Amendment_04_-_11_24_00_00_95_BUILDING_MAINTENANCE_EQUIPMENT-_2MAR2016.pdf

PDF 8 MB Posted

Attached to
Operation and Maintenance Services at the Camp Pendleton Hospital and Outlying Medical Clinics
Solicitation number
W912PL-16-R-0011
Issued by

About this file

Amendment 04 - 11 24 00 00 95 BUILDING MAINTENANCE EQUIPMENT- 2MAR2016

View the file

Other files

File Type Posted
Correct_Amendment_06_-_NHCP_PWS_-_18MAR2016-2.docx DOCX document
Am7_W912PL-16-R-0011.pdf PDF
Amendment_06_-_Updated_-_Service_Contract_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_NHCP_Fuel_Storage_Tanks_-_FIO.pdf PDF
Amendment_06_-_Revised_Section_M_-_17MAR2016.pdf PDF
Amendment_06_-_Updated_-_Davis-Bacon_Wage_Rates_-_17MAR2016.pdf PDF
Amendment_06_-_NHCP_PWS_-_17MAR2016.pdf PDF
Amendment_06_-_Exhaust_hoods-PM_only-_FIO.pdf PDF
Amendment_06_-_FuelFilteringSystem_-_FIO.pdf PDF
Amendment_06_-_W912PL-16-R-0011_-17MAR2016_.pdf PDF
Amendment_05_-_Revised_Section_L_-_3MAR2016.pdf PDF
Amendment_05_-_W912PL-16-R-0011_-_3MAR2016_.pdf PDF
Amendment_04_-_NURSE_CALL_SYSTEMS_-_2MAR2016.pdf PDF
Amendment_04_-_Section_M_-_2MAR2016.pdf PDF
Amendment_04_-_H-200_EXTERIOR_ELEVATIONS_-_2MAR2016.pdf PDF
Amendment_04_-_FY14_Backflow_Inventory_List_H-200_and_Clinics_-_2MAR2016.xls XLS spreadsheet
Amendment_04_-_Landscaping_areas_-_2MAR2016.pdf PDF
Amendment_04_-_Amalgam_Separator_-_2MAR2016.pdf PDF
Amendment_04_-_W912PL-16-R-0011_-_2MAR2016_.pdf PDF
Amendment_04_-_Property_Record_Information_-_2MAR2016.xlsx XLSX spreadsheet
Amendment_03_-_PART_XIII_ConstructionSpecifications_Complete_-_23FEB2016.pdf PDF
Contractor_Sign_in_Sheet_20FEB2016.pdf PDF
Amendment_03_-_Government_Furnished_Equipment_-_23FEB2016.pdf PDF
Amendment_03_-_Floor_Plan_14_Area_Trailer_-_23FEB2016.pdf PDF
Amendment_03_-_Med_Gas_Test_Report_-_23FEB2016.pdf PDF
Amendment_03_-_Appendix_A_-_Mechanical_Equipment_Inventory_-_25FEB2016_.xlsx XLSX spreadsheet
Amendment_03_-_Revised_Section_L.pdf PDF
Amendment_03_-_Revised_Section_B.pdf PDF
Amendment_03_-_Work_Request_Summary_Report_Jan_2014_-_Dec_2015.xls XLS spreadsheet
Amendment_03_-_NHCP_PWS_-_25FEB2016.pdf PDF
Amendment_03_-_PM_Frequency_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_Galley_Refrigerators_and_Freezers_-_23FEB2016.pdf PDF
Amendment_03_-_TJC_Inspections_-_23FEB2016.pdf PDF
Amendment_03_-_Hospital_Clinic_List_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_H200_Tree_Inv_-_23FEB2016.pdf PDF
Amendment_03_-_FMD_Construction_Package_-__23FEB2016.pdf PDF
Amendment_03_-_Revised_Section_C.pdf PDF
Amendment_03_-_NHCP_Active_RPIE_-_23FEB2016.xlsx XLSX spreadsheet
Amendment_03_-_W912PL-16-R-0011_-_25FEB2016_.pdf PDF
Amendment_03_-_Revised_Section_M.pdf PDF
Amendment_02_-_W912PL-16-R-0011-_23FEB2016.pdf PDF
W912PL-16-R-0011-_Am01_.pdf PDF
Attachment_7_-_DB_Wage_Determinations_20JAN2016.pdf PDF
Attachment_8_-_SCA_Wage_Determinations_19JAN2016.pdf PDF
A.01.30_-_Attachment_2_-_Facility_Overview_-_21JAN2016.pdf PDF
A.01.30_-_Appendix_C_-_Personnel_Resume_Form_-_26JAN2016.docx DOCX document
A.01.30_-_Attachment_4_-_13th_Edition_Glossary_-_21JAN2016.pdf PDF
A.01.30_-_Attachment_6_-_RSMEANS_San_Diego_Cost_Index_-_21JAN2016_.pdf PDF
Solicitation_-_W912PL-16-R-0011_-_27JAN2016.pdf PDF
A.01.30_-_Attachment_1_-_Map_NHCP_and_CLINICS_-_21JAN2016.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

fruiztat Text Box

11 24 00.00 95 BUILDING MAINTENANCE EQUIPMENT

PROBEL

OMSI PART III: CONSTRUCTION SUBMITTALS

FINAL SUBMITTAL

BUILDING: H-200

NAVAL HOSPITAL CAMP PENDLETON

MARINE CORPS BASE CAMP PENDLETON

STATION PROJECT NO. : P-1653

CONTRACT NO.: N62473-10-C-0001

PREPARED FOR: NAVFAC SOUTHWEST

PREPARED BY: CLARK/McCARTHY, A JOINT VENTURE

MOetting

TOC

fruiztat

Table of Contents

SD-02 - Shop Drawings

SD-03 - Product Data

SD-10 - Operation & Maintenance Manuals

SD-02 Shop Drawings

SD-03: Product Data

PRO-BEL ENTERPRISES LIMITED

Window Cleaning/

Suspended Maintenance Equipment & Fall

Protection Systems

S U S P E N D E D E Q U I P M E N T & F A L L P R O T E C T I O N E X P E R T S

Head Off ice 765 Westney Rd S, Ajax ON CANADA L1S 6W1 [ t ] 905.427.0616 [ tf] 800.461.0575 [ f ] 905.427.2545 [e] in fo@pro-bel .ca

Cal i forn ia Off ice 29320 Union City Blvd, Union City, CA USA 94587 [ t ] 510.477.9666 [ tf] 1 .866.577.6235 [ f ] 510.477.9555 [e] in fo@pro-bel .ca

Western Off ice #103-350, East Kent Ave S Vancouver, BC CANADA V5X 4N6 [ t ] 604.687.1301 [ f ] 604.687.1306 [e] in fovan@pro-bel .ca

S A F E T Y & T I E - B A C K A N C H O R S Pr o- Be l E nt er pr is es

M

AI

N

TE

N

AN

C

E

EQ

U

IP

M

EN

T Li m ite d w in do w w as hi ng s ys te m s

EXPLANATION

A fundamental concept in the use of maintenance contractor supplied conven-tional suspended access equipment such as bosun’s chair, single work cage or platform is that there must be two inde-pendent means of support for each worker using the equipment.

