This is Section 01 35 29 of the technical specifications detailing health, safety, and emergency response procedures for contaminated sites at the Raymark Superfund Site remediation project in Stratford, CT.
The section outlines comprehensive safety requirements for working with hazardous materials, including: development of an Accident Prevention Plan/Site Safety and Health Plan (APP/SSHP); establishment of work zones (Exclusion Zone, Contamination Reduction Zone, Support Zone); personal protective equipment requirements; air monitoring and sampling procedures with specific dust action levels (150 μg/m3 for clean material); decontamination procedures for personnel and equipment; training requirements (40 hours HTRW instruction plus 3 days field experience); medical surveillance program requirements; and emergency response procedures. Key provisions include continuous perimeter air monitoring at three locations, with more stringent controls when handling contaminated Raymark Waste containing PCBs, asbestos and metals. The contractor must provide PPE for government personnel, maintain detailed site control logs, and submit regular safety inspection reports and a final safety phase-out report.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Morgan Francis Remediation, Raymark Superfund Site, Stratford, CT
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 29
HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES
PART 1 GENERAL
1.1 REFERENCES
1.2 PRECONSTRUCTION SAFETY CONFERENCE
1.3 SUBMITTALS
1.4 ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN (APP/SSHP)
1.4.1 Acceptance and Modifications
1.4.2 Availability
1.5 STAFF ORGANIZATION, QUALIFICATION AND RESPONSIBILITIES
1.6 EMERGENCY RESPONSE AND CONTINGENCY PROCEDURES
1.7 CERTIFICATE OF WORKER/VISITOR ACKNOWLEDGEMENT
1.8 INSPECTIONS
1.9 SAFETY AND HEALTH PHASE-OUT REPORT
PART 2 PRODUCTS
2.1 PERSONAL PROTECTIVE EQUIPMENT
2.1.1 Site Specific PPE Program
2.1.2 Levels of Protection
2.1.3 PPE for Government Personnel
2.2 EMERGENCY EQUIPMENT AND FIRST AID REQUIREMENTS
PART 3 EXECUTION
3.1 SITE DESCRIPTION AND CONTAMINATION CHARACTERIZATION
3.1.1 Project/Site Conditions
3.1.1.1 CERCLA Documents
3.1.1.2 RCRA Documents
3.2 TRAINING
3.2.1 General HTRW Operations Training
3.2.2 Pre-Entry Briefing
3.2.3 Periodic Sessions
3.3 MEDICAL SURVEILLANCE PROGRAM
3.4 EXPOSURE MONITORING/AIR SAMPLING PROGRAM
3.5 HEAT STRESS MONITORING AND MANAGEMENT
3.6 SPILL AND DISCHARGE CONTROL
3.7 MATERIALS TRANSFER SAFETY
3.8 SITE CONTROL MEASURES
3.8.1 Work Zones
3.8.1.1 Exclusion Zone (EZ)
3.8.1.2 Contamination Reduction Zone (CRZ)
3.8.1.3 Support Zone (SZ)
3.8.2 Site Control Log
3.8.3 Communication
3.8.4 Site Security
3.9 PERSONAL HYGIENE AND DECONTAMINATION
SECTION 01 35 29 Page 1
3.9.1 Decontamination Facilities
3.9.2 Personnel Decontamination
3.9.3 Equipment Decontamination
3.9.3.1 Facilities for Equipment and Personnel
3.9.3.2 Procedures
-- End of Section Table of Contents --
SECTION 01 35 29 Page 2
SECTION 01 35 29
HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN PETROLEUM INSTITUTE (API)
API RP 2219 (2016) Safe Operation of Vacuum Trucks Handling Flammable and Combustible Liquids in Petroleum Service
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z358.1 (2014) American National Standard for Emergency Eyewash and Shower Equipment
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH 85-115 (1985) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.120 Hazardous Waste Operations and Emergency Response
29 CFR 1926.65 Hazardous Waste Operations and Emergency Response
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
1.2 PRECONSTRUCTION SAFETY CONFERENCE
Conduct a preconstruction safety conference prior to the start of site
SECTION 01 35 29 Page 3 activities and after submission of the Accident Prevention Plan/Site Safety And Health Plan (APP/SSHP). The objective of the meeting is to discuss health and safety concerns related to the impending work, discuss project health and safety organization and expectations, review and answer comments and concerns regarding the APP/SSHP or other health and safety concerns. Ensure that those individuals responsible for health and safety at the project level are available and attend this meeting.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Work Zones ; G, RO Decontamination Facilities ; G, RO
SD-03 Product Data
Amendments to the APP/SSHP Exposure Monitoring/Air Sampling Program Site Control Log SSHO's Daily Inspection Logs
SD-07 Certificates
Certificate Of Worker/Visitor Acknowledgement
SD-11 Closeout Submittals
Safety And Health Phase-Out Report
1.4 ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN (APP/SSHP)
Develop and implement a Site Safety and Health Plan in accordance with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, and attach to the Accident Prevention Plan (APP) as an appendix (APP/SSHP). Address all occupational safety and health hazards (traditional construction as well as contaminant-related hazards) associated with cleanup operations within the APP/SSHP. Cover each SSHP element in EM 385-1-1 and each APP element in EM 385-1-1 . SSHP elements that overlap with the APP need not be duplicated. Such elements can be referenced to the appropriate section of the APP which adequately addresses the safety and occupational health topic. The APP/SSHP is a dynamic document, subject to change as project operations/execution change. Modify the APP/SSHP to address changing and previously unidentified health and safety conditions. Ensure that the APP/SSHP is updated accordingly. Submit amendments to the APP/SSHP to the Contracting Officer as the APP/SSHP is updated. For long duration projects resubmit the APP/SSHP to the Contracting Officer annually for review. The APP/SSHP must contain all updates.
SECTION 01 35 29 Page 4
1.4.1 Acceptance and Modifications
Prior to submittal, the APP/SSHP must be signed and dated by the Safety and Health Manager and the Site Superintendent. Submit for review 21 days prior to the Preconstruction Safety Conference. Deficiencies in the APP/SSHP will be discussed at the preconstruction safety conference, and must be revised to correct the deficiencies and resubmitted for acceptance. Onsite work must not begin until the plan has been accepted.
Maintain a copy of the written APP/SSHP onsite. Changes and modifications to the APP/SSHP must be made with the knowledge and concurrence of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer. Bring to the attention of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer any unforeseen hazard that becomes evident during the performance of the work, through the Site Safety and Health Officer (SSHO) for resolution as soon as possible. In the interim, take necessary action to re-establish and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public, and the environment. Disregard for the provisions of this specification or the accepted APP/SSHP is cause for stopping work until the matter has been rectified.
1.4.2 Availability
Make available the APP/SSHP in accordance with 29 CFR 1910.120 , (b)(1)(v) and 29 CFR 1926.65 , (b)(1)(v).
1.5 STAFF ORGANIZATION, QUALIFICATION AND RESPONSIBILITIES
See Paragraph 1.6, "SITE QUALIFICATIONS, DUTIES AND MEETINGS" in Section 01 35 26.
1.6 EMERGENCY RESPONSE AND CONTINGENCY PROCEDURES
REFERENCE 01 35 26, paragraph 1.12.
1.7 CERTIFICATE OF WORKER/VISITOR ACKNOWLEDGEMENT
A copy of a certificate of worker/visitor acknowledgement must be completed and submitted for each visitor allowed to enter contamination reduction or exclusion zones, and for each employee.
1.8 INSPECTIONS
Attach to and submit with the Daily Quality Control reports the SSHO's Daily Inspection Logs . Include with each entry the following: date, work area checked, employees present in work area, PPE and work equipment being used in each area, special SOH issues and notes, and signature of preparer. Additionally, all inspections as required by EM 385-1-1 shall be included in the Daily Inspection Logs.
1.9 SAFETY AND HEALTH PHASE-OUT REPORT
Submit a Safety and Health Phase-Out Report in conjunction with the project close out report, prior to final acceptance of the work. Include the following minimum information :
a. Summary of the overall performance of SOH (e.g., accidents or incidents including near misses, unusual events, lessons learned).
