About this file

This is an engineering drawing (C-106) showing an Excavation and Consolidation Plan for the Raymark Superfund Site remediation project. The drawing details the Morgan Francis excavation area with various depths (1-foot to 4-foot) and includes sanitary sewer profiles and storm drain configurations.

The drawing contains specific technical elements including pre-excavation soil sampling areas, bottom of excavation specifications, and limits of consolidation. Key features include a sheet pile hydraulic control wall to be removed during remediation (40' wide by 15' embedment depth, 24" stick up, A-328 steel), storm drain pipe locations, and multiple soil sampling areas with specific requirements detailed in notes 1-6. The drawing also includes a remediation legend distinguishing different excavation zones and depths. The plan shows integration with existing infrastructure including East Broadway and various utility connections, with particular attention to protecting an existing sanitary sewer during excavation activities.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 - Revised Binding Rates Table.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - Spec Section 01 35 29 Revision 2.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 20.pdf PDF
Amendment 0006 - Revised Spec Section 31 23 00.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 1 of 3).pdf PDF
Amendment 0004 - Revised Spec Section 01 35 29.pdf PDF
Amendment 0004 - Revised Seed Task Order PWS.pdf PDF
Amendment 0004 - Final Raymark PDI Report.pdf PDF
Amendment 0004 - Past Performance Questionnaire.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - Revised Drawing C-106.pdf PDF
Amendment 0004 - Updated Bid Schedule.pdf PDF
Amendment 0004 - OU6 Final Remedial Investigation Report (Vol 1 and 2).pdf PDF
Amendment 0004 - WSP Raymark MF SIR.pdf PDF
Amendment 0004 - OU3 Remedial Investigation Report (Vol 2 of 3).pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Site Visit Map.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Drawings.pdf PDF
Bid Schedule.docx DOCX document
W912WJ25R0001.pdf PDF
Specifications.pdf PDF
PWS - IDIQ.pdf PDF
Binding Rates Table.xlsx XLSX spreadsheet
PWS - Seed Task Order.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

48-INCH RCP SAN SEWER

C-106

EX

C

AV

AT

IO

N

PL

AN

TD

D

TD

D

M

AP

JK AN

SI

D C

-1

C

AP

S U

BG

R

AD

E

PL

AN

/2

8/

W

2W J2

2F

W

2W J-

-D

-0

C -1

A

P R

O G

R

ES

S R

EM

ED

IA

L

D

ES

IG

N

S U

BM

IT

TA

L

/1

8/

M

AP

B

D

ES

IG

N S

U

BM

IT

TA

L 3/

/2

M

AP

C

0% D

ES

IG

N S

U

BM

IT

TA

L

/0 4/

M

AP

D

FI

N

AL

D

ES

IG

N

D R

AW

IN

G S

U

BM

IT

TA

L 8/

/2

M

AP

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

D

ES

IG

N

ED

B

Y:

D

2 3

C

4 5

A

B

R

EV

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

D

AT

E

AP

PR

SHEET OF

US Army Corps of Engineers New England District

U

SA

C E

N

EW

E N

G

LA

N D

D

IS

TR

IC

T C

O N

C O

R D

, M A

FILE NAME: C:\Users\USTD715079\OneDrive - WSP O365\USACE - Raymark Francis Morgan\Sheets\C-106 Excavation and Consolidation Plan.dwg PLOT DATE: Fri, 06 Sep 2024 PLOT TIME: 12:11 PM

D R

AW

IN

G S

TA

TU

S

PE

R C

EN

T

R

EM

ED

IA

L D

ES

IG

N C

H

EC

KE

D

B Y:

R

AY

M

AR

K

IN

D U

ST

R

IE

S

SU

PE

R

FU

N D

S

IT

E M

O R

G

AN

F R

AN

C

IS

C

O N

SO

LI

D

AT

IO

N

A R

EA

C

AP

(O

U 6)

ST

R

AT

FO

R D

, C O

N N

EC

TI

C U

T

SHEET

IDENTIFICATION

R

EM

ED

IA

TI

O

N (0

U 3)

AN

D

U

PP

ER

U

PP

ER

F

ER

R Y

C R

EE

K

E6EPGMSL

Line

E6EPGMSL

Callout Approximate location of sheet pile hydraulic control weir (NTS) to be removed during remediation. 40' wide by 15' embedment depth, 24" stick up, A-328 steel.

E6EDGRNM

Line

E6EPGMSL

Callout Soil Borings

Untitled

File details come from the government source that posted it. Updated .