The first means of support is the access equipment itself tied back to an anchor.

The second is usually provided by a sep-arate fall arrest system consisting of a:

• full body harness;

• lanyard (with shock absorber);

• mechanical rope grabbing device;

• lifeline;

• lifeline anchor.

In addition, anchors, which are used for tie-backs or for securing lifelines, are also an effective, practical means for directly securing a bosun’s chair with descent control equipment, the most popular method of window cleaning today (direct rigging).

Bosun’s chair is the equipment of choice among window cleaners. Pro-Bel safety anchors (see photo at right) are used to secure chair and separate lifeline.

A-2

Typical rigging and fall arrest requirement scenarios using Pro-Bel safety lifeline and tie-back anchors.

Pro-Bel safety anchors may be used for securing lifeline, for tie-back of primary rigging equipment or to directly rig a bosun’s chair.

LIFELINES

SUSPENSION

LINE

SAFETY ANCHOR

FOR SERVICING

VIDEO CAMERA

CARPET

STRIP

PRIMARY

SUSPENSION

LINE

BOSUN’S

CHAIR

BOSUN’S

CHAIR

SINGLE

WORK

CAGE POWERED

PLATFORM

PRIMARY

SUSPENSION

LINE

LIFELINE

LIFELINE

PRO-BEL ROOF

ANCHORS

PRO-BEL ROOF

ANCHORS

TIE-BACK

TIE-BACK

OUTRIGGER BEAM WITH

COUNTERWEIGHTS

PRO-BEL

WALL ANCHORS

PRIMARY

SUSPENSION

LINE

PARAPET

WALL

CLAMP

The chair is rigged directly to an anchor in line with the point of suspension. A sep-arate independent anchor on the roof is required to secure the worker’s fall arrest lifeline.

All Buildings Require Roof Anchors Extract From ANSI/IWCA I-14.1 Window Cleaning Safety Standard:

4.1.1 All buildings where window clean-

ing is performed that employ suspended equipment shall be equipped with roof anchorages or other approved devices which will provide for the safe use of the equipment in conformance with the pro-visions of this Standard.

S A F E T Y & T I E - B A C K A N C H O R S

DESCRIPTION

Note: Pro-Bel tie-back/lifeline anchors and direct rigging anchors are the same and are used interchangeably.

Safety Anchor Types There are literally dozens of Pro-Bel safety anchor products available. Each has been engineered to satisfy a particu-lar job requirement. They can be catego-rized as follows:

PB and PBE Series Wall Anchors PB wall anchors are fabricated using a patented stainless steel U-bar which is detachable for ease of replacement, con-crete forming and waterproofing. PBE anchors are a more economical alterna-tive to PB anchors and are used when flashing or waterproofing is not a consid-eration.

PBE Series Roof Anchors PBE Series anchors have a non-detach-able stainless steel U-bar and are flashed using a spun aluminum flashing sealed at the top with a heat-shrink rubber collar flashing.

PB Series Roof Anchors PB Series anchors, somewhat more expensive than PBE Series anchors, are fabricated using a patented stainless steel U-bar and stainless steel cap flash-ing which is detachable for ease of replacement.

USE

ANSI/IWCA I-14.1 (3.9 Anchorages) states that “Building owners and window cleaning contractors shall not allow sus-pended work to be performed unless it has determined that the building has pro-vided, identified and certified anchorages complying with Section 9 or 10 for: inde-pendent safety lines; tie-backs for outrig-gers, parapet clamps and cornice hooks;

primary support anchorages for powered and manual boatswain’s chairs; primary support anchorages for rope descent systems; horizontal (rope) lines or life-lines; and wherever else required.” Pro-Bel roof anchor set into concrete pier

(PB70).

Pro-Bel PB type wall anchor in concrete wall of rooftop mechanical room.

Pro-Bel wall anchor recessed in box flash-ing (PB71S).

Pro-Bel PB type steel pier roof anchor with detachable cap and aluminum flashing.

A-3

Pro-Bel PBE type roof anchor with alu-minum flashing and heat-shrink rubber collar flashing.

Pro-Bel “flip-up” terrace anchor con-cealed with cut out core trimmed with stainless steel band and tabs.

F a l l P r o t e c t i o n S y s t e m s

FEATURES

All corrosion resistant materials;

anchor components are stainless steel and/or hot dipped galvanized steel.

Standards conformance; all anchors comply with OSHA and ASME/ANSI/ IWCA safety requirements for window cleaning, and various materials stan-dards.

Installation flexibility; Pro-Bel safety anchors are suited to a broad range of building structures, including concrete, structural steel or precast panels.

Securement methods include cast-in-place, through bolts, bolt around, weld-ing, or chemical epoxy fastening.

Engineer certified; OSHA and ANSI/ IWCA I-14.1 requires that safety anchor-ing devices be designed by or under the direction of a registered professional engineer experienced in such design.

Pro-Bel safety anchors meet this criteria and anchor performance is based on data derived from testing and/or engi-neering calculations. Anchors have been tested to ensure fracture or detachment does not occur with the application of a 5,000 lb (22.2 kN) load in any direction.

Compatible with roofing; Due to strin-gent OSHA anchor placement require-ments i.e. in line with the point of sus-pension and free fall distance, anchors, for the most part, must necessarily be placed on the roof. An important consid-eration in the design of Pro-Bel anchor products is the need to maintain the long term watertight integrity of the building.

Pro-Bel products are designed with a full understanding of reliable flashing/sealing techniques to satisfy any roof condition.

Where anchors are located in water-proofed areas of a roof, a pier is normal-ly provided to elevate the anchor above the waterproofing. In the case of metal pier anchors, the pier is supplied with the anchor and a prefabricated flashing to suit roof type as required. With concrete pier anchors, the pier must be formed, the anchor cast in, and the flashing fabri-cated at the job site.

Sole responsibility; Pro-Bel provides complete fall protection products/sys-tems from concept to the supply and installation of same, including annual inspection.

Specific liability insurance; all Pro-Bel davit installations automatically carry $5,000,000.00 + coverage against prod-uct/ system failure (over 5000 projects successfully completed to date).

MATERIALS/FABRICATION

(as applicable)

U-bar, anchor bolts, detachable caps:

Type 304 stainless steel with yield strength of 42 Ksi (290 MPa) or mild steel to ASTM A36, Type 350W with yield strength of 43 Ksi (297 MPa), hot dipped galvanized to ASTM A123/A123M-2002.

Hollow steel section (HSS) piers: gal-vanized mild steel as above with yield strength of 50 Ksi (345 MPa), with or without urethane foam insulation.

Plate and all other sections: galva-nized mild steel as above with yield strength of 43 Ksi (297 MPa).

