This document is a solicitation (Solicitation Number W912WJ25R0001) for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for environmental remediation services at the Raymark Superfund Site in Stratford, Connecticut. The work involves the excavation and off-site disposal or consolidation of contaminated soils and sediments from several operable units (OUs 3, 5, 6, 7, and 8) at the site, as well as the installation of an engineered cap at OU6 (Morgan Francis). The contract is set aside 100% for small business concerns, and the total contract value shall not exceed $49 million. The contract duration is 5 years, with a minimum guarantee of $10,000. Pricing will be on a firm-fixed-price basis, and the contractor will be required to propose 5 years of binding labor rates. Responses are due 02 Dec 2024, and the government will award a seed task order concurrently with the base IDIQ contract.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 01:00 PM local time 02 Dec 2024
A X B X C
D
EX
X G F 61 - 67
68 - 74 X H 75 - 80 tyler.s.maryak@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 80
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912WJ 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
TYLER S MARYAK 978-318-8049
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
3 - 29 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 32 - 33 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
34 - 59
PART II - CONTRACT CLAUSES
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
978-318-8159
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
30 Oct 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912WJ25R0001
Section B - Supplies or Services and Prices
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$10,000.00 $49,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
10,000.00 49,000,000.00
Section C - Descriptions and Specifications
IDIQ INFORMATION
1. This contract is a Single Award Indefinite Delivery Indefinite Quantity (IDIQ) Remedial Action Contract (RAC) for the Raymark Superfund Site in Stratford, Connecticut. Task orders will be issued on a firm‐fixed‐price basis.
Small Business Set-Aside: The contract is set‐aside 100% for small business concerns.
2. Pricing of Task Orders: After award of the base contract, work will be issued through negotiated task orders on a firm fixed price basis. Specific task and pricing information for work to be performed under this contract shall be included in each negotiated task order. Cost or pricing data may be required in subsequent task orders pursuant to Contract Clause 52.215‐20 (Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data).
3. Contract Amount: The total amount of task orders awarded and follow‐on modifications to those task orders, under this solicitation, shall not exceed $49M. The Government is obligated to satisfy a minimum guaranteed amount of not less than $10,000. Task order limitation are as defined in FAR 52.216‐19 (Ordering Limitations) in Section I – Contract Clauses.
4. The Seed Task Order will be awarded concurrently with that base IDIQ contract award.
5. Contract Period: The contract duration shall not exceed the 5 year ordering period.
6. Wage Determinations and Binding Labor Rates: The contract awardee will be required to pay wages in accordance with the applicable wage determinations listed in Section J, as updated. Task order and modification requests for proposal (RFPs) and subsequent awards will include updated wage determinations in compliance with Department of Labor regulations.The contract awardee will also be required to propose pricing on task orders that is consistent with its proposed binding rates, submitted as required by Section L of this solicitation. Binding rates will be incorporated into the negotiated contract, and all task order and modification proposals must use the binding rates. The offeror is required to propose five years of binding rates, inclusive of all escalation. Offerors should anticipate possible updates to wage determinations when proposing binding rates for all five years of the contract.
No adjustment will be made to binding rates after contract award.
7. All clauses, not specifically associated with a specific type of line item, will apply to all line items on the contract.
8. Potential Conflicts of Interest: If an offeror has an organizational conflict of interest that cannot be avoided, minimized or mitigated, the contract award will be withheld from the apparent successful offeror.
9. If an offeror or proposed Team Member currently provides, or has provided services within the past 10 years at the Raymark Superfund Site, such offeror must provide the Government with a statement that identifies the current or past work or affiliation, when it occurred, and substance of the work sufficient to allow the Government to determine if an organizational conflict of interest exists. If the offeror has an organizational conflict of interest, it should also present its plan to avoid, minimize or mitigate the conflict: such plan would be considered part of the offeror’s proposal.
10. Offerors who have had no past affiliation with, or who have performed no work within the past 10 years at the Raymark Superfund Site must furnish a certificate from an officer of the Offeror (such as President, Vice President, Managing Member of LLC, Owner) to that effect. The statement or certification should be submitted as a separate document along with, but not included in, either volume of the offeror’s proposal. An Offeror that fails to provide either statement or certification, as applicable, may be deemed non-responsible and the proposal will be rejected. The procedure for reviewing any organizational conflict of interest will be in accordance with FAR Part 9.5 et seq.
11. Offerors MUST have an active registration in SAM.gov at the date/time of the solicitation closing in accordance with FAR 52.204-7(b)(1). This includes Joint Venture and partnership offerors.
12. Offerors providing less than 100 days for acceptance will be rejected and will not be reviewed.
13. To ensure timely award of this requirement all Requests for Information must be submitted prior to 22 November 2024.
SITE VISIT INFORMATION
Offerors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
An organized site visit is scheduled as follows:
1:00 PM – 3:00 PM ET on 13 November 2024
Boots or other appropriate footwear should be worn, as locations may have difficult terrain, sharps, etc.
Carpool where possible, as parking may be challenging.
The site visit will include the following locations:
300 Ferry Boulevard, Stratford, CT 06615 51 Shore Road, Stratford, CT 00615
Parties shall meet at the Raymark Project Office, 300 Ferry Blvd., Stratford, CT 00615.
PWS - IDIQ
Performance Work Statement
For Indefinite Delivery/Indefinite Quantity Remediation Services Contract
Raymark Superfund Site Stratford, Connecticut
1.0 Background
The Raymark Industries, Inc. Superfund Site (the “Site”) includes areas that have been contaminated as a result of manufacturing processes from the former Raymark Industries, Inc. facility. The former Raymark Facility, which was located at 75 East Main Street in Stratford, Connecticut, operated from 1919 to 1989. Known as RaybestosManhattan, Inc., Raymark manufactured gaskets, clutches and heavy brake friction components for the automotive industry.
Raymark generated wastes containing asbestos, lead, copper, polychlorinated biphenyls (PCBs) and a variety of solvents, adhesives, and resins as byproducts of its manufacturing operations. The resultant byproducts were available as “free fill” to the Town and residents. The Raymark waste that remains in the town of Stratford presents a threat to human health that needs to be addressed.
U.S. Environmental Protection Agency (US EPA) approved three Record of Decisions (ROD) and one Explanation of Significant Differences (ESD) that specified the selected remedies for the subject properties at the Raymark Superfund Project located in the town of Stratford, Connecticut. The relevant ESD and RODs are titled:
• RAYMARK INDUSTRIES, INC. SUPERFUND SITE RECORD OF DECISION FOR
FINAL SOURCE CONTROL ACTIONS AT FOUR PROPERTIES WITHIN
OPERABLE UNIT 6 (ADDITIONAL PROPERTIES) AND INTERIM ACTIONS AT
OTHER LOCATIONS CONTAINING RAYMARK WASTE, dated July 2011
• RAYMARK INDUSTRIES, INC. SUPERFUND SITE RECORD OF DECISION FOR
FINAL REMEDY AT OPERABLE UNIT 2 (GROUNDWATER), INCLUDING VAPOR
MITIGATION ACTIONS; AND FINAL SOURCE CONTROL ACTIONS FOR
OPERABLE UNIT 3 (UPPER FERRY CREEK), OPERABLE UNIT 4 (RAYBESTOS
MEMORIAL FIELD), OPERABLE UNIT 6 (ADDITIONAL PROPERTIES) AND
MODIFICATION TO THE OU1 REMEDY, dated September 2016
• EXPLANATION OF SIGNIFICANT DIFFERENCES RAYMARK INDUSTRIES, INC.
SUPERFUND SITE OPERABLE UNITS 4 AND 6, dated September 2023
• RECORD OF DECISION FOR FINAL REMEDY AT OPERABLE UNIT 5 (SHORE
ROAD), STRATFORD, CONNECTICUT, dated March 2024
This contract is for work at OU3 (Ferry Creek Area 1), OU4 (Raybestos Memorial Field), OU5 (Shore Road), OU6 (Additional Properties), OU7 (Ferry Creek Area 2), & OU8 (Ferry Creek Area 3).
The general scope of work for this proposed contract involves the excavation of Raymark waste contaminated soils and sediments from five operable units (OUs) of the Raymark Superfund Project (OUs 3, 5, 6, 7, & 8). See Site Figure 1 below for reference. Contaminated soil and sediment will either be transported to OU6 Morgan Francis for consolidation or sent off-site for disposal. The contractor shall be responsible for all transport and disposal (T&D) activities whether disposal is at the OU6 Morgan Francis site or off-site. The work involves managing, coordinating, and implementing all remedial efforts at the properties during the excavation, restoration, consolidation, and capping activities. The contractor shall be responsible for establishing and implementing all stormwater management activities. The contract also involves the installation of an engineered cap at OU6 Morgan Francis upon completion of all excavation and consolidation activities. The remediation of OU5 is expected to include shore stabilization techniques such as the installation of a permanent bulkhead.
2.0 Contract Procurement Objectives and Overview
The contract awarded under this solicitation will be an Indefinite Delivery/Indefinite Quantity contract for various Environmental Remediation Action Services in support of the US Army Corps of Engineers New England District (USACE) at the Raymark Superfund Site, Stratford, Connecticut. The USACE has been retained by EPA through Interagency Agreement No.
DW9695898801 to implement the cleanup actions for the Raymark Superfund
Site. Project specific task orders will be issued under the basic contract. The USACE Contracting Officer (KO) or Project Manager (PM) will provide the Contractor with site-specific information in the USACE's possession upon issuance of each task order. Each task order will define the scope of work for the Contractor. Task orders may include, but will not be limited to, any combination of the following work:
Project Management; Management Plans; Work Plans; Accident Prevention and Site Safety Plan: Health Plans; Sampling and Analysis and Quality Assurance Project Plans; studies with associated reports; multiple phases of field investigations; optimization of existing remedies; compliance support; data management; data interpretation; hydrological and geochemical studies;
project reports; engineering support and/or design; geotechnical studies;
geotechnical monitoring; removal action plans, removal action, remedial action plans; remedial action; establishing safety zones and procedures near open cuts; protection of existing environmental resources; water management and treatment; clearing of vegetation; temporary and permanent surface water diversions; installation of horizontal drains and/or lined french drains;
dewatering; slope stabilization; excavation and consolidation of Raymark waste, excavation, transportation and off-site disposal of PHC; significant earthwork requiring appropriate erosion and sediment control best management practices (BMPs); impermeable cap installation; constructing storm-water conveyance & pumping station; installation of mitigation wetlands and passive treatment wetlands; site-wide inspection and maintenance including but not limited to caps, roads, wetlands, and invasive species;
operation and maintenance; sediment excavation; stream channel restoration;
wetlands restoration; management of investigative derived waste;
implementation of institutional controls; preparation of asbuilt drawings; site closeout/decision documents; project team and public meetings; Commercial Lease for Project Informational Center during the duration of this contract;
future project programming and scheduling support.
Work will generally fall under task orders using Performance Work Statements (PWS). The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.
Exclusive of the program and/or project management functions, the Contractor may utilize sub-contractors or consultants identified in the accepted proposal or subsequently approved by the KO to perform any of the functions required within the specific task orders.
The Contractor shall perform all the necessary services required to successfully meet all performance objectives of this PWS. The Contractor shall comply with all applicable Federal, State, and local laws and regulations in order to successfully complete all performance objectives of this PWS in a manner that is consistent with any applicable orders and permits and relevant Department of Defense (DOD) and Army policies for the duration of this Task Order. The Contractor shall also use the references listed below (and default to most recent version if different) when preparing the proposal and executing the work:
• EPA New England Region 1 – Raymark Industries, Inc. Superfund Site
– Record of Decision, Stratford, Connecticut dated September 2016;
• EPA New England Region 1 – Raymark Industries, Inc. Superfund Site
– Record of Decision For Final Remedy at Operable Unit 5 (Shore Road), Stratford, Connecticut dated March 2024;
• Raymark Superfund Site – OU4/OU6, Final OU3 Feasibility Study Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 29, 2016 – Nobis Engineering, Inc.
• Raymark Superfund Site – OU4/OU6, Final OU4 Feasibility Study, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 30, 2016 – Nobis Engineering, Inc.
• Raymark Superfund Site – OU5, Final OU5 Feasibility Study, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated July 31, 2023 – Nobis Engineering, Inc.
• Raymark Superfund Site – OU4/OU6, Final OU6 Feasibility Study Addendum, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 28, 2016 – Nobis Engineering, Inc.
• Engineer Manual (EM) 1110-1-4007 Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies, USACE, 2003.
• EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans, USACE, 01 Feb. 2001
• ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive Waste Remedial Activities, USACE, 30 Apr 1998
• EM 200-1-6, Chemical Quality Assurance for HTRW Projects, USACE, 10 Oct. 1997
• DOD Quality Systems Manual (QSM), for Environmental Laboratories, Revision 5.0 dated July 2013
• Uniform Federal Policy for Quality Assurance Project Plans (UFP for QAPP), Evaluating, Assessing and Documenting Environmental Data Collection and Program Use, Part 1 and Part 2, Final version 1, March
• Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Optimized UFP-QAPP Worksheets.
www.epa.gov/fedfac. DoD/EPA/DOE, March 2012
• EPA New England Environmental Data Review Program Guidance.
