Amendment_06_-_NHCP_Fuel_Storage_Tanks_-_FIO.pdf

PDF 154 KB Posted

Attached to
Operation and Maintenance Services at the Camp Pendleton Hospital and Outlying Medical Clinics
Solicitation number
W912PL-16-R-0011
Issued by

About this file

Amendment 06 - NHCP Fuel Storage Tanks - FIO

View the file

Other files

File Type Posted
Correct_Amendment_06_-_NHCP_PWS_-_18MAR2016-2.docx DOCX document
Am7_W912PL-16-R-0011.pdf PDF
Amendment_06_-_Updated_-_Service_Contract_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_Revised_Section_M_-_17MAR2016.pdf PDF
Amendment_06_-_Updated_-_Davis-Bacon_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_NHCP_PWS_-_17MAR2016.pdf PDF
Amendment_06_-_Exhaust_hoods-PM_only-_FIO.pdf PDF
Amendment_06_-_FuelFilteringSystem_-_FIO.pdf PDF
Amendment_06_-_W912PL-16-R-0011_-17MAR2016_.pdf PDF
Amendment_05_-_Revised_Section_L_-_3MAR2016.pdf PDF
Amendment_05_-_W912PL-16-R-0011_-_3MAR2016_.pdf PDF
Amendment_04_-_NURSE_CALL_SYSTEMS_-_2MAR2016.pdf PDF
Amendment_04_-_Section_M_-_2MAR2016.pdf PDF
Amendment_04_-_H-200_EXTERIOR_ELEVATIONS_-_2MAR2016.pdf PDF
Amendment_04_-_FY14_Backflow_Inventory_List_H-200_and_Clinics_-_2MAR2016.xls XLS spreadsheet
Amendment_04_-_Landscaping_areas_-_2MAR2016.pdf PDF
Amendment_04_-_Amalgam_Separator_-_2MAR2016.pdf PDF
Amendment_04_-_11_24_00_00_95_BUILDING_MAINTENANCE_EQUIPMENT-_2MAR2016.pdf PDF
Amendment_04_-_W912PL-16-R-0011_-_2MAR2016_.pdf PDF
Amendment_04_-_Property_Record_Information_-_2MAR2016.xlsx XLSX spreadsheet
Amendment_03_-_PART_XIII_ConstructionSpecifications_Complete_-_23FEB2016.pdf PDF
Contractor_Sign_in_Sheet_20FEB2016.pdf PDF
Amendment_03_-_Government_Furnished_Equipment_-_23FEB2016.pdf PDF
Amendment_03_-_Floor_Plan_14_Area_Trailer_-_23FEB2016.pdf PDF
Amendment_03_-_Med_Gas_Test_Report_-_23FEB2016.pdf PDF
Amendment_03_-_Appendix_A_-_Mechanical_Equipment_Inventory_-_25FEB2016_.xlsx XLSX spreadsheet
Amendment_03_-_Revised_Section_L.pdf PDF
Amendment_03_-_Revised_Section_B.pdf PDF
Amendment_03_-_Work_Request_Summary_Report_Jan_2014_-_Dec_2015.xls XLS spreadsheet
Amendment_03_-_NHCP_PWS_-_25FEB2016.pdf PDF
Amendment_03_-_PM_Frequency_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_Galley_Refrigerators_and_Freezers_-_23FEB2016.pdf PDF
Amendment_03_-_TJC_Inspections_-_23FEB2016.pdf PDF
Amendment_03_-_Hospital_Clinic_List_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_H200_Tree_Inv_-_23FEB2016.pdf PDF
Amendment_03_-_FMD_Construction_Package_-__23FEB2016.pdf PDF
Amendment_03_-_Revised_Section_C.pdf PDF
Amendment_03_-_NHCP_Active_RPIE_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_W912PL-16-R-0011_-_25FEB2016_.pdf PDF
Amendment_03_-_Revised_Section_M.pdf PDF
Amendment_02_-_W912PL-16-R-0011-_23FEB2016.pdf PDF
W912PL-16-R-0011-_Am01_.pdf PDF
Attachment_7_-_DB_Wage_Determinations_20JAN2016.pdf PDF
Attachment_8_-_SCA_Wage_Determinations_19JAN2016.pdf PDF
A.01.30_-_Attachment_2_-_Facility_Overview_-_21JAN2016.pdf PDF
A.01.30_-_Appendix_C_-_Personnel_Resume_Form_-_26JAN2016.docx DOCX document
A.01.30_-_Attachment_4_-_13th_Edition_Glossary_-_21JAN2016.pdf PDF
A.01.30_-_Attachment_6_-_RSMEANS_San_Diego_Cost_Index_-_21JAN2016_.pdf PDF
Solicitation_-_W912PL-16-R-0011_-_27JAN2016.pdf PDF
A.01.30_-_Attachment_1_-_Map_NHCP_and_CLINICS_-_21JAN2016.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL REPLACEMENT HOSPITAL CAMP PENDLETON