Seamless spun aluminum flashing (for steel pier anchors): Type 6061-T6 alloy to ASTM B221-2000 with deck flange flashed in using felt plies to NRCA or CRCA recommendations or roofing membrane manufacturer’s instructions, as applicable.

Top of anchor sealing (for steel pier anchors): torch applied heat-shrink rub-ber collar flashing or detachable U-bar complete with stainless steel watertight cap.

Bolts, nuts and washers: Type 304 stainless steel or galvanized steel to

ASTM A325.

Note: Illustrated on the next few pages are only some of the many model varia-tions of anchor products available.

Anchors can be engineered to satisfy vir-tually any access requirement.

A-4

Worker above uses Pro-Bel “Hands-Free” horizontal lifeline cable to safely access recessed windows as well as custom ledge-mounted Pro-Bel safety anchors (one for bosun’s chair and one for lifeline) for” drops” below.

Pro-Bel wall anchor bolted to steel beam supporting rooftop AC chiller unit.

Minimum anchors; OSHA and ANSI/ IWCA I-14.1 requires that equipment tie-backs be “installed at right angles to the face of the building whenever possible”.

This requirement, can result in an unnecessary number of installed anchors. Pro-Bel has developed anchor placement chart data to help designers locate anchors to suit tie-back and life-line requirements. This data ensures compliance with OSHA fall protection criteria while reducing the number of anchors (and roof penetrations) required.

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

Note Re: Alternative Finish to Galvanizing. For all anchor bases and supports, Pro-Bel offer a superior protective coating _ Protex _ in lieu of galvanizing if desired. Pro-Bel Protex is a 3/32” (2.4 mm) thickness, black colored, two component spray on, flexible 100% solids ther-moplastic (TPU) polyurethane/polyurea system. Protex provides exceptional impact and abrasion resistance and is factory applied via high pressure impingement mix polyurethane dispensing equipment. See Pro-Bel Protex Technical Data Sheet # R-2 for complete information.

A-5

Terrace application shows how a series of Pro-Bel stainless steel “flip-up” anchors can be completely concealed with pavers when not in use.

Anchors are arranged to suit both bosun’s chair and suspended platform applications.

Series of Pro-Bel wall anchors bolted to structural con-crete parapet, used to secure a bosun’s chair suspension line and workers’ lifeline (interchangeable).

Window cleaners preparing to launch a contractor supplied platform over a parapet wall using Pro-Bel davits with rotating heads. Steel cables are used to suspend the platform while workers are tethered to independent Pro-Bel roof anchors with rope lifelines.

TESTING*

Testing of Pro-Bel wall and roof anchors involve a variety of both shop and on-site test methods including static, dynamic and destructive procedures. All testing is car-ried out by independent testing agencies or under the direction of a professional engineer in accordance with recognized standards.

Anchors secured using epoxy adhesive are tested to 5000 lbs (22.2 kN) to ensure against failure. The photos on this page provide an overview of Pro-Bel test pro-cedures.

* Test data available upon request.

The static load test in the above photo, which applies force using a heavy duty cable come-along, was conducted to show that Pro-Bel wall and roof anchors comply with stan-dards that require the anchors be capable of resisting without fracture and/or pull-out a force of 5000 lbs (22.2 kN). A similar test is performed on-site to verify strength of epoxy adhesive roof anchors.

Pro-Bel wall anchors secured to structural concrete using epoxy adhesive are load tested on-site using a hydraulic pull tester to verify strength and anchor bolt integrity.

Photo shows 8’-0” (2440 mm) high apparatus used for shock (drop) testing of Pro-Bel safe-ty U-Bar anchors. A 220 lb. (100 kg) weight was connected to the anchor using a steel test lanyard and dropped a distance of 4’- 0” (1220 mm). A series of anchors employing different securements were tested and peak forces up to 18,522 lbs (8400 kg) were gener-ated without fracture to any part of the anchors.

A series of Pro-Bel safety U-Bar anchors were tested to determine their ultimate strength (destructive testing). The force used to break the test specimens was pro-vided by a hydraulic system, a hooking mechanism, and support structure. The highest pressure recorded just before a specimen was broken in this series of tests measured 32,445 lbs (4500 psi * 7.210 in2).

A-6

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

PRO-BEL MODEL # PB71S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. STAINLESS STEEL OR GALVANIZED BOLT;

3. HEAVY DUTY HEX NUT & LOCK WASHER;

4. GALVANIZED STEEL BACK PLATE.

RECESSED, CAST-IN-PLACE

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

6” (150 mm) MIN 6” (150 mm) MIN

6” (150 mm) MIN

6” (150 mm) MIN

7- 1/

2” (1 m m

4” (100 mm)

CAST-IN-PLACE

PRO-BEL MODEL # PB69S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. S.S. LOCK WASHER AND NUT

3. STAINLESS STEEL CAST-IN-PLACE ROD;

4. FORMING NUT.

5. GALVANIZED STEEL BACK PLATE.

4 5

EPOXY ADHESIVE BOLTS

PRO-BEL MODEL # PB48S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. LOCK WASHER AND NUT;

3. EPOXY ADHESIVE ANCHOR BOLTS

PRO-BEL MODEL # PBE68:

1. REINFORCING ROD TIES BY OTHERS;

2. STAINLESS STEEL RECESSED BOX TYPE

SAFETY ANCHOR;

3. S.S. FORM NAILING FLANGE

PRO-BEL MODEL # PB93S-A

1. STAINLESS STEEL U-BAR SAFETY ANCHOR; 2. S.S. OR GALVANIZED BOLT, EXPOSED

THREADS TO BE DEFORMED AFTER INSTALLATION; 3. STEEL REINFORCING c/w STEEL BASE

PLATE TO SUIT; 4. HEAVY DUTY HEX NUT & LOCK WASHER; 5. EPOXY ADHESIVE ANCHOR

BOLTS.

THROUGH-BOLT

6” (150 mm) MIN

REINFORCED WALL ANCHOR WITH EPOXY ADHESIVE BOLT SECUREMENT AT FLOOR

BACK PLATE

WALL ANCHOR SECUREMENTS

A-7

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

THROUGH-BOLT

PRO-BEL MODEL # PB73-SDC1:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. SEAMLESS SPUN ALUMINUM FLASHING;

3. GALVANIZED STEEL PIER;

4. HEAT SHRINK RUBBER COLLAR FLASHING;

5. STAINLESS STEEL HEAVY DUTY HEX NUT &

LOCK WASHER;

6. GALVANIZED STEEL BACK PLATE;

7. S.S. TREADED ROD

PRO-BEL MODEL # PBE74-00A4-S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR

2. GALVANIZED STEEL PIER c/w BASE PLATE;

3. SEAMLESS SPUN ALUMINUM FLASHING;

4. HEAT-SHRINK RUBBER COLLAR FLASHING;

5. STAINLESS STEEL BOLTS c/w PLATES

WELDED TO BOLTS.

PRO-BEL MODEL # PBE75-S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. GALVANIZED STEEL PIER;

3. HEAT-SHRINK RUBBER COLLAR FLASHING;

4. SEAMLESS SPUN ALUMINUM FLASHING;

5. EXISTING METAL DECK;

6. FLAT STOCK DECK CLOSURE PLATE

(OPTIONAL)

PRO-BEL MODEL # PBE76-S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. GALVANIZED STEEL PIER c/w BASE PLATE;

3. GALVANIZED STEEL BOLTS;

4. HEAT-SHRINK RUBBER COLLAR FLASHING;

5. SEAMLESS SPUN ALUMINUM FLASHING;

6. EXISTING METAL DECK

7. FLAT STOCK DECK CLOSURE PLATE

(OPTIONAL);

8. STEEL BACK PLATE;

9. HEAVY DUTY HEX NUT & LOCK WASHER.

PRO-BEL MODEL # PBE76-S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. GALVANIZED STEEL PIER c/w BASE PLATE;

3. GALVANIZED STEEL BOLTS;

4. HEAT-SHRINK RUBBER COLLAR FLASHING;

5. SEAMLESS SPUN ALUMINUM FLASHING;

6. STEEL BACK PLATE;

7. HEAVY DUTY HEX NUT & LOCK WASHER.

PRO-BEL MODEL # PBE78-S:

1. STAINLESS STEEL U-BAR SAFETY ANCHOR;

2. GALVANIZED STEEL PIER c/w BASE PLATE;

3. SEAMLESS SPUN ALUMINUM FLASHING;

4. HEAT-SHRINK RUBBER COLLAR FLASHING;

5. EPOXY ANCHOR BOLTS.

I-BEAM

I-BEAM

EPOXY ADHESIVE BOLT

WELDMENT WRAPPING I-BEAM WRAPPING CONCRETE JOIST

CONCRETE

JOIST

ROOF ANCHOR SECUREMENTS

A-8

5”

8” (2 m m ) M

IN

8” (2 m m ) M

IN

8” (2 m m ) M

IN

8” (2 m m ) M

IN

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

CAST-IN-PLACE

8” (2 m m ) M

IN

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

8” (2 m m ) M

IN

PRO-BEL ROOFTOP SUPPORTS

Application Recommended for use in new construction or retrofit applica-tions where it is necessary or desirable to conceal the anchor when not in use i.e. terrace, balcony or roof deck locations. Pro- Bel flip-up and recessed anchors are designed to suit all roof conditions including cast-in-place and weldment applications.

Application Ideal for use in new construction for exposed concrete bal-conies where it is desirable to directly rig a bosun’s chair over a balcony rail. If the rail cannot accommodate the loads, outrigger beams may be employed for exterior maintenance using a ground rigged platform. The embed anchor (con-nector) is removed and capped flush when not in use.

Pro-Bel galvanized steel pipe support complete with U-Bar safety anchor.

Pro-Bel also manufactures a complementary line of rooftop supports for pipes, satel-lite dishes, catwalks, cellular towers, antenna, guy wire securement, air conditioning units and similar equipment. These supports can be supplied as stand alone items or combined with U-bar safety anchors and are secured and flashed in using the same reliable methods employed for Pro-Bel anchors. For further information contact a Pro- Bel representative. 4

I-BEAM

VA

R

IE

S

PRO-BEL MODEL # PB75-HP1 PIPE SUPPORT:

1. GALV. STEEL PIPE SADDLE;

2. THREADED GALV. ROD;

3. GALV. ROD DRILLED & TAPPED;

4. GALV. ANCHOR CAP;

5. TAMPERPROOF PIN;

6. SUPPORT BASE SECUREMENT BOLT;

7. GALV. STEEL SUPPORT BASE;

8. S.S. OR GALV. U-BAR SAFETY ANCHOR.

A-9

1/4” (6 mm)

Anchors are designed to a maximum fall arresting force of typi-cally 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any permanent deformation and to 5000 lbs (22.24 kN) against fracture or detachment.

Anchors are designed to a maxi-mum fall arresting force of typically 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any perma-nent deformation and to 5000 lbs (22.24 kN) against fracture or detach-ment.

Anchor in terrace deck.

Paver cutout conceals anchor when not in use.

NOTE: WHEN THE ANCHOR IS COMPLETELY RECESSED BELOW

THE PAVER. THE PAVER CAN BE CORED OUT AND THE CORE CAN

BE USED AS A CAP.

PRO-BEL MODEL # PB96-RP2 “FLIP-UP”

ROOF ANCHOR

2- 1/

2” (6 m m

STEEL LOCK WASHER

& HEAVY DUTY HEX NUT

PRIMED STEEL HSS

REINFORCEMENT

STAINLESS STEEL

THREADED ROD

EXISTING

COMPOSITE DECK

PIVOTING STAINLESS STEEL

U-BAR ANCHOR

STOP LUG

STEEL BASE PLATE

METAL

COVER CAP

EXISTING PAVERS

STAINLESS STEEL ANCHOR

SECUREMENT LUG

RECEIVER

D-CUP

CONNECTOR

RE-BAR

INSERT

CONCRETE

BALCONY

CARPET

PROTECTION

RAILING

DETENT-

TYPE

CONNECTOR

NOT-IN-USE

PLUG

PRO-BEL MODEL # PB97 HEAVY DUTY DETENT-TYPE

CONCRETE EMBED ANCHOR

SUSPENSION LINE

FOR BOSUN’S CHAIR

DESIGN CONSIDERATIONS

Roof Space: Conventional (non-perma-nent) outrigger beams employing coun-terweights, when used with descent con-trolled bosun’s chair, single work cage or platforms are normally supported to clear a low non-structural parapet wall. Con-ventional outrigger beams are typically 12’-0” to 15’-0” (3658 mm to 4572 mm) long and have a reach of 3’-0” (915 mm) or less beyond the roof edge. They require sufficient space on the roof to accommodate the inboard portion of the beam and the tie-back.

Parapet Strength: If the parapet wall is structurally sufficient, a parapet wall clamp may be secured to the wall for the suspension of access equipment.

Also, a bosun’s chair can be directly secured to a safety anchor. This is known as direct rigging. The chair is rigged directly to wall or roof anchors in line with the point of suspension, and the primary synthetic rope suspension lines are nor-mally protected at the parapet using con-tractor supplied carpet or other anti-abra-sion protection devices.

When the parapet is not capable of sup-porting the applied loads, primary sus-pension support equipment such as out-rigger beam dollys or davits must be con-sidered. See Pro-Bel Outrigger Beam Systems or Davit Systems literature.

Parapet Height: Anchors can be installed in parapet walls provided walls meet the following criteria:

Wall is 42” (1067 mm) minimum guardrail height;

Wall has been engineered to take the applied loads.

Structural loads: Anchors are designed to a maximum fall arresting force of typi-cally 1800 lbs (8.0 kN) when wearing a body harness with a safety factor of 2 without any permanent deformation and to 5000 lbs (22.24 kN) against fracture or detachment.