Version 422-2013
• DoD General Data Validation Guidelines Final Draft, Environmental Data Quality Workgroup, December 2016
• National Functional Guidelines for Superfund Organic Methods Data Review. EPA-540-R-2016-002
• National Functional Guidelines for Superfund Inorganic Methods Data Review. EPA-540-R-2016-001
• ER1180-1-6, Construction Quality Management, USACE, 30 Sep 1995
• EM 385-1-1 U.S. Army Corps of Engineers Safety and Health
Requirements Manual (2024)
• 42 U.S. Code Chapter 103 – Comprehensive Environmental Response, Compensation, and Liability.
• ER 1110-1-8157, Engineering and Design Geotechnical Data Quality
Management for Hazardous Waste Remedial Activities, 2002.
• EM 1110-1-1804 Geotechnical Investigations, Engineering and Design, 2001.
• EM 1110-1-1802 Geophysical Exploration for Engineering and
Environmental Investigations, 1995.
• EM 1110-2-1902, Slope Stability, USACE, 31 October 2003.
• United States Environmental Protection Agency, 2006. Guidance on
Systematic Planning Using the Data Quality Objectives Process (EPA QA/G-4). Published by the Office of Environmental Information.
• U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual, Second Edition, Volumes I and II, 1998, Reprinted 2001.
• U.S. Department of the Interior, Bureau of Reclamation, Earth Manual, Third Edition, Volumes I and II, 1998.
• Applicable ASTM Standards.
3.0 Types of Services Required
This contract includes the following types of environmental services as authorized under the basic contract:
• Site Characterization/Investigation
• Studies and Reports
• Monitoring and Interim Operations
• Engineering for Remediation and Associated Plans and Reports
• Remedial Action
4.0 Contract Type
Firm-Fixed Price (FFP)
5.0 Performance Objectives and Standards for All Task Orders
Performance objectives and standards shall be met for all executed task orders under this IDIQ contract. All future task orders will be Firm Fixed Price (FFP).
The Contractor shall furnish all labor, materials and equipment necessary to successfully complete all performance objectives identified in this PWS and Table 1, Performance Requirements Summary. Achievement of the performance objectives is successfully attained upon the finalization of appropriate documentation certifying that the documents have been accepted by the USACE.
USACE approval of the Performance Standards will be by the KO or Contracting Officer’s Representative (COR). Additional tasks and associated Performance Standards will be added to the table based on the scope of the work to be completed under the individual future Task Orders.
Table 1 – Performance Requirements Summary
Performance Objective/Task Performance Standard
Task 1 – General Conditions
Task 1.1 - Project Management/Project Controls
Submit Monthly Status Reports and Vouchers by 5th day of each month in accordance with program requirements and USACE acceptance
Task 1.2 – Prepare & Submit Plans Task 1.2.1 –Project Management Plan in accordance with Paragraph 6.1.2.1 and the Specifications.
USACE acceptance of Final Project Management Plan (PMP).
Task 1.2.2 –Construction Work Plan in accordance with Paragraph 6.1.2.2 and the Specifications.
USACE approval of Final Construction Work Plan
(CWP).
Task 1.2.3 – Health & Safety Documentation in accordance with Paragraph 6.1.2.3 and the Specifications.
USACE approval of Final APP/SSHP
Task 1.2.4 – Sampling and Analysis Plan (SAP) and Quality Assurance Project Plan (QAPP) in accordance with Paragraph 6.1.2.4 and the Specifications.
USACE approval of Final SAP/QAPP
In the event that there may be multiple milestones and/or deliverables for each of the performance objective tasks, partial payments will be based on the successful completion of milestones. Final decisions regarding the adequacy of milestone and deliverable completion resides with the KO or COR.
6.0 Task Order Contract Requirements
The Contractor shall furnish all necessary labor, equipment, materials, and supplies to complete the tasks listed in Table 1 above and defined in the following paragraphs. All work shall be conducted in a safe, secure, cost efficient, and environmentally acceptable manner in accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Record of Decisions signed in September 2016, and March 2024, and all applicable EPA green and sustainability principles and work practices where feasible. Work shall be completed correctly in a professional, workmanlike manner, in accordance with approved work plans. Work is to be performed commensurate with the level of effort and quality intended, with appropriately qualified quality control (QC) representation (as part of the contractor’s overall QC Program) controlling the work.