U.S. MARINE CORPS BASE, OCEANSIDE, CA

TABLE OF CONTENTS

33 56 10 Factory-Fabricated Fuel Storage Tanks

SD-02 Shop Drawings

SD-03 Product Data

SD-06 Test Reports

SD-07 Certificates

SD-10 Operation and Maintenance Data

Rowena Office Corporate Office 2886 Rowena Ave. 5745 Venice Blvd.

Los Angeles, CA 90039 Los Angeles, CA 90019 Ph: 323.668.1551 Ph: 323.939.9990 Fx: 323.668.1595 State Contractors License #904020 Fx: 323.939.9262 DVBE & SB Licensed Enterprise MMM 0006 sd -02 sh op drawin gs sd -03 product data

Project: Naval Hospital Camp Pendleton

Spec Section:

Sub Section:

Description:

Name:

Date: 9/13/11

Approval for Submission

CMJV A Joint Venture

33 56 10 Factory Fabricated Fuel Tanks Sub sections 2.5.1, 2.5.2, 2.5.3, 2.5.4, 2.5.5,

2.8 thru 2.10.3

Naval Hospital Camp Pendleton

SUBMITTAL APPROVAL PAGE

Monaco Engineer of Record

YOUR VALUE ADDED PETROLEUM EQUIPMENT DISTRIBUTOR

PME Equipment Sales 232 Commercial Street San Jose, CA 95112

(408) 998-8205 Fax (408) 998-8249

PME Equipment Sales 2190 Enterprise Blvd

West Sacramento, CA 95691

(916) 371-8271 Fax (916) 384-0298

PETROLEUM MARKETING EQUIPMENT

Corporate Office 740 Monroe Way

Placentia, CA 92870

(714) 577-7878 Fax (714) 577-7979

Project: CAMP PENDLETON NAVAL HOSPITAL

# QTY. PART # DESCRIPTION

1 2 MODTANK 35.000 Gallon CSI D/W FRP underground storage tank with one 22" manway with four 4" NPT manway fittings, four 4" NPT tank mounted fittings, one 42" D/W tank collar, two 48" D/W tank collars, one brine manhole, set of hold down straps and brine filled interstitial.

2 2 CSITANK CSI Set of Deadman anchors and turnbuckles

3 4 DWPTS(WT34)48/8-6 CSI 48" D/W FRP tank sump with 34" opening and watertight lid 4 2 DWPTS(FV2/15/16)42/8-6 CSI 42" D/W FRP tank sump with watertight lid with openings for OPW multi port manway.

5 24 CSITANK CSI Sump bond adhesive kits 6 2 D02575M OPW Shroud boot 7 2 H15188M OPW Lower Clamp for Shroud Boot 8 2 H15190M OPW Upper Clamp for Shroud Boot

Remote Fill Equipment

9 1 AFP3/2 Simplex 3" Auto fuel port for two tanks includes the following;

1 alarm High level tank alarm 1 alarm Low level tank alarm 1 alarm Tank leak alarm 1 alarm horn Audible alarm horn activated by alarms 2 ballvalve Motorized ball valves 1 checkvalve Check valve 2 digitallevel Digital level indicator scaled to percent level 1 ground Ground stud 1 handpump Handpump for spill containment evacuation 1 hose coupling 3" Quick disconnect hose coupling with dust plug 2 floatswitch 90/95% level transmitter 1 on/off Control power on/off switch 1 open/close Valve open/close pushbuttons 1 powerind "Power Available" indicator 1 pressrel Pressure relief valve

Remote Fill/Vent Transition Sump

14 1 B600-F3S-BD-AB Bravo D/W FRP Three product Vent transition sump with hydrostatic 15 1 EO-EBS Bravo Electrical offset frame 16 1 VFA-3 Bravo 3" Vent fitting 17 2 FF20X18HMXM346 Flexing 2" x 18" MS x M Flex connector 18 2 012030-626-0 Smith 3" x 2" Sump entry fitting 19 2 012040-238-3 Smith 4" x 3" Concentric reducers