SECTION 01 35 29 Page 5
b. Final decontamination documentation including procedures and techniques used to decontaminate equipment, vehicles, and on site facilities.
c. Summary of exposure monitoring and air sampling accomplished during the project.
d. Signatures of Safety and Health Manager and SSHO.
PART 2 PRODUCTS
2.1 PERSONAL PROTECTIVE EQUIPMENT
2.1.1 Site Specific PPE Program
Provide onsite personnel exposed to contaminants with appropriate personal protective equipment. Components of levels of protection (B, C, D and modifications) must be relevant to site-specific conditions, including heat and cold stress potential and safety hazards. Use only respirators approved by NIOSH.
Keep protective equipment and clothing clean and well maintained. Include site-specific procedures to determine PPE program effectiveness and for onsite fit-testing of respirators, cleaning, maintenance, inspection, cartridge change out, and storage of PPE within the PPE section of the
APP/SSHP.
2.1.2 Levels of Protection
The Safety and Health Manager must establish and evaluate as the work progresses the levels of protection for each work activity. Also establish action levels for upgrade or downgrade in levels of PPE. Describe in the SSHP the protocols and the communication network for changing the level of protection. Address air monitoring results, potential for exposure, changes in site conditions, work phases, job tasks, weather, temperature extremes, and individual medical considerations within the PPE evaluation protocol.
2.1.3 PPE for Government Personnel
For use by USACE personnel or official visitors, provide personal protective equipment (PPE), excluding air-purifying negative-pressure respirators and safety shoes which will be provided by individuals, as required for entry into the Exclusion Zone and Contamination Reduction Zone. The PPE items shall be stored in the Support Zone and shall be readily available to Government personnel. Provide basic training in the use and limitations of the PPE provided. Assuming that the Contractor uses disposable PPE, the quantity shall be based on two sets of PPE for two personnel per active work day.
2.2 EMERGENCY EQUIPMENT AND FIRST AID REQUIREMENTS
Maintain, as a minimum, the following items onsite and available for immediate use:
a. First aid equipment and supplies approved by the consulting physician.
b. Emergency eyewashes and showers that comply with ANSI/ISEA Z358.1 .
SECTION 01 35 29 Page 6
c. Provide fire extinguishers of sufficient size and type at site facilities and in all vehicles and at any other site locations where flammable or combustible materials present a fire risk.
PART 3 EXECUTION
3.1 SITE DESCRIPTION AND CONTAMINATION CHARACTERIZATION
3.1.1 Project/Site Conditions
The Raymark Superfund Site falls under the scope of 29 CFR 1910 , Section .120, "Hazardous Waste Operations and Emergency Response". Due to the presence of high concentrations of several contaminants, including polychlorinated biphenyls (PCBs), asbestos and metals, there is a need to ensure those individuals involved in the project, the public, and the environment are protected. The training, practices, and procedures required by 29 CFR 1910 , Section .120 will ensure that the objectives are met. The contractor will ensure that requirements of 29 CFR 1910 , Section .120 are implemented by all involved in the project.
The contractor may encounter contamination during this project. See contamination data in the description of work in SECTION 01 11 00 SUMMARY OF WORK, and appended at the end of the same section.
Refer to the following reports and information for the site description and contamination characterization.
3.1.1.1 CERCLA Documents
Available upon request.
3.1.1.2 RCRA Documents
Available upon request.
3.2 TRAINING
In conjunction with EM 385-1-1 , meet the training program requirements for workers performing cleanup operations and who will be exposed to contaminants.
3.2.1 General HTRW Operations Training
All Personnel performing duties with potential for exposure to onsite contaminants must meet and maintain the following 29 CFR 1910.120 / 29 CFR 1926.65 (e) training requirements:
a. 40 hours of off site HTRW instruction.
b. 3 days actual on-the-job field experience under the direct supervision of a trained, experienced supervisor.
c. 8 hours refresher training annually.
Onsite supervisors must have an additional 8 hours management and supervisor training specified in 29 CFR 1910.120 / 29 CFR 1926.65 (e) (4).