Contractor Quality Control (CQC) is the means by which the Contractor ensures that the work, to include that of subcontractors and suppliers, complies with the requirements of the contract. The control shall be adequate to cover all operations, including both onsite and off-site activities. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with governing regulations and contract task order requirements. The Contractor's quality control program shall include inspections and tests as described in the task orders.
The IDIQ contract duration is five (5) years.
6.1 Task 1 – General Conditions
6.1.1 Task 1.1 – Project Management/Project Controls
This task provides for oversight of the below activities to include the Program Manager, Project Manager, Subcontracts Manager, Project Controls, Cost Scheduler, and Administrative staff when engaged in representative non-sitespecific activities.
• Cost and schedule reporting and tracking.
• Subcontractor cost and schedule reporting and tracking.
• Program resource planning selection and resource conflict resolution.
• Participation by the Project Manager and Site Superintendent in monthly conference calls with USACE, EPA, Town of Stratford Health Department, and subcontractors; weekly conference calls during field construction.
• Contract basis review, verification, and tracking of invoices to ensure conformance to applicable contract requirements.
• Preparation of monthly invoices and cost tracking spreadsheet.
• Preparation of daily update on field activities via e-mail.
• Preparation of weekly field update on field activities via e-mail.
6.1.2 Task 1.2 – Prepare and Submit Plans
The Contractor shall prepare all plans as required by this PWS and the contract specifications.
6.1.2.1 Task 1.2.1 – Project Management Plan
The Contractor shall develop and maintain a detailed Project Management Plan (PMP). The PMP will specify the schedule, execution, and completion of the performance objectives. The first draft PMP shall be submitted within 30 calendar days of contract award. The draft PMP and subsequent revisions will be subject to USACE review and approval through the COR. The final PMP will be due within fifteen (15) calendar days of comments received from the COR. Assume a Draft, Draft Final, and Final PMP. A payment milestone will be established for USACE’s approval of the final PMP through the COR.
As part of the PMP, the Contractor will develop and maintain an activitybased schedule that fully supports the technical approach and outlines the due dates for all milestones and payable deliverables.
The schedule shall be in Gantt format created using MS Project or similar scheduling software. The comprehensive Gantt schedule shall begin with one Project Start milestone, end with one Project Finish milestone, and predecessors and successors for each activity (including milestones) shall be clearly identified via relationship arrows. The schedule shall include Government review periods.
Critical path activities shall be displayed in red. Displayed activity data shall include Activity ID, Activity Description, Start, Duration, Finish and Total Float. A payment plan will be included with the schedule that allows for payments to the Contractor based on successful completion of interim milestones proposed by the Contractor. It is the Army’s intent to make all payments after verification of progress in accordance with this schedule. As part of the PMP, the Contractor will identify and implement a means for providing project monthly status reports to the COR. The PMP will address the content of status reports.
The individual task order’s Final PMP for USACE approval shall be submitted within 60 days of award.
6.1.2.2 Task 1.2.2 – Construction Work Plan (CWP)
The Contractor shall prepare a draft, draft-final and final construction work plan prior to the commencement of any work on the project site.
The Construction Work Plan (CWP) shall contain, but not be limited to, the following:
• Statement of the work to be accomplished including a statement of Data Quality Objective(s);
• Discussion on implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations for the tasks required under the task order.
• A copy of the schedule detailing the work to be performed with key project milestones as described under Section 6.2.1 Task 2.1 Project Management Plan.
• Permits, licenses, access agreements, and certificates required;
• Key personnel to be used on the project along with their roles and responsibilities;
• Site-specific assumptions and clarifications;
• Logs, reports, and record keeping to be utilized.
Assume internal draft, regulatory draft, draft final and final versions will be required with Response to Comments (RTCs) and response to comments letters (RCL) by the Contractor. Contractor shall assume a minimum of 10 business days for each Government review phase.
Acceptance of the Contractor's work plan by the Government is required prior to any field mobilization. Acceptance is conditional and will be predicated on satisfactory performance during field activities.
Deviations or proposed changes to the approved work plan shall be submitted to the USACE’s PM and COR for review, comment, and approval. The Government reserves the right to require the Contractor to make changes in his work plan and operations as necessary.
During execution of the task order, the Contractor shall follow the approved work plan.