Free Design Service: The selection of window cleaning equipment is a perfor-mance oriented and highly specialized field requiring an in-depth knowledge of Rigging Methods, Safety and OSHA Standards/State Codes. Pro-Bel provides a free design service to ensure that Pro- Bel systems are properly specified.

Pro-Bel portable outrigger with beam dolly is ideal for clearing non-structural parapet.

Note separate pier- type safety anchors for securing lifelines. See Pro-Bel Outrigger Beam Systems literature.

This photo shows a Pro-Bel roof anchor installation. Anchors are welded to struc-tural steel before a horizontal lifeline cable system is installed to provide fall protec-tion on this arched roof.

Pro-Bel portable aluminum ground rigged davit arms are ideal for clearing non-struc-tural parapets or reaching out past build-ing face obstructions. See Pro-Bel Davit Systems literature.

1.

2.

Location of Lifeline Anchors: The location of lifeline anchors relative to tie-back anchors must be such that a work-er can neither fall more than 6’-0” (1.8 m), nor contact any lower level (OSHA 1910.66, Subpart F and ANSI/IWCA I-14.1, section 9.2.2 (g) 2). See Layout data on page A-12.

A-10

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

ANCHOR LAYOUT PROCEDURE

1. Review the Pro-Bel System & Equipment Introduction literature (pages G-6 to G- 18). This data provides an overview of the various equipment options used to clean windows or perform other suspended build-ing maintenance.

2. Identify all roof levels. Mark window loca-tions on other areas requiring access on the architectural roof plan drawing(s).

3. Examine building section drawings to assess construction of parapet wall, mechanical room wall and roof assembly or other building elements as necessary.

4. Examine roof structural drawings for possi-ble anchorage locations.

5. Examine building elevations or other draw-ings to identify any setbacks, recesses or other unusual features.

6. Review the Design Considerations on page A-10 to assist in making a "rigging" deci-sion.

7. If it has been determined that "rigging" is suited to using anchors only, for both the support of primary suspension equipment and lifelines, refer to Anchor Spacing Chart at right on page A-12.

Note: Primary suspension equipment refers to conventional, maintenance contractor supplied equipment i.e. bosun's chair, transportable out-rigger beams, single work cage, temporary platform and parapet wall clamps.

ANCHOR PLACEMENT

1. After determining what areas of the build-ing face will need to be accessed for main-tenance, anchor locations can now be cho-sen.

2. Anchors are located on the roof of the building and are generally secured to any or all of the following acceptable vertical or horizontal elements: mechanical room curb walls; parapet walls minimum 42" (1067

mm) high; roof mounted structural ele-ments e.g. rooftop equipment structural support beams or columns, and similar structures; roof decks (to concrete slab, precast deck, structural steel, and similar structures); finished roof top terraces.

3. Ideally locations for Pro-Bel safety anchors are in direct line with the anticipated "drops" and are suited to both bosun's chair and suspended platform. A "drop" for a chair is typically a 6'-0" (1830 mm) wide area, and 20'-0" to 28'-0" (7000 mm to 8535 mm) for a platform. Two anchors are required for bosun's chair (1 primary and 1 lifeline) and 4 anchors are required for a platform (2 primary and 2 lifeline).

4. Lifeline anchors and primary tie-back anchors for transportable outrigger beams and parapet wall clamps should be located in line with the point of suspension (per-pendicular) whenever practical, but should not be offset more than 10'-0" (3084 mm) measured horizontally from running at a right angle to the building face at the point of suspension. The angle created by the offset distance should not exceed 25º. See anchor spacing chart data on page A-12.

5. If a bosun's chair or similar single point suspension equipment is used with the pri-mary support lines directly attached to anchors (direct rigging), the horizontal por-tion of the descent line (that portion of the support from the anchor to the roof edge) should be in a plane at right angles to the face of the building at the "drop". This guideline will ensure that slide distance and swing action in the event of a fall will be reduced to a reasonably safe minimum thereby lessening the potential for worker collision injury, while allowing for self-recovery.

Essentially, OSHA 1910.66, Subpart F and ANSI/IWCA I-14.1, section 9.2.2 (g) 2 requires personal fall arrest systems be rigged such that an employee can neither free fall more than 6'-0" (1.8 m), nor contact any lower level. Any anchor placement sce-nario should reflect this requirement.

ROOF PLAN / ANCHOR LAYOUT SHOWING TYPICAL CHAIR AND PLATFORM DROPS

TYPICAL CHAIR DROP

TYPICAL PLATFORM DROP

MAIN ROOF

STAIRWELL

ROOF

MECHANICAL

ROOM

Weld to Structure

Bolt Through Wall Epoxy Adhesive Bolts

Typical Anchor Layout Plan

Adhesive Roof Anchor

A-11

ANCHOR PLACEMENT (continued)

6. Locate the very first roof anchor, which should be a primary suspension or tie-back anchor. If the parapet wall is less than 42" (1067 mm) guardrail height, this anchor should be a minimum of 6'-0" (1830 mm) distance from the parapet so that the work-er can tie off whenever the worker has to step within 6'-0" (1830 mm) of an unguard-ed edge. If the parapet is minimum 42" (1067 mm) high, the anchor can be located any distance inside the parapet.

7. The second and subsequent primary sus-pension or tie-back anchors can now be located as per item 3.

8. After primary anchors have been located, lifeline anchors can now be located relative to the primary anchors using the anchor spacing chart data at right.

9. Anchor spacing must be adjusted, of course, to circumvent any obstruction.

Note: Pro-Bel tie-back/lifeline anchors and direct rigging anchors are the same and are used interchangeably.

A-12

RELATIVE SPACING BETWEEN PRIMARY SUSPENSION ANCHOR AND LIFELINE ANCHOR

The anchor spacing data shown below indicates recommended spacing of fall arrest safety anchors relative to primary suspension or tie-back anchors.

Plan View of Roof Showing Rigging In Line with Anchors

DEPTH MAXIMUM SPACING

U.S./Imperial U.S./ImperialMetric (mm) Metric (mm)

10’-0”

9’-0”

8’-0”

7’-0”

6’-0”

5’-0”

21’-5” 6528

19’-4”

17’-2”

15’-1”

12’-11”

10’-8”

ANCHOR SPACING CHART

This narrow roof area requires anchors on 5’-0” (1830 mm) cen-ters. See Anchor Spacing Chart below.

Pro-Bel roof anchors welded to beams before steel deck is installed.

ANCHORS

ARE WITHIN

FALL ARREST

LIFELINE

ZONE

WINDOW

BOSUNS CHAIR

D

EP

TH

(S

EE

C

H

AR

T

BE

LO

W

25º MAX

INDEPENDENT

FALL ARREST

LIFELINE ANCHOR

LANYARD LENGTH 4’-3” (1295 mm) MIN.

