Mx & Repair Bldg 500
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA4600-16-R-0012
- Agency
- Air Combat Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA460018C0004 Federal contract award
- NAICS code
- 561210 Facilities Support Services
- PSC
- Not on record
- Place of performance
- Usstratcom Headquarters Bldg. 500 Compound Offutt AFB, Nebraska 68113, United States
Notice details come from SAM.gov. Updated .
Notice text
8 versions
Update #8 · Latest ·
Added: May 02, 2017 4:26 pm
Modified: Jun 16, 2017 3:54 pmTrack Changes
***PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 4" UPLOADED ON 16 JUNE 2017. THESE QUESTIONS WERE MISSED IN THE PREVIOUS Q&A POST. THIS CONCLUDES THE FINAL ROUND OF QUESTIONS.
____________________________________________________________
***PROPOSAL DUE DATE IS HEREBY EXTENDED TO 21 JUNE 2017 AT 02:00 P.M. CST FROM 16 JUNE 2017 AT 02:00 P.M. CST. PLEASE SEE ATTACHED AMENDMENT***
ADDITIONALLY, PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 3" UPLOADED ON 13 JUNE 2017 THAT CONCLUDES THE FINAL ROUND OF QUESTIONS.
____________________________________________________________
***PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 2" UPLOADED ON 9 JUNE 2017 THAT ANSWERS THE FOLLOWING QUESTION: PWS Para 1.3.2.1.1, PGS Equipment, states the Contractor is responsible for "shield maintenance & repair". Is it the Contractor's responsibility to perform the Annual Hardness Surveillance/Monitoring and the Reverification Testing?
A PWS REVISION IS FORTHCOMING***
____________________________________________________________
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #7 ·
Added: May 02, 2017 4:26 pm
Modified: Jun 13, 2017 6:26 pmTrack Changes
***PROPOSAL DUE DATE IS HEREBY EXTENDED TO 21 JUNE 2017 AT 02:00 P.M. CST FROM 16 JUNE 2017 AT 02:00 P.M. CST. PLEASE SEE ATTACHED AMENDMENT***
ADDITIONALLY, PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 3" UPLOADED ON 13 JUNE 2017 THAT CONCLUDES THE FINAL ROUND OF QUESTIONS.
____________________________________________________________
***PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 2" UPLOADED ON 9 JUNE 2017 THAT ANSWERS THE FOLLOWING QUESTION: PWS Para 1.3.2.1.1, PGS Equipment, states the Contractor is responsible for "shield maintenance & repair". Is it the Contractor's responsibility to perform the Annual Hardness Surveillance/Monitoring and the Reverification Testing?
A PWS REVISION IS FORTHCOMING***
____________________________________________________________
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #6 ·
Added: May 02, 2017 4:26 pm
Modified: Jun 13, 2017 3:06 pmTrack Changes
***PROPOSAL DUE DATE IS HEREBY EXTENDED TO 21 JUNE 2017 AT 02:00 P.M. CST FROM 16 JUNE 2017 AT 02:00 P.M. CST. AMENDMENT FORTHCOMING***
____________________________________________________________
***PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 2" UPLOADED ON 9 JUNE 2017 THAT ANSWERS THE FOLLOWING QUESTION: PWS Para 1.3.2.1.1, PGS Equipment, states the Contractor is responsible for "shield maintenance & repair". Is it the Contractor's responsibility to perform the Annual Hardness Surveillance/Monitoring and the Reverification Testing?
A PWS REVISION IS FORTHCOMING***
____________________________________________________________
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #5 ·
Added: May 02, 2017 4:26 pm
Modified: Jun 09, 2017 4:15 pmTrack Changes
***PLEASE SEE THE ATTACHED DOCUMENT "Answers-Vendor Questions 2" UPLOADED ON 9 JUNE 2017 THAT ANSWERS THE FOLLOWING QUESTION: PWS Para 1.3.2.1.1, PGS Equipment, states the Contractor is responsible for "shield maintenance & repair". Is it the Contractor's responsibility to perform the Annual Hardness Surveillance/Monitoring and the Reverification Testing?
A PWS REVISION IS FORTHCOMING***
____________________________________________________________
***PLEASE SEE ATTACHED AMENDMENT TO EXTEND PROPOSAL DUE DATE FROM 2 JUNE 2017 AT 02:00 P.M. CST TO 16 JUNE 2017 AT 02:00 P.M. CST.***
____________________________________________________________
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #4 ·
Added: May 02, 2017 4:26 pm
Modified: May 24, 2017 5:22 pmTrack Changes
***PLEASE SEE ATTACHED AMENDMENT TO EXTEND PROPOSAL DUE DATE FROM 2 JUNE 2017 AT 02:00 P.M. CST TO 16 JUNE 2017 AT 02:00 P.M. CST.***
____________________________________________________________
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #3 ·
Added: May 02, 2017 4:26 pm
Modified: May 18, 2017 4:38 pmTrack Changes
***PLEASE FIND THE NEWLY ATTACHED EQUIPMENT APPENDICES THAT HAVE BEEN ATTACHED TO THE SOLICITATION PACKAGE. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE ASK***
____________________________________________________________
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #2 ·
Added: May 02, 2017 4:26 pm
Modified: May 09, 2017 4:41 pmTrack Changes
***PLEASE USE THE NEW ATTACHED NON DISCLOSURE AGREEMENT (NDA) WHEN REQUESTING ACCESS TO RECEIVE THE APPENDIX C DISK (MAPS, DRAWINGS AND EQUIPMENT LISTING***
____________________________________________________________
***SITE VISIT***
1. An organized site visit has been scheduled for :
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Update #1 ·
Added: May 02, 2017 4:26 pm
***SITE VISIT***
1. An organized site visit has been scheduled for :
17 May 2017 @ 0900
Participants will meet at:
Offutt Visitor Control Center
Located at the SAC Gate off of Capehart Road
Offutt AFB NE, 68113
(a) All participants are required to meet and sign in. All participants will board transportation provided by the Government regardless of base access privileges.
(b) Please have all site visit RSVP information to include Attachment 19 Entry Access List (EAL) of the RFP to SSgt Justin Lewis at justin.lewis.5@us.af.mil by 10 May 2017 by 10:00 A.M. CST.
(c) Photographs are not authorized to be taken by participants. The Government will provide a camera and assign a representative to take photographs at the request of participants.
(d) Any person wanting to attend this site visit SHALL RSVP with SSgt Justin Lewis by email to justin.lewis.5@us.af.mil. Any person who fails to RSVP will be excluded from the site visit. If there are any questions contact SSgt Lewis by the same means listed above.
(e) Below is the required information to participate in the site visit. Contractors with current base access are not required to provide the below information, but must meet at the designated place and sign in.
(f) All questions generated during the site visit must be submitted in writing to the contracting specialist for an official response. Address, in writing, technical and contractual questions to the contract specialists, justin.lewis.5@us.af.mil and steven.hedgepeth@us.af.mil by close of business (COB) no later than three (3) days after the site visit. If questions are received after that date, the government may or may not answer them.
Attachments
Show all 41
Notice history
| Notice | Type | Posted |
|---|---|---|
| Building 500 (LeMay Complex) Maintenance and Repair Services | Award Notice | |
| Mx & Repair Bldg 500 | Solicitation | |
| Building 500 (LeMay Complex) Maintenance and Repair Services | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity