Operation and Maintenance Services at the Camp Pendleton Hospital and Outlying Medical Clinics

Award Notice Posted

Solicitation number
W912PL-16-R-0011
Agency
Awarded
to Good-Men Roofing & Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912PL16C0011 Federal contract award
NAICS code
561210 Facilities Support Services
PSC
Not on record
Place of performance
Naval Hospital Camp Pendleton Bldg H-200 Vandegrift Blvd Camp Pendleton, CA 92055 Mclb Barstow Barstow, California Building 149 149 C Street Mcagcc Twentynine Palms 29 Palms, California Building 1591 1591 Griffin Road Mcas Yuma Yuma, Arizona Building 1175 980 Shaw Avenue Naval Base Ventura County (Medical Clinic): Port Hueneme, California Building 1402 162 First Street Naval Base Ventura County (Dental Clinic) Port Hueneme, California Building 914 720 23rd Street Naval Base Ventura County (Medical) San Nicolas Island, California Building 58 311 Main Street, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This Installation Support Contract provides the U.S. Army Corps of Engineers (USACE) with the capability to execute operation and maintenance (O&M) services and minor construction for Camp Pendleton and Outlying Clinics. O&M activities include, but are not limited to preventative maintenance, repairs, painting, trouble-shooting existing systems, servicing existing operations, emergency services, landscaping, pest control and limited construction activities not to exceed the simplified threshold for small purchases. The Contractor will be required to perform all stated services within this contract for a variety of federal customers. The facilities to be serviced under this scope are: Naval Hospital Camp Pendleton Building H-200 and the branch facilities (also referred to as Clinics) are located at: Marine Corps Base Camp Pendleton, Marine Corps Air Station Camp Pendleton, Marine Corps Logistics Base Barstow, Marine Corps Air Ground Combat Center Twenty-nine Palms, Marine Corps Air Station Yuma and at Naval Base Ventura County.

The technical requirements specified in this statement of work are intended to provide requirements for execution of the contract and general understanding of the functions that the Contractor may be required to perform. The Contractor will receive from the USACE a complete scope of work for the contract or plans and specifications for each project.


Work is to be accomplished for the Camp Pendleton and Outlying Clinics. Government Certification of satisfactory service is contingent upon the contractor performing in accordance with this Performance Work Statement (PWS), any associated work orders, and all amendments.


Work is to be accomplished for the Camp Pendleton and Outlying Clinics. Government certification of the satisfactory performance of the provided Performance Work Statement (PWS) is contingent upon the contractor performing in accordance with the contract requirements.
This will be a five (5) year service contract award with one (1) base year and four (4) Option years. The total period of performance is 01 May 2016 through 31 April 2021.

Update #1 ·

This Installation Support Contract provides the U.S. Army Corps of Engineers (USACE) with the capability to execute operation and maintenance (O&M) services and minor construction for Camp Pendleton and Outlying Clinics. O&M activities include, but are not limited to preventative maintenance, repairs, painting, trouble-shooting existing systems, servicing existing operations, emergency services, landscaping, pest control and limited construction activities not to exceed the simplified threshold for small purchases. The Contractor will be required to perform all stated services within this contract for a variety of federal customers. The facilities to be serviced under this scope are: Naval Hospital Camp Pendleton Building H-200 and the branch facilities (also referred to as Clinics) are located at: Marine Corps Base Camp Pendleton, Marine Corps Air Station Camp Pendleton, Marine Corps Logistics Base Barstow, Marine Corps Air Ground Combat Center Twenty-nine Palms, Marine Corps Air Station Yuma and at Naval Base Ventura County.

The technical requirements specified in this statement of work are intended to provide requirements for execution of the contract and general understanding of the functions that the Contractor may be required to perform. The Contractor will receive from the USACE a complete scope of work for the contract or plans and specifications for each project.


Work is to be accomplished for the Camp Pendleton and Outlying Clinics. Government Certification of satisfactory service is contingent upon the contractor performing in accordance with this Performance Work Statement (PWS), any associated work orders, and all amendments.


Work is to be accomplished for the Camp Pendleton and Outlying Clinics. Government certification of the satisfactory performance of the provided Performance Work Statement (PWS) is contingent upon the contractor performing in accordance with the contract requirements.
This will be a five (5) year service contract award with one (1) base year and four (4) Option years. The total period of performance is 01 May 2016 through 31 April 2021.

Files

File Type Posted
Correct_Amendment_06_-_NHCP_PWS_-_18MAR2016-2.docx DOCX document
Am7_W912PL-16-R-0011.pdf PDF
Amendment_06_-_Updated_-_Service_Contract_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_FuelFilteringSystem_-_FIO.pdf PDF
Amendment_06_-_Revised_Section_M_-_17MAR2016.pdf PDF
Amendment_06_-_Updated_-_Davis-Bacon_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_NHCP_Fuel_Storage_Tanks_-_FIO.pdf PDF
Amendment_06_-_NHCP_PWS_-_17MAR2016.pdf PDF
Amendment_06_-_Exhaust_hoods-PM_only-_FIO.pdf PDF
Amendment_06_-_W912PL-16-R-0011_-17MAR2016_.pdf PDF
Amendment_05_-_Revised_Section_L_-_3MAR2016.pdf PDF
Amendment_05_-_W912PL-16-R-0011_-_3MAR2016_.pdf PDF
Amendment_04_-_Property_Record_Information_-_2MAR2016.xlsx XLSX spreadsheet
Amendment_04_-_NURSE_CALL_SYSTEMS_-_2MAR2016.pdf PDF
Amendment_04_-_H-200_EXTERIOR_ELEVATIONS_-_2MAR2016.pdf PDF
Amendment_04_-_11_24_00_00_95_BUILDING_MAINTENANCE_EQUIPMENT-_2MAR2016.pdf PDF
Amendment_04_-_FY14_Backflow_Inventory_List_H-200_and_Clinics_-_2MAR2016.xls XLS spreadsheet
Amendment_04_-_Amalgam_Separator_-_2MAR2016.pdf PDF
Amendment_04_-_W912PL-16-R-0011_-_2MAR2016_.pdf PDF
Amendment_04_-_Landscaping_areas_-_2MAR2016.pdf PDF
Amendment_04_-_Section_M_-_2MAR2016.pdf PDF
Amendment_03_-_Med_Gas_Test_Report_-_23FEB2016.pdf PDF
Amendment_03_-_NHCP_PWS_-_25FEB2016.pdf PDF
Amendment_03_-_Appendix_A_-_Mechanical_Equipment_Inventory_-_25FEB2016_.xlsx XLSX spreadsheet
Amendment_03_-_Revised_Section_L.pdf PDF
Amendment_03_-_PM_Frequency_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_Work_Request_Summary_Report_Jan_2014_-_Dec_2015.xls XLS spreadsheet
Amendment_03_-_Revised_Section_B.pdf PDF
Amendment_03_-_PART_XIII_ConstructionSpecifications_Complete_-_23FEB2016.pdf PDF
Amendment_03_-_TJC_Inspections_-_23FEB2016.pdf PDF
Amendment_03_-_Galley_Refrigerators_and_Freezers_-_23FEB2016.pdf PDF
Amendment_03_-_W912PL-16-R-0011_-_25FEB2016_.pdf PDF
Amendment_03_-_Hospital_Clinic_List_-_23FEB2016.xlsx XLSX spreadsheet
Contractor_Sign_in_Sheet_20FEB2016.pdf PDF
Amendment_03_-_H200_Tree_Inv_-_23FEB2016.pdf PDF
Amendment_03_-_Government_Furnished_Equipment_-_23FEB2016.pdf PDF
Amendment_03_-_FMD_Construction_Package_-__23FEB2016.pdf PDF
Amendment_03_-_Revised_Section_C.pdf PDF
Amendment_03_-_Revised_Section_M.pdf PDF
Amendment_03_-_NHCP_Active_RPIE_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_Floor_Plan_14_Area_Trailer_-_23FEB2016.pdf PDF
Amendment_02_-_W912PL-16-R-0011-_23FEB2016.pdf PDF
W912PL-16-R-0011-_Am01_.pdf PDF
Attachment_7_-_DB_Wage_Determinations_20JAN2016.pdf PDF
Attachment_8_-_SCA_Wage_Determinations_19JAN2016.pdf PDF
A.01.30_-_Attachment_1_-_Map_NHCP_and_CLINICS_-_21JAN2016.pdf PDF
Solicitation_-_W912PL-16-R-0011_-_27JAN2016.pdf PDF
A.01.30_-_Attachment_6_-_RSMEANS_San_Diego_Cost_Index_-_21JAN2016_.pdf PDF
A.01.30_-_Appendix_D_-_Project_Experience_Form_-_26JAN2016.docx DOCX document
A.01.30_-_Attachment_3_-_TJC_Inspections_-_21JAN2016.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
This notice Latest Award Notice
Perform Operation and Maintenance services at the Camp Pendleton Hospital and Outlying Medical Clinics Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors