Amendment_03_-_TJC_Inspections_-_23FEB2016.pdf
PDF 180 KB Posted
- Attached to
- Operation and Maintenance Services at the Camp Pendleton Hospital and Outlying Medical Clinics
- Solicitation number
- W912PL-16-R-0011
About this file
Amendment 03 - TJC Inspections - 23FEB2016
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Documentation required by the Hospital Accreditation program Life Safety (LS) and selected Environment of
Care (EC) standards is presented in the following pages. These documents will be reviewed by the Life
Safety surveyor upon their arrival for the on-site survey.
This tool is provided to organizations for use in their continuous compliance and survey readiness efforts.
Other EC and LS documents may be requested by surveyors their, as needed, throughout the survey.
Life Safety and Environment of Care - Document List and Review Tool
STANDARD
LS.01.01.01 C NC NA IOU Buildings serving patients comply with NFPA 101 (2000 edition)
EP 1 Individual assigned to assess LSC compliance
EP 2 Current e-SOC maintained
EP 3 Timely completion of PFIs
EP4 Documentation of inspections and approvals made by state or local AHJs
YES NO YES NO
EP 1
Alarms / sprinklers out of service 4 or more hrs in 24 hrs - Fire watch / Fire Dept.
notification
EP 2 Signs for alternate exits posted
EP 3 ILSM policy identifying when and to what extent ILSM implemented
EP 4 Daily inspection of routes of egress (See also 19.7.9.2 RE: daily inspections)
EP 5 Temporary but equivalent systems while system is impaired
EP 6 Additional fire fighting equipment provided
EP 7 Smoke tight non-combustible temporary barriers
EP 8 Increased surveillance implemented
EP 9 Storage and debris removal
EP 10 Additional training on fire fighting equipment
EP 11 Additional fire drill per shift per quarter
EP 12 Temporary systems tested and inspected monthly
EP 13 Additional training on bldg deficiencies, construction hazards, temp measures
EP 14 Training for impaired structural or impaired compartment fire safety features
COMMENTS:
Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
YES NO
DOCUMENT
Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
See Legend
NCCLS.01.02.01
COMMENTS:
Addressed in Policy? Implemt. as required?
Interim Life Safety Measures (ILSM)IOUNA
Page 2 9/18/15
EC.02.03.01 C NC NA IOU Hospital Manages Fire Risk - Fire Response Plan
EP 9 The hospital has a written fire response plan.
EP 10 The plan describes the specific roles of staff and LIPs at and away from fire.
*when and how to sound and report fire alarms,
* how to contain smoke and fire
*how to use a fire extinguisher, *how to evacuate to areas of refuge
COMMENTS:
EC.02.03.03 C NC NA IOU Fire Drills FREQUENCY 1st QTR 2nd QTR 3rd QTR 4th QTR/
Ann.
EP 1
Fire drills once per shift per quarter: Health Care and Ambulatory Health Care (If available, please provide five quarters of fire drill data) Quarterly
EP 2 Fire drills every 12 months from date of last drill: Business Occupancies Annually
EP 3 When quarterly fire drills are required, at least 50% unannounced. Quarterly
EP 4 Staff participate in the drills according to the hospital's fire response plan.
EP 5 Critiques include fire safety equipment & building features and staff response.
COMMENTS:
DOCUMENT
YES NO
See Legend
Page 3 9/18/15
EC.02.03.05 C NC NA IOU Fire Protection and Suppression Testing and Inspection FREQUENCY 1st QTR/
Semi 2nd QTR
3rd QTR/
Semi
4th QTR/
Ann.
EP 1 Supervisory Signals-"fire pump running & fire pump failure" trouble signals Quarterly
Water flow devices -- Deemed Hosptials and CAHs Quarterly
Water flow devices -- Non-Deemed Hospitals Semiannually
Tamper switches Semiannually
EP 3 Duct, heat, smoke detectors, pull boxes, elect. releasing devices Annually
EP 4 Notification devices (audible & visual) Annually
EP 5 Emergency services notification transmission equipment Quarterly
EP 6 Fire pump(s) tested - under no flow Weekly
EP 7 Water storage tank high & low level alarms Semiannually
EP 8 Water storage tank low water temp alarms (cold weather only) Monthly
EP 9 Sprinkler systems main drain tests on all risers Annually
EP 10 Fire department connections inspected (Fire hose connections N/A) Quarterly
EP 11 Fire pump(s) tested - underflow Annually
EP 12 Standpipe flow test every 5 years 5 years
EP 13 Kitchen suppression semi-annual testing Semiannually
EP 14 Gaseous extinguishing systems inspected (no discharge req) Annually
EP 15 Portable fire extinguishers inspected monthly Monthly
EP 16 Portable fire extinguishers maintained annually Annually
EP 17 Fire hoses hydro tested 5 yrs after install, every 3 yrs thereafter 5 yrs / 3yrs
EP 18 Smoke & fire dampers tested (fusible links removed when applicable) 4-6 years
EP 19 Smoke detection shutdown devices for HVAC tested Annually
EP 20 All horizontal & vertical roller & slider doors tested Annually
DOCUMENTSee Legend
COMMENTS:
EP 2
Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Page 4 9/18/15
EC.02.05.07 C NC NA IOU Emergency Power Systems are Maintained and Tested FREQUENCY
EP 1 Battery powered egress lights tested monthly - 30 seconds Monthly
EP 2 Battery powered egress lights tested annually - 90 minutes Annually
EP 3
Quarterly functional test of SEPSS for 5 min/class and
60% full duration of class annually Qtrly/Ann.
Note 1: Non-SEPSS tested per manufacturer's specifications. Per Mfg.
Note 2: SEPSS for critical areas and equipment tested monthly Monthly
Note 3: Class defines minimum time which SEPSS is designed to operate
EP 4 Generator load test monthly for 30 min under load (plus cool-down) Monthly
EP 5 Monthly load test 30% or exhaust gas temp or annual load bank 25/50/75% Monthly/Ann.
EP 6 All Transfer switches monthly/12 times per Yr. Monthly
EP 7 Generator load test once every 36 months for 4 hours 36 Months
EP 8 Generator 4 hour test @ at least 30% nameplate 36 Months
EP 9 If generator testing fails, review contingency & implement protective measures Per occurrence
EP 10 If load test fails retest after making repairs Per occurrence
EP 1
Test, inspect & maintain: master panels, area alarms, automatic pressure switches, shut-off valves, flexible connectors and outlets.
No prescribed frequency; recommend risk assessment if < annual.
EP 2
Review med gas installation/modification/breech certification results for:
cross-connection, purity and pressure As applicable
EP 3 Med gas supply and zone valves are accessible and clearly labeled On Bldg Tour
COMMENTS:
NO
YES NO / Missing Date
COMMENTS:
Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
THIS MAY BE SCORED AS CONDITIONAL OR STD
Per Policy
IOUNANCCEC.02.05.09 Medical Gas and Vacuum Systems are Inspected and Tested
YES
See Legend DOCUMENT REVIEW
Page 5 9/18/15
File details come from the government source that posted it. Updated .