OUTSIDE FACE OF

PARAPET WALL OR

BUILDING

MAXIMUM SPACING

PRIMARY SUSPENSION

EQUIPMENT ANCHOR

PRIMARY SUSPENSION LINE

(FOR DIRECT RIGGING OF

BOSUN’S CHAIR OR TIE-BACK

OF OUTRIGGERS FOR SINGLE

MAN CAGE OR PLATFORM).

LOCATE ANCHORS IN ACCOR-

DANCE WITH THE ANCHOR

SPACING CHART BELOW SO AS

NOT TO EXCEED AN ANGLE OF

25º, TO ENSURE THAT PRIMA-

RY SUPPORT LINES, TIE-BACK

LINES AND LIFELINES ARE

RIGGED WITHIN THE 15º OFF-

SET ANGLE RECOMMENDED IN

ANSI/IWCA I-14.1.

When rigging primary lines, tie-back lines and lifelines for a bosun’s chair, single work cage or platform, there are many scenarios having an influence on whether lines are anchored in line with or offset from the point of suspension. Ultimately, the object is to place the anchors in a man-ner that will suit chair and platform loca-tions within the variable work zones while ensuring that the OSHA maximum free fall distance of 6’-0” (1.8 m) is not exceeded, in the event of a worker falling.

Recognizing this, Pro-Bel designers employ a 25O angle placement criteria for locating anchors. This criteria will ensure that the primary support lines and secondary lifelines are rigged within 15O of the point of suspension in accordance with the ANSI/IWCA I-14.1 Window Cleaning Safety Standard.

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

15º

90º

1. Small area of roof covering is removed down to concrete deck.

2. Holes are drilled into or through concrete deck to accommodate roof anchor bolts.

6. Close-up of anchor. Installation method is similar for both conventional roof (mem-brane above insulation) and protected membrane roof (membrane below insulation).

4. Watertight integrity of roof is restored using spun aluminum flashing and new roof covering (roof patch). Photo shows protected membrane roof.

5. Top of spun aluminum flashing is sealed to steel anchor using a conformable mas-tic tape and heat-shrink rubber collar flashing.

3. Anchor is installed using either bolt-through or chemical adhesive securement depending on access from below.

Pro-Bel PBE Series roof anchors installed in single ply roof.

A-13

EXAMPLE INSTALLATION _ RETROFIT ROOF ANCHORRELATED DATA

For general data relating to all Pro-Bel products and services e.g. codes, instal-lation, warranty, etc., refer to the Pro-Bel System & Equipment Introduction litera-ture (pages G-2 to G-32). For product data relating to other fall protection sys-tems and primary suspension equip-ment, see other Pro-Bel literature.

OTHER USES

Generally, Pro-Bel window cleaning/sus-pended maintenance anchor systems are economical or practical for all new or retrofit buildings 3 stories and higher where windows or building facades are accessed from the roof.

In addition to window cleaning applica-tions, Pro-Bel safety anchor systems are recommended for work such as:

• construction, restoration, cleaning, sandblasting, caulking, or pointing;

• fall protection for ladder work using full body harness and lanyard; and

• interior or exterior industrial applica-tions wherever maintenance personnel are exposed to falls from elevation.

Pro-Bel safety anchor systems are com-patible with all types of suspended main-tenance equipment and can be used interchangeably for either tying off sus-pended equipment or fall protection life-lines.

BUILDING OWNER ASSURANCE

There is a shared responsibility between the building owner and the window clean-ing/suspended maintenance contractor/ employer . OSHA and ANSI/IWCA I-14.1 acknowledges that the building owner is the controlling influence and must assure the contractor that the system has been installed in accordance with engineered drawings, test data (when required), and equipment specifications. The building owner shall provide written assurance that the installation has been annually inspected and maintained to ensure that all equipment is safe and operating as required.

Refer to Pro-Bel “Digest for Building Owners, Property Managers, and General Contractors” literature for more detailed information.

AVAILABILITY & COST

Pro-Bel window cleaning/suspended maintenance safety systems are distrib-uted throughout the United States, Canada and internationally.

Budget pricing is provided on a project-to-project basis for both materials and installation, or materials only. See “Tech-nical Consultation” at right.

FREE DESIGN SERVICE

The selection of window cleaning equipment is a performance oriented and highly specialized area. Also the issues of fall protection and fall arrest are serious concerns with OSHA inspection authorities. Interpreting the myriad OSHA standards, including the separate requirements of various states, and proposed changes, is a daunting task at best.

Each building is different, requiring an individual technical approach and a time commitment beyond the scope of most professional offices. Even with a high degree of knowledge and the best of intentions, the planning process can go askew. It is for these reasons that Pro-Bel provides archi-tects and engineers with a FREE DESIGN SERVICE, and to ensure that Pro-Bel Window Cleaning/Suspended Maintenance Systems are properly specified and installed.

TECHNICAL CONSULTATION

Pro-Bel Enterprises Limited provides a complete technical consultation service, available to architects, consultants, engi-neers, contractors, and building owners.

Without obligation, Pro-Bel will provide interested parties with a proposed win-dow cleaning/suspended maintenance design concept to OSHA requirements, including anchor and equipment loca-tions, securement, roofing details and specifications.

Simply provide the following information:

• roof plans (architectural & structural);

• building elevations;

• typical floor plans

• section drawings showing parapet walls or roof edge condition and mechanical room walls; and

• any other drawings pertinent to window cleaning/suspended maintenance re-quirements.

Pro-Bel will review drawings and provide one or more concepts as required with respect to equipment, tie-back methods and similar options.

In addition, Pro-Bel Enterprises Limited will provide budget pricing for window cleaning/suspended maintenance sys-tems contingent upon design acceptance between Pro-Bel and architect/owner for the proposed project.

A-14

S A F E T Y & T I E - B A C K A N C H O R S Fall Protection Systems (continued)

PRO-BEL PB-00 AND PB-01 STAINLESS STEEL BREAKAWAY ANCHORS FOR STEEL ROOFS

(Safety Anchor and/or Horizontal Lifeline Support)

OPTIONAL POST HEADS

INCLUDE ANCHOR EYE,

STANDARD RUNNER,

AND REVERSIBLE

RUNNER

Application (Breakaway Concept) In a fall arrest situation, a break-away mechanism is activated at a pre-determined point e.g. 617 lbs (280 kg). A built-in energy absorb-ing device ensures the anchorage will hold in case of a fall. Concept substantially reduces load applied to securement screws.

NOTE: NO CUTTING

OR WATERPROOFING

REQUIRED

PB-00

PB-01

PB-00

UNIVERSAL

SOLUTION

FOR NEW

STEEL

ROOFS, NO

MATTER THE

FRAMEWORK

m m

8- 3/

8” (2 m m

PB-01

SAFEST SOLUTION FOR

OLD STEEL ROOFS

FIXED TO METALLIC

FRAMEWORK

SPECIFICATION

SPEC NOTE: This basic guide specification (Section 11010 - Window Washing Systems) is devoted exclusively to safety and tie-back anchors and is written in accordance with the CSI/CSC Three Part Section Format. It must be adapted to suit the requirements of individual projects. If other equipment such as outrigger beams, davits, monorails, horizontal cable lifelines or other equip-ment is required, refer to appropriate Pro-Bel liter-ature and incorporate materials and/or other clauses as required. Square brackets [ ] indicate choice, alternatives, data required or need for the specifier to make a decision.