The individual task order’s CWP for USACE approval shall be
6.1.2.3 Task 1.2.3 – Health and Safety Documentation
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities to be performed. The documentation shall include an Activity Hazard Analysis (AHA) for each phase of work as described below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385- 11%20_EFFECTIVE%2015March2024.pdf
The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations.
The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. The APP shall be developed by a qualified person. The contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.
The contractor shall prepare a Site Health and Safety Plan (SSHP) that complies with the minimum requirements outlined in identified in EM385-1-1, Section 36-7. Minimum Plan Requirements. The SSHP shall be attached to the APP as an Appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated in the SSHP.
The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
The Contractor shall conduct a safety meeting at the project site on the first day of work, and whenever a new activity or phase of work begins. All safety meetings shall be documented. Records of the safety briefings shall be submitted to the GDA weekly.
Activity Hazard Analysis (AHA)
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.
Accident Reporting
All accidents and near misses shall be investigated by the Contractor.
All work-related injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the GDA within 4 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D. shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.
The Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 10th calendar day of the following month. The form shall be transmitted by the prime contractor to the GDA electronically.
The individual task order’s APP for USACE’s approval shall be
6.1.2.4 Task 1.2.4 – Sampling and Analysis Plan and Quality
Assurance Project Plan
A Sampling and Analysis Plan (SAP) shall be prepared in accordance with this paragraph, the Specifications, and EM 200-1-3, dated February 1, 2001, or subsequent revision. In addition, the SAP will be required to include a Quality Assurance Project Plan (QAPP), prepared in accordance with Uniform Federal Policy for Quality Assurance Project Plans (DTIC ADA 427785), dated March 2005 or subsequent revision. The Contractor shall also develop data quality objectives (DQOs) for all phases of required work from existing project documents, applicable state and federal guidance and directives, and own sources, and include them in the appropriate sections of the work plans. Copies of the Contractor’s SOPs and appropriate field forms shall be included as part of the SAP.
The individual task order’s SAP and QAPP for USACE approval shall be submitted within 60 days of award.
7.0 Additional Requirements
7.1 Environmental Protection Requirements
The Contractor shall identify applicable Federal, State and Local laws, regulations, and Project specific orders or agreements and perform all work in accordance with said authorities. The Contractor shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed in accordance with said authorities. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the USACE’s KO, COR, and PM via telephone, followed by written notice.
Nothing in this PWS shall relieve the Contractor of its responsibility to comply with applicable laws and regulations. The Contractor shall investigate the requirements for and obtain all permits, licenses, approvals, and/or certificates necessary to accomplish the work specified. When the work to be performed requires clearances, such as digging or drilling permits, the Contractor shall obtain such clearances and/or permits, with the assistance of the facilities/site point of contact, prior to initiation of any drilling or excavating operations. The Contractor shall coordinate all excavating with USACE prior to performing work. Contractors on environmental sites are required to perform their own utility checks. The Contractor shall comply with all USACE or site-specific time and procedural requirements (federal, state, and local) described in the permits obtained. The USACE will continue to independently review Contractor work to ensure compliance with all applicable requirements.
The Contractor shall perform all work in a manner that minimizes the pollution of air, water or land and develop contingency measures for cleanup of any spills that may occur during performance of this contract. The Contractor shall control noise and dust within reasonable limits or limits established by applicable federal, state, and local laws and regulations. A site survey may be required to identify any wetlands, endangered species, special habitat or other protected areas. Task Orders may include specific environmental protection requirements.
7.2 Sustainability Requirements
In reducing our carbon footprint and using green technologies to the extent practical during remediation, the Contractor shall review and fully understand Executive Order 13693 "Planning for Federal Sustainability in the Next Decade” dated 25 March 2015, in particular those requirements pertaining to environmental management system (EMS).
The Contractor shall consider and implement green response/remediation strategies and applications to maximize sustainability, reduce energy and water usage, promote carbon neutrality, promote industrial materials reuse and recycling, and protect and preserve land resources, consistent with DOD and EPA Policies on Green and Sustainable Remediation Practices in the EPA Federal Superfund Program (https://www.epa.gov/superfund/superfund-green-remediation). The contractor shall present green remediation options and approaches in its work plans, maintain records of “green-related” activities, and report this information to the COR in its project status reports.
EPA Superfund and Green Remediation guides, standards, and Policies include but are not limited to:
1. Superfund Green Remediation Strategy, Sep 2010, U.S.
Environmental Protection Agency, Office of Superfund Remediation and Technology Innovation.