SECTION 01 35 29 Page 7
3.2.2 Pre-Entry Briefing
Prior to commencement of onsite field activities, all site employees, including those assigned only to the Support Zone, must attend a site-specific SOH training session. This session will be conducted by the Safety and Health Manager and the Site Safety and Health Officer to ensure that all personnel are familiar with requirements and responsibilities for maintaining a safe and healthful work environment. Thoroughly discuss procedures and contents of the accepted APP/SSHP and of EM 385-1-1 . Each employee must sign a training log to acknowledge attendance and understanding of the training. Notify the Contracting Officer at least 5 days prior to the initial site-specific training session so government personnel involved in the project may attend.
3.2.3 Periodic Sessions
Conduct periodic onsite training by the SSHO at least weekly for personnel assigned to work at the site during the following week. Address SOH procedures, work practices, any changes in the APP/SSHP, activity hazard analyses, work tasks, or schedule; results of previous week's air monitoring, review of safety discrepancies and accidents. Convene a meeting prior to implementation of the change should an operational change affecting onsite field work be made, to explain SOH procedures. Conduct a site-specific training sessions for new personnel, visitors, and suppliers by the SSHO using the training curriculum outlines developed by the Safety and Health Manager. Each employee must sign a training log to acknowledge attendance and understanding of the training.
3.3 MEDICAL SURVEILLANCE PROGRAM
Meet all requirements of 29 CFR 1910.120 / 29 CFR 1926.65 medical surveillance program and EM 385-1-1 for workers performing cleanup operations and who will be exposed to contaminants. Ensure the Occupational Physician or the physician's designee performs the physical examinations and reviews examination results. Participation in the medical surveillance program is without cost to the employee, without loss of pay and at a reasonable time and place.
3.4 EXPOSURE MONITORING/AIR SAMPLING PROGRAM
The Safety and Health Manager shall prepare and implement an exposure monitoring/air sampling program to identify and quantify SOH hazards and airborne levels of hazardous substances in order to assure proper selection of engineering controls, work practices and personal protective equipment for affected site personnel including development of a Perimeter Air Monitoring Plan (PAMP) documenting these procedures. Include action levels for upgrading/downgrading PPE in the program.
Work area perimeter and personnel exposure sample results shall be reviewed and signed by the Safety and Health Manager and submitted to USACE COR within 24-hours after receipt.
The Contractor shall conduct dust monitoring in the work zone and at the work area perimeter during activities that have the potential to disturb soil, both contaminated material and clean material. When handling clean material, the dust action level for the work area perimeter shall be set at 150 micrograms per cubic meter (ug/m3), in accordance with the National Ambient Air Quality Standard.
SECTION 01 35 29 Page 8
Perimeter air sampling will occur at a minimum of three perimeter air monitoring locations which will be based on the area being worked and wind direction. Perimeter air monitoring locations shall be agreed upon by the
USACE COR.
When handling clean material, if the ambient air concentration of PM10 at the downwind perimeter of the work area, or nearest occupied building, exceeds 100 ?g/m3 above the previously established background (upwind) concentration, or if airborne dust is observed leaving the work area, dust suppression techniques will be employed. Work utilizing dust suppression techniques will continue provided the downwind PM10 concentration does not exceed 150 ?g/m3 above the background (upwind) concentration. If, after implementation of dust suppression techniques, the downwind PM10 concentration is greater than 150 ?g/m3 above the background (upwind) concentration, work will be stopped, and activities will be re-evaluated.
During intrusive remedial activities when handling contaminated Raymark Waste, a site-specific real-time Dust Action Level (DAL) be used to control fugitive dust emissions. The DAL will be calculated for Morgan Francis and OU3 by utilizing the EPA Regional Screening Levels (RSLs) for soil and average soil concentrations for the constituents of concern at each site. Average soil concentrations for each site will be provided to the contractor by USACE.
Real-time work area perimeter monitoring shall be performed using the MIE DR4000 monitors or equivalent placed in weather proofed cases. These instruments shall be set to automatically store data for subsequent retrieval.
