USSTRATCOM PERFORMANCE WORK STATEMENT
APPENDIX E – RESERVED
APPENDIX F – DEFINITIONS
ACC - AIR COMBAT COMMAND
AFFF - AQUEOUS FILM FORMING FOAM
AFI - AIR FORCE INSTRUCTION
ASHRAE - AMERICAN SOCIETY OF HEATING, REFRIGERATION, AIR-CONDITIONING ENGINE
BCE - BASE CIVIL ENGINEER
CAC - COMMON ACCESS CARD
CAR - CORRECTIVE ACTION REPORT
CCF - CUSTOMER COMPLAINT FORM
CE - CIVIL ENGINEERING
CES - CIVIL ENGINEERING SQUADRON
CLIN - CONTRACT LINE ITEM NUMBER
CO - CONTRACTING OFFICER
COR - CONTRACTING OFFICER’S REPRESENTATIVE
DOD - DEPARTMENT OF DEFENSE
DSW - DIRECT SCHEDULED WORK
ECD - ESTIMATED COMPLETION DATE
EMCS - ENERGY MANAGEMENT CONTROL SYSTEM
EMS - ENVIRONMENTAL MANAGEMENT SYSTEM
ESOHTN - ENVIRONMENT, SAFETY, AND OCCUPATIONAL HEALTH TRAINING NETWORK
ETL - ENGINEERING TECHNICAL LETTERS
FAR - FEDERAL ACQUISITION REGULATION
FB - FACILITY BOARD
FOIA - FREEDOM OF INFORMATION ACT
FOUO - FOR OFFICIAL USE ONLY
HVAC - HEATING VENTILATION AND AIR CONDITIONING
IA - INFORMATION ASSURANCE
IAW - IN ACCORDANCE WITH
ICS - INDUSTRIAL CONTROL SYSTEMS
IPC - INTERNATIONAL PLUMBING CODE
LAN - LOCAL AREA NETWORK
MIL-STD - MILITARY STANDARD
MMP - MAINTENANCE MASTER PLAN
MSDS - MATERIALS SAFETY DATA SHEET
NAC - NATIONAL AGENCY CHECK
NEC - NATIONAL ELECTRIC CODE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
NLT - NO LATER THAN
NPDES - NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM
O&M - OPERATIONS AND MAINTENANCE
OSHA - OCCUPATIONAL SAFETY AND HEALTH ACT
PCB - POLYCHLORINATED BIPHENYLS
PM - PROJECT MANAGER
PWS - PERFORMANCE WORK STATEMENT
QC - QUALITY CONTROL
RAB - RESTRICTED AREA BADGE
RWP - RECURRING WORK PROGRAM
UFC - UNIFIED FACILITIES CRITERIA
UPS - UNINTERRUPTIBLE POWER SUPPLY
USAF - UNITED STATES AIR FORCE
USSTRATCOM - UNITED STATES STRATEGIC COMMAND
WRRB - WORK REQUEST REVIEW BOARD
APPENDIX G – CONTRACT LINE ITEM NUMBER OUTLINE
Contract Line Item Number (CLIN) Outline:
CLIN CLIN TITLE
X001 RPIE Preventive Maintenance Work Program (Priority 2A) X002 RPIE Direct Schedule Work (DSW) X003 RPIE Work Order Other Direct Costs (FFP- EST $150K/year) X004 RPSE or designated non-RPIE Preventive Maintenance Work Program (Priority 2A) X005 RPSE or designated non-RPIE Direct Schedule Work (DSW) X006 RPSE or designated non-RPIE Work Order Other Direct Costs (Cost FFP - EST
$150K/year) X007 Option 1, 24/7 On-Site Maintenance Worker X008 Option 2, 24/7 On-Site Watchman X009 Required Reports – Not Separately Priced 0010 Mobilization (base period only – 30 days)
APPENDIX H – RESERVED
APPENDIX I – RESERVED
APPENDIX J – PGS Equipment
For planning and pricing purposes, the Contractor will be provided detailed inventories of the following systems via Excel spreadsheet. The Contractor shall note that should additional equipment be found in the field that was not captured during the inventory effort, it will still be a requirement to maintain and repair them accordingly, and will be added to the inventory list below.
Manufacturer Location Item Model No Serial Number Unit Capacity
Caterpillar PGS Building Generating Set #1 ISO8528
CAT00C32VJAZ0
Caterpillar PGS Building Generator #1 100SC2 G1B00753 1000 kW
Caterpillar PGS Building Generating Set #2 ISO8528
CAT00C32CJAZ0
Caterpillar PGS Building Generator #2 100SC2 G1B00756 1000 kW
Caterpillar PGS Building Switchgear UL891 SWG36810
Eaton PGS/U108 Automatic Transfer Switch CBTS TSC02648 260A
Multistack PGS Building Chiller #1
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐046 30 Tons
Multistack PGS Building Chiller #2
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐045 30 Tons
Multistack PGS Building Chiller #3
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐042 30 Tons
Multistack PGS Building Chiller #4
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐043 30 Tons
Multistack PGS Building Chiller #5
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐044 30 Tons
Multistack PGS Building Chiller #6
ASP030XN13H1AL0AAAHN
‐R410A AD 03‐047 30 Tons
Marathon Pump PGS Building
Chilled Water Pump #1 MYN284TTDCA6026
450157389‐ 2553087
Marathon Pump PGS Building
Chilled Water Pump #2 MYN284TTDCA6026
450157389‐ 2553068
APPENDIX K – PGS Equipment Manufacturer’s Recommend Preventive Maintenance
Equipment
Type:
Component: Diesel Generator 600‐1500 KW Task Frequency
PM Components (Task Description) Frequency W M Q S A
1 General Site and Generator Conditions Weekly x x x x x 2 Inspect Fluid Levels Weekly x x x x x
Inspect Batteries and DC Charging System Weekly x x x x x
4 Inspect Cooling System and Louvers Monthly x x x x 5 Test Coolant Monthly x x x x 6 Ensure Belt Proper Tension Monthly x x x x 7 Check Fuel System for Leaks Monthly x x x x 8 Inspect Day Tank and Test Aux Pump Monthly x x x x 9 Inspect Unit Grounding and Wires Monthly x x x x
10 Inspect Controls/Gauges Condition Monthly x x x x 11 Operate Generator