2. Memorandum, U.S. Environmental Protection Agency, 02 August 2016, Consideration of Greener Cleanup Activities in the Superfund Cleanup Process.
3. Clean and Greener Policy for Contaminated Sites, EPA Region 1, Feb 2012, Office of Site Remediation and Restoration
The contractor shall meet the recycled content requirements set forth by EPA for the products identified in the Comprehensive Procurement Guideline (CPG) and at the following link: https://www.epa.gov/smm/comprehensive-procurement-guidelinecpg-program
The contractor shall meet the Bio-Preferred Program requirements set forth by USDA for the products identified in the following link:
http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xht ml)
All deliverables shall be printed double sided on post-consumer fiber paper.
7.3 Protection of Property
The Contractor shall be responsible for any damage that may be caused to property by the activities of the Contractor under this PWS. Additionally, the Contractor shall exercise due diligence in the protection of all property located on the premises against fire or damage from any and all other causes. Any property damaged or destroyed by the Contractor incident to the exercise of the privileges herein granted shall be promptly repaired or replaced by the Contractor to a condition satisfactory to the COR necessary to restore or replace the property to a condition satisfactory to the COR.
7.4 Health and Safety Requirements
a. The Contractor shall submit the safety and health organizational structure for their company. This shall include the name and qualification of the experienced Safety Manager directly accountable for the effectiveness of safety efforts under the contract as well as for the implementation of the Corporate Safety Program.
b. The Contractor shall submit their written Corporate Safety Program document which details the company’s safety policies, procedures, and programs as detailed below:
• Management Commitment to Safety
• Safety and Health Program Goals and Metrics
• General Safety Rules and Regulations
• Safety Officer Qualifications, Responsibilities, and Duties
• Hazard Identification and Assessment (to include safety audits, hazard identification, and risk assessment, evaluation, and control).
• Hazard Prevention and Control (to include Hazard Communication and the method by which safety-related matters are coordinated with all disciplines and subcontractors)
• Safety Report of Hazards and Concerns
• Mishap Investigation, Loss Control, Trend Analyses, and Lessons
Learned
• Safety Inspection Program
• Selection of subcontractors
• Safety Training
• Hiring and Indoctrination of Employees (Safety Personnel, Supervisors and Employees)
• Safety Meetings & Committees (to include the method by which safety concerns or issues are resolved)
• Safety Awards Program
• Emergency Preparedness
• Enrollment in Medical Surveillance Program
• Safety Program Evaluation and Improvement
• Coordination and Communication on Multiemployer Worksites
• Process for Establishing Optimal Staffing Levels for Successful
Completion of Contractually-required Tasks
• Recordkeeping (Mishaps, safety meetings, inspections, training, program audits)
c. The Contractor shall provide their Experience Modification Rate (EMR) for the past five years. The Contractor shall demonstrate an annual EMR Rate of 1.0 or less. Subcontractors utilized by the Prime Contractor on any Task Orders under this contract shall provide documentation that they have maintained an EMR of 1.0 or less for the previous three years.
Acceptable documentation of EMR may be a letter provided by the insurance company, written on company letterhead, detailing the EMR for the Prime Contractor and Subcontractors.
d. Each Task Order will contain site-specific safety requirements tailored to the work to be performed. The Contractor shall ensure one qualified Safety Officer and one Alternate Safety Officer meeting the qualification requirements detailed in each Task Order is designated to oversee onsite work. All work executed under each Task Order shall comply with all Federal, State, and local regulations as well as the most recent edition of the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385- 11%20_EFFECTIVE%2015March2024.pdf
e. Mishap Reporting. All mishaps (accidents and near miss incidents) shall be investigated by a competent person employed by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-theroad vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the GDA within 4 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the GDA. USACE ENG Form 3394 (Attachment 1) shall be completed and submitted to the GDA within seven working days of the incident. Within 10 days of an OSHA recordable incident or USACE reportable property damage incident, the Contractor shall submit to the GDA a Lessons-Learned document.
f. Safety Briefings. The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work. All safety meetings shall be documented (Attachment 2). A copy of the weekly safety meeting form will be submitted to the GDA weekly.
g. Monthly Reporting. For each Task order involving field activities, the Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (Attachment 3) (for the Prime Contractor and Subcontractors). The completed form shall be submitted to the GDA no later than close of business on the 5th calendar day of the following month. The method of transmission shall be electronic.
h. Equipment Inspection. The Contractor shall ensure heavy equipment used to complete field activities on any Task Order under this contract is inspected by a competent person. The inspection shall document that the equipment is suitable and safe for the work tasks being performed. Safety inspection documentation shall be accepted by the GDA prior to the equipment being mobilized to the site.