Time-Weighted Average monitoring shall be conducted daily at each of the perimeter air monitoring stations when intrusive remediation activities are performed. Monitoring for the indicator chemicals, to include lead, copper, and asbestos fibers, shall be performed in order to verify that concentrations at the perimeter locations are within recommended guidelines. If analytical results for the dust are found to be equal to or greater than the action level for asbestos, Transmission Electron Microscopy (TEM) analysis will be performed to verify the presence or absence of asbestos fibers.
3.5 HEAT STRESS MONITORING AND MANAGEMENT
Document in the APP/SSHP and implement the procedures and practices in EM 385-1-1 to monitor and manage heat stress.
3.6 SPILL AND DISCHARGE CONTROL
Develop and implement written spill and discharge containment/control procedures. Address laboratory waste packs, material handling equipment, as well as drum and container handling, opening, sampling, shipping and transport. Describe prevention measures, such as building berms or dikes;
spill control measures and material to be used (e.g. booms, vermiculite);
location of the spill control material; personal protective equipment required to cleanup spills; disposal of contaminated material; and who is responsible to report the spill. Storage of contaminated material or hazardous materials must be appropriately bermed, diked and contained to prevent any spillage of material on uncontaminated soil. If the spill or discharge is reportable, or human health or the environment are threatened, notify the National Response Center, the state, and the
SECTION 01 35 29 Page 9
E6EDGRNM
Callout PCBs
E6EDGRNM
Callout Samples for lead, copper, and asbestos fibers will be submitted for analysis on a two day turn around time.
Contracting Officer as soon as possible. Provide control as required by Section 01 57 19 ENVIRONMENTAL PROTECTION.
3.7 MATERIALS TRANSFER SAFETY
Remove liquids and residues from the tanks using explosion-proof or air-driven pumps. In accordance with EM 385-1-1 , electrically bond the tank and ground pump motors and suction hoses to prevent electrostatic ignition hazards. Use of a hand pump will be permitted to remove the last of the liquid from the bottom of the tanks. If a vacuum truck is used for removal of liquids or residues, the area of operation for the vacuum truck must be vapor free. locate the truck upwind from the tank and outside the path of probable vapor travel. Discharge the vacuum pump exhaust gases through a hose of adequate size and length downwind of the truck and tank area. Vacuum truck operating and safety practices must conform to API RP 2219 . Collect tank residues in drums, tanks, or tank trucks labeled according to 49 CFR 171 and 49 CFR 172 and disposed of as specified.
Disconnect and drain fittings and lines of their contents after the materials have been transferred and the tanks have been exposed. Do not spill contents into the environment during cutting or disconnecting of tank fittings. Transfer materials drained into DOT-approved drums for storage and transportation. Use only non-sparking or non-heat producing tools to disconnect and drain or to cut through tank fittings. Electrical equipment (e.g., pumps, portable hand tools) used for tank preparation must be explosion-proof. Following cutting or disconnecting of the fittings, plug openings leading to the tanks.
3.8 SITE CONTROL MEASURES
Coordinate site control measures with Section 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS.
3.8.1 Work Zones
Initial anticipated work zone boundaries (exclusion zone, contamination reduction zone, support zone, all access points and decontamination areas) are to be clearly delineated on the site drawings. Base delineation of work zone boundaries on the contamination characterization data and the hazard/risk analysis to be performed as described in EM 385-1-1 . As work progresses and field conditions are monitored, work zone boundaries may be modified (and site drawings modified) with approval of the Contracting Officer. Clearly identify work zones and mark in the field (using fences, tape, or signs. Submit and post a site map, showing work zone boundaries and locations of decontamination facilities in the onsite office. Work zones must consist of the following:
3.8.1.1 Exclusion Zone (EZ)
The exclusion zone is the area where hazardous contamination is either known or expected to occur and the greatest potential for exposure exists. Control entry into this area and exit may only be made through the Contamination Reduction Zone (CRZ).
3.8.1.2 Contamination Reduction Zone (CRZ)
The CRZ is the transition area between the Exclusion Zone and the Support Zone. The personnel and equipment decontamination areas must be separate and unique areas located in the CRZ.