PART 1 - GENERAL

General Requirements

Comply with the conditions of the Contract and Division 1 - General Requirements.

Section Includes

Work of this section includes the design, supply and installation of window cleaning/suspended maintenance equipment.

Related Sections

Unloading and hoisting of equipment to roof Section [01500]

Cast-in-place concrete, including installation of embedded items Section [03300] Precast concrete Section [03400] Structural Steel Section [05120] Open Web Steel Joists Section [05210] Metal Deck Section [05310] Catwalks Section [05516] Roofing Section [07500] Flashing Section [07600] Sealants Section [07900] Rigging access doors in walls Section [08111] Continuous track stabilization on exterior of building

Section [08800] Installation of intermittent stabilization on exterior of building Section [03450] Hot & Cold water supply, faucets and drain at [every] roof level Section [15400] Three phase 208 volts 60 Hertz service at [every ] roof level Section [16050]

SPEC NOTE: Re 1.03,P. Specify independent protected main line power and weatherproof Hubbell twist-lock 208 volts, 3 phase, 60 Hertz, 30 amperes receptacle (HBL2620SW, NEMA No.

L6-30R for rental powered platforms). Power to be located no more than 100'-0" (30 m) from win-dow cleaning/suspended maintenance equip-ment location. Outlets to experience no more than 3% voltage drop under full loading. Pro-Bel wall or roof anchors may be employed for strain relief. Contact Pro-Bel for requirements.

Weatherproof power supply outlets with strain relief anchors Section [16132]

References

AISC S342L-1993, with Supplement No.1 "Load and Resistance Factor Design Specification for Structural Steel Buildings".

AISI SG-971-1996, with 2000 Supplement "Specification for Design of Cold-Formed Steel Structural Members”.

Aluminum Association AA ADM-1-Aluminum Design Manual, 2000 and AWS D1.2-97 Struc-tural Welding Code - Aluminum.

AWS D1.1-2000 Structural Welding Code - Steel.

ANSI/IWCA I-14.1-2001 Window Cleaning Safety Standard (International Window Cleaning Associ-ation).

Design Requirements

Design window cleaning/suspended mainte-nance system to suit building and in accordance with plans, specifications, standards, and regula-tions/codes contained in section 1.04 and 1.08.

Locate safety and tie-back anchors to suit sus-pension equipment which will be used on the building with respect to items such as rigging, spacing, roof edge condition and similar items.

Design all anchor components to provide ade-quate attachment to the building and suited to current window cleaning/suspended mainte-nance practices. Ensure compatibility with indus-try standard equipment.

Ensure all anchor components conform to prop-er engineering principles and have been designed by a Professional Engineer qualified in the design of window cleaning/suspended main-tenance equipment, its application and safety requirements.

Design system fall arrest safety anchors to com-ply with the following structural requirements:

1. Fall arrest safety anchors are designed to a typical maximum fall arresting force of 1800 lbs (8.0 kN) when wearing a body harness with a fac-tor of safety of 2 without any permanent deforma-tion and to 5000 lbs (22.2 kN) against fracture or detachment.

SPEC NOTE: For California State, substitute 5400 lbs (24 kN) in lieu of 5000 lbs. (22.2 kN).

Shop Drawings and Engineering Certification

Submit shop drawings showing complete layout and configuration of complete window cleaning/ suspended maintenance system, including all components and accessories. Clearly indicate design and fabrication details, window "drops", hardware, and installation details.

Shop drawings to include installation and rigging instructions and all necessary Restrictive and Non-Restrictive Working Usage Notes and General Safety Notes.

Shop drawings to be reviewed by a professional engineer, and upon request, complete with test reports.

Qualifications

Manufacturer: Work of this Section to be execut-ed by manufacturer specializing in the design, fabrication and installation of window cleaning/ suspended maintenance systems having a mini-mum of 5 years documented experience.

Loading and safety assurance: Work of this Section to meet the requirements of governing codes and jurisdiction and to comply with proper-ly engineered loading and safety criteria for the intended use.

Insurance: Manufacturer to carry specific liability insurance (products and completed operations) in the amount of $5,000,000.00 + to protect against product/system failure.

Welding to be executed by certified welders in accordance with AWS requirements.

Regulatory Requirements

SPEC NOTE: Re 1.08,A. Specify for all States other than New York and California.

Comply with the following OSHA regulations:

1. 1910, Subpart D (Walking and Working Surfaces).

2. Appendix C to 1910 Subpart F (Personal Fall Arrest Systems).

3. "OSHA Ruling on Window Cleaning by Bosun's Chair" Memorandum to Regional Administrators from P. K. Clark, Director, Directorate of Compliance Programs.

4. 1910.66, Subpart F (Powered Platforms).

SPEC NOTE: Re1.08.B and 1.08.C. Specify for New York State or California only as applicable.

Comply with the following New York State regula-tions:

1. Department of Labor Advisory Standard 101

- Construction, Operation and Maintenance of Suspended Scaffolds Used for Window Cleaning and Light Maintenance.

2. Advisory Standard 111 - Hoisting Machines Used for Suspended Scaffolds.

3. Department of Labor Industrial Code Rule 21

- Protection of Persons Employed at Window Cleaning - Structural Requirements, Equipment and Procedures.

Comply with the following California State regula-tion:

1. Code of Regulations, Title 8 - Industrial Relations, Article 5 (Window Cleaning), Article 6 (Powered Platforms for Exterior Building Maintenance), and Appendix C to Article 6 (Personal Fall Arrest System).

Maintenance Data

Submit 1 copy of system Equipment Manual & Inspection Log Book, with "Initial Inspection - Certification for Use" and "Inspection Sign-Off" forms completed.

Submit 2 copies of a reduced plastic laminated as-built shop drawing showing equipment loca-tions and details. This drawing is to be posted near exits onto the roof.

1.01

A.

1.02

A.

1.03

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

1.04

A.

B.

C.

D.

E.

1.05

A.

B.

C.

D.

E.

1.06

A.

B.

C.

1.07

A.

B.

C.

D.

1.08

A.

B.

C.

1.09

A.

B.

A-15

PART 2 - PRODUCTS

Manufacturer

This specification is based on systems currently being manufactured by PRO-BEL ENTERPRISES LTD. Toll free: 1-800-461-0575. Telephone: 905- 427-0616, Fax: 905-427-2545, info@pro-bel.ca.

Other manufactured products meeting this speci-fication may be substituted provided that manu-facturers show proof of product insurance.