7.5 Sampling and Analysis Quality Control
Appropriate documentation of Quality Control shall be provided whenever sampling or analysis for chemical, geophysical, geotechnical, particulate, or soils parameters is required in order to meet the PWS objectives. The laboratory(ies) to be used by the Contractor shall be certified by the National Environmental Laboratory Accreditation Program (NELAP) or an equivalent agency. The Contractor may also establish an onsite testing laboratory at the project site if determined necessary by the Contractor. However, this on-site testing shall meet the requirements of EPA and any specific state regulator requirements. The Contractor shall also comply with all requirements of the DoD Quality Systems Manual, Final Version 3, dated January 2006 or more recent version.
7.5.1 Analytical Testing
Environmental laboratory services are to be provided only by laboratories that have successfully passed the new Environmental Laboratory Accreditation Program (ELAP) audit implemented 1 October 2009, including being compliant with the most recently published version of the Department of Defense (DOD) Quality Systems Manual (QSM Version 4.2, dated 25 October 2010, and holding current National Environmental Laboratory Accreditation Program (NELAP) accreditation for all the preparatory and analysis methods found in the latest revision on the Generic MMR UFP QAPP using the final version dated March 2005. The latest version of the DOD QSM, Version 4.2 is available at http://www.denix.osd.mil or http://navylabs.navy.com. As requested by the COR, the laboratory shall submit in a timely manner, their ELAP accreditation certificate (including supporting documentation). Before testing services can be performed by the laboratory, the COR will notify the candidate laboratory of the acceptability of their ELAP accreditation and supporting documentation. The ELAP accreditation certificate is to be provided upon each recertification while supporting USACE contracts.
An environmental laboratory, either participating, or engaged in support of USACE contracts, shall notify the Prime Contractor and COR, immediately of change in status of laboratory operations that may affect on-going compliance with these requirements. The COR may, at any time, conduct audits (including requests for pertinent data or information) that support an environmental laboratory's ELAP accreditation with this policy. If the COR finds the laboratory non-compliant; alternate, compliant laboratory services will be utilized, until such time as compliance is again demonstrated. Before performing environmental testing for the USACE, the laboratory shall have access to the approved Sampling and Analysis Plan (SAP) and/or QAPP, as the case may be.
The laboratory shall provide sample results in both paper copy and electronic data deliverable (EDD) format within the prescribed turnaround time (TAT) associated with any sampling event. The Contractor shall work closely with the analytical laboratories to schedule all sampling events in advance in order to meet the TAT requirements of the program. The laboratory report shall include:
a) Sample Results.
b) Dates of Extraction and Analysis.
c) Associated Quality Control including laboratory method blank, trip blanks, equipment blanks, Laboratory Control Sample (LCS), matrix spike and matrix spike duplicate (MS/MSD), surrogate recovery, and duplicate sample results.
d) Narrative describing any sample anomalies or quality control exceedance, and their impact on the analytical results.
e) Copies of Chain of Custody and Sample Receipt forms.
f) Electronic data deliverables.
g) All appropriate data required for a Tier III or CLP validation
All supporting data (i.e., calibration curves, instrument tuning information, etc.) shall be stored at the laboratory and by the Contractor for future reference in accordance with the QAPP.
The Contractor shall provide laboratory analyses, data validation, and data management for all samples collected. Quality Assurance/Quality Control (QA/QC) samples shall be collected to monitor the sample collection, handling, and analysis procedures. QC samplefrequencies shall be established for each task order.
When samples are received at the laboratory, the sample custodian will complete a Cooler Receipt form to document the condition of the samples upon arrival. The Cooler Receipt form and the Chain of Custody form for the samples shall be kept on file for permanent record of all sampling.
7.5.2 Sample Data Review/Validation and Reporting
Data validation reports will be completed for each laboratory data package or sample delivery group (SDG) in accordance with the Quality Assurance Project Plan. The Contractor shall perform Tier II data validation on ninety percent of the analyzed samples and Tier III validation on the remaining ten percent of analyses using qualified personnel. Data validation may proceed using automated or semi-automated systems, and shall be performed in accordance with the EPA Data Validation Functional Guidelines (EPA 2016).