SECTION 01 35 29 Page 10
3.8.1.3 Support Zone (SZ)
The Support Zone is defined as areas of the site, other than exclusion zones and contamination reduction zones, where workers do not have the potential to be exposed to hazardous substances or dangerous conditions resulting from HTRW operations. Secure the Support Zone against active or passive contamination. Site offices, parking areas, and other support facilities must be located in the Support Zone.
3.8.2 Site Control Log
A log of personnel visiting, entering, or working on the site must be maintained. Include the following: date, name, agency or company, time entering and exiting site, time entering and exiting the exclusion zone (if applicable). Before visitors are allowed to enter the Contamination Reduction Zone or Exclusion Zone, they must show proof of current training, medical surveillance and respirator fit testing (if respirators are required for the tasks to be performed) and fill out a Certificate of Worker or Visitor Acknowledgment. Record this visitor information, including date, in the log.
3.8.3 Communication
Provide and install an employee alarm system that has adequate means of on and off site communication in accordance with 29 CFR 1910 Section .165.
The means of communication must be able to be perceived above ambient noise or light levels by employees in the affected portions of the workplace. The signals must be distinctive and recognizable as messages to evacuate or to perform critical operations.
3.8.4 Site Security
Provide the following site security: Print signs in bold large letters on contrasting backgrounds. Signs must be visible from all points where entry might occur and at such distances from the restricted area that employees may read the signs and take necessary protective steps before entering.
3.9 PERSONAL HYGIENE AND DECONTAMINATION
Personnel entering the Exclusion or Contamination Reduction Zones or otherwise exposed to hazardous chemical vapors, gases, liquids, or contaminated solids must decontaminate themselves and their equipment prior to exiting the contamination reduction zone (CRZ) and entering the support zone. Consult Chapter 10.0 of NIOSH 85-115 when preparing decontamination procedures. Submit a detailed discussion of personal hygiene and decontamination facilities and procedures to be followed by site workers as part of the APP/SSHP. Train employees in the procedures and enforce the procedures throughout site operations.
3.9.1 Decontamination Facilities
Submit drawings showing the layout of the personnel and equipment decontamination areas.
3.9.2 Personnel Decontamination
Personnel entering the Exclusion or Contamination Reduction Zones or otherwise exposed or subject to exposure to hazardous chemical vapors, liquids, or contaminated solids shall adhere to the following personal
SECTION 01 35 29 Page 11 hygiene and decontamination provisions. Decontamination shall be performed in the CRZ prior to entering the Support Zone from the Exclusion Zone. Chapter 10.0 of NIOSH 85-115 shall be consulted when preparing decontamination procedures. A detailed discussion of personal hygiene and decontamination facilities and procedures to be followed by site workers shall be submitted as part of the SSHP. Employees shall be trained in the procedures and the procedures shall be enforced throughout site operations. Persons disregarding these provisions of the SSHP shall be barred from the site.
3.9.3 Equipment Decontamination
Decontaminate the vehicles and equipment used in the EZ in the CRZ prior to leaving the EZ.
3.9.3.1 Facilities for Equipment and Personnel
Provide a vehicle/equipment decontamination station within the CRZ for decontaminating vehicles and equipment leaving the EZ. Construct a decontamination station pad, which meets the site decontamination needs for all vehicles and larger equipment decontamination. Construct the pad to capture decontamination water, including overspray, and allow for collection and removal of the decontamination water using sumps, dikes and ditches as required.
3.9.3.2 Procedures
Procedures for equipment decontamination must be developed and utilized to prevent the spread of contamination into the SZ and offsite areas. These procedures must address disposal of contaminated products and spent materials used on the site, including, as a minimum, containers, fluids, and oils. Assume any item taken into the EZ to be contaminated and perform an inspection and decontaminate. Vehicles, equipment, and materials must be cleaned and decontaminated prior to leaving the site.
Handle construction material in such a way as to minimize the potential for contaminants being spread or carried offsite. Prior to exiting the site, vehicles and equipment must be monitored to ensure the adequacy of decontamination.
SECTION 01 35 29 Page 12
-- End of Section --
SECTION 01 35 29 Page 13
File details come from the government source that posted it. Updated .