Equipment details to be approved by the architect and/or consultant. Companies, such as miscella-neous metal fabricators, who are not normally engaged in the design and manufacture of win-dow cleaning/suspended maintenance equipment are not permitted to bid.

Equipment

SPEC NOTE: List type and quantity as required.

Materials

SPEC NOTE: Delete items not required.

Safety U-bars: [Type 304 stainless steel with yield strength of 35 Ksi (240 MPa)] [mild steel, Type 300W with yield strength of 44 Ksi (300 MPa), hot-dip galvanized to ASTM A123/A123M-2002]. U-bar to be not less than 3/4" (19 mm) diameter material with 1-1/2" (38 mm) eye opening.

Securement bolts: mild steel, Type 300W with yield strength of 44 Ksi (300 MPa), hot-dip galva-nized to ASTM A123/A123M-2002.

Hollow steel section (HSS) piers: mild steel, Type 300W with yield strength of 50 Ksi (350 MPa).

Wall thickness to suit application, [hot dipped gal-vanized to ASTM A123/A123M-2002] [with Pro- Bel Protex 3/16” (2.4 mm) thickness, black col-ored, two-component TPU polyurethane/polyurea coating system].

SPEC NOTE: Pro-Bel Protex is a superior substi-tute to galvanizing and provides exceptional impact and abrasion resistance.

Base plate and all other sections: [galvanized] [Pro-Bel Protex coated] mild steel as above with yield strength of 44 Ksi (300 MPa). Thickness and securement to suit application.

SPEC NOTE: Re 2.03,E. Specify aluminum flashing for BUR or modified bitumen roofs only (membrane above or below insulation). For sin-gle ply roofs, flashing to be in accordance with membrane manufacturer's instructions. Specify conformable mastic tape and heat-shrink rubber collar flashing for PBE Series roof anchors (BUR or modified bitumen roofs) or s.s. cap for PB series roof anchors (any type roof).

Seamless spun aluminum flashing (for steel pier anchors): Type 6061-T6 alloy to ASTM B221- 2000 with deck flange flashed in to NRCA or CRCA recommendations. Seal top of aluminum flashing with [conformable mastic tape and torch applied heat-shrink rubber collar flashing] [detachable watertight stainless steel cap].

Miscellaneous bolts, nuts and washers: mild steel, Type 300W with yield strength of 44 Ksi (300 MPa), hot-dip galvanized to ASTM A123/A 123M-2002 or Type 304 stainless steel with yield strength of 35 Ksi (240 MPa).

Fabrication

General:

1. Fabricate work true to dimension, square, plumb, level and free from distortion or defects detrimental to appearance and performance.

2. Grind off surplus welding material and ensure exposed internal corners have smooth lines.

PART 3 - EXECUTION

Examination

Examine surfaces and areas upon which the work of this Section depends. Report to the Contractor in writing, defects of work prepared by other trades and other unsatisfactory site condi-tions which would cause defective installation of products, or cause latent defects in workmanship and function.

Verify site dimensions.

Commencement of work will imply acceptance of prepared work.

Installation

Install equipment in accordance with approved shop drawings and manufacturer's recommenda-tions.

Co-ordinate installation with work of related trades.

Install all work true, level, tightly fitted and flush with adjacent surfaces as required.

Deform threads of tail end of anchor studs after nuts have been tightened to prevent accidental removal or vandalism.

SPEC NOTE: Re 3.02,E. Specify for furnish only projects if required.

Manufacturer to assist and/or supervise installa-tion of window cleaning/suspended maintenance equipment installed by others.

Structural steel to receive safety anchors to have adequate bearing surface as indicated on shop drawings and/or to ensure 100% weld.

Final Adjusting and Inspection

Adjust and leave equipment in proper working order.

Complete "Initial Inspection - Certification for Use" form included in Equipment Manual & Inspection Log Book.

Testing

All anchors relying upon chemical adhesive fas-teners to be 100% tested on site using load cell test apparatus in accordance with manufacturer's recommendations.

2.01

A.

B.

2.02

A.

B.

C.

2.03

A.

B.

C.

D.

E.

F.

2.04

A.

3.01

A.

B.

C.

3.02

A.

B.

C.

D.

E.

F.

3.03

A.

B.

3.04

A.

Pr in te d in C an ad a

SERVING U.S.A. AND CANADA, COAST TO COAST.

PRO-BEL ENTERPRISES LIMITED PRO-GRESS • PRO-BEL

www.pro-belusa.com www.pro-bel.ca Head Office 765 Westney Road S, Ajax, ON CANADA L1S 6W1 [ t ] 905.427.0616 [ t f ] 800.461.0575 [ f ] 905.427.2545 [e] info@pro-bel.ca

Western Office #103-350, East Kent Ave S Vancouver, BC CANADA V5X 4N6 [ t ] 604.687.1301 [ f ] 604.687.1306 [e] infovan@pro-bel.ca

Pro-Bel USA #29320 Union City Blvd.

Union City, CA USA 94587 [ t ] 510.477.9666 [ t f ] 1.866.577.6235 [ f ] 510.477.9555 [e] info@pro-belusa.com

PRO-BEL ENTERPRISES LIMITED Window Cleaning/ Suspended Maintenance

Equipment & Fall Protection Systems

S U S P E N D E D E Q U I P M E N T & F A L L P R O T E C T I O N E X P E R T S

Head Off ice 765 Westney Rd S, Ajax ON Canada L1S 6W1 [ t ] 905.427.0616 [ tf] 800.461.0575 [ f ] 905.427.2545 [e] in fo@pro-bel .ca

Western Off ice #103-350, East Kent Ave S Vancouver, BC Canada V5X 4N6 [ t ] 604.687.1301 [ f ] 604.687.1306 [e] in fovan@pro-bel .ca

Cal i fornia Off ice 29320 Union City Blvd, Union City, CA USA 94587 [ t ] 510.477.9666 [ tf] 1 .866.577.6235 [ f ] 510.477.9555 [e] in fo@pro-bel .ca

D A V I T S Y S T E M S Pr o- Be l E nt er pr is es

M

AI

N

TE

N

AN

C

E

EQ

U

IP

M

EN

T Li m ite d w in do w w as hi ng s ys te m s

DESCRIPTION

Davits, used singularly or in pairs, pro-vide an efficient and practical means for suspending bosun’s chairs, single work cages or platforms.

Davits are commonly used on multi-level buildings and where it is necessary to clear non-structural parapets, sloped glazing, and decorative cornice moldings.

Davits provide greater flexibility in roof rigged applications i.e. clearing high parapets or storing platform on roof.

Available in aluminum or steel, with alu-minum being the most popular due to weight and ease of handling.

Steel masts are primarily used for long reach davit arms complete with rein-forced aluminum booms. These heavy long reach arms are often recommended to be permanently left in place.

Davit systems are very popular on build-ings with various terrace levels. Davit bases can be recessed below the pavers if an inverted roofing system is used. The davit base can be concealed with a paver cap.

Davit bases are completely installed around the perimeter of the roof top.