1 Specification Section 33 56 10 Factory Fabricated Fuel Storage Tank 1

1 Submittal # 335610-01-092111 1

San Jose, CA 95112

(408) 998-8205 Fax (408) 998-8249

PME Equipment Sales 2190 Enterprise Blvd

West Sacramento, CA 95691

(916) 371-8271 Fax (916) 384-0298

PETROLEUM MARKETING EQUIPMENT

Corporate Office 740 Monroe Way

Placentia, CA 92870

(714) 577-7878 Fax (714) 577-7979

20 1 FFUL30X18MXM Flexing 3" x 18" M x M Flex connector 21 1 012040-626-0 Smith 4" x 3" Sump entry fitting 22 1 012050-238-3 Smith 5" x 4" Concentric reducers

Underground Storage Equipment Fill Sump - Diesel

9 2 6571EVRL-164042RT051 OPW 42" Single-port spill contained manhole 10 2 61SALP-1020-EVR OPW Swivel fill adaptor 11 2 634TT-7085-EVR OPW 4" Fill cap 12 2 FSA-400-S OPW Face seal adaptors 13 2 61JSK-44CB OPW Jack screw assembly 14 2 FPN4X5 OPW 4" x 5" Spill bucket nipple 15 2 61T-7468 OPW 4" x 17' Drop tube (remote fill requires 4" tee - by others) 16 2 233-4422 OPW Vent extractor 4x4x2x2 (Vent/FFOR) 17 2 53VML-0120 OPW Ball float vent valve 18 2 578-0100AC Morrison Extractor pipe caps 19 4 FF20X18HMXM346 Flexing 2" x 18" MS x M Flex connector 20 4 012030-626-0 Smith 3" x 2" Sump entry fitting 21 4 012040-238-3 Smith 4" x 3" Concentric reducers 22 6 F-17-RR-D Bravo D/W FRP 3/4" Electrical conduit entry fitting 23 6 ADHESIVE-KIT-FS-10 Bravo Electrical fittings adhesive (requires double caulking gun)

Turbine Sump: Diesel

24 4 6110-42WT Pomeco 42" Watertight turbine lid 25 4 STP150-VL2 F.E. Petro 1-1/2 HP Submersible Turbine pump (FOS/VAC) 26 4 5800100215 F.E. Petro Smart Controller turbine control box 27 2 400137908 F.E. Petro Siphon Cartridge kit 28 2 402507930 F.E. Petro Secondary Siphon kit (onll one extra siphon needed for two tanks) 29 4 100-708 Jomar 2" Ball valves 30 4 246A-0600AV Morrison 2" swing check valves w/25PSI relief 31 6 FF20X18HMXM346 Flexing 2" x 18" MS x M Flex connector 32 2 578-0100AC Morrison Extractor pipe caps 33 2 184-2500MB Morrison Double tapped bushing 4" x 2" x 2" for siphoning tank together you will need double tap bushing with pipe drop tube into each tank. The vacuum from the secondary siphon will be connected to a tee at the highest end of the siphon.

34 2 233-4432 OPW Vent extractor 4x4x3x2 (FOR) 35 2 53VML-0120 OPW Ball float vent valve 36 6 012030-626-0 Smith 3" x 2" Sump entry fitting 37 6 012040-238-3 Smith 4" x 3" Concentric reducers 38 8 F-17-RR-D Bravo D/W FRP 3/4" Electrical conduit entry fitting 39 8 ADHESIVE-KIT-FS-10 Bravo Electrical fittings adhesive (requires double caulking gun)

Piping Transition Sumps - Generator/Boiler

40 1 B600-F4L-BD-AB Bravo D/W FRP four product Vent transition sump with hydrostatic 41 1 EO-EBS Bravo Electrical offset frame 42 4 FF20X12HMXM346 Flexing 2" x 12" MS x M Flex connector 43 4 012030-626-0 Smith 3" x 2" Sump entry fitting

2 Specification Section 33 56 10 Factory Fabricated Fuel Storage Tank 2

2 Submittal # 335610-01-092111 2

San Jose, CA 95112

(408) 998-8205 Fax (408) 998-8249

PME Equipment Sales 2190 Enterprise Blvd

West Sacramento, CA 95691

(916) 371-8271 Fax (916) 384-0298

PETROLEUM MARKETING EQUIPMENT

Corporate Office 740 Monroe Way

Placentia, CA 92870

(714) 577-7878 Fax (714) 577-7979

44 4 012040-238-3 Smith 4" x 3" Concentric reducers

Independent Fuel Level alarm panel and level switches

45 2 LC1003-11 Pneumercator Three channel alarm panel 46 2 LS600-3-SSH-8MB-XXX-L03 Pneumercator Three level float switch

3 Specification Section 33 56 10 Factory Fabricated Fuel Storage Tank 3

3 Submittal # 335610-01-092111 3

File details come from the government source that posted it. Updated .