeare Park behind 1850 Elm Street, Stratford, CT 00615

Parties shall meet at the Raymark Project Office, 300 Ferry Blvd., Stratford, CT 00615.

(End of Summary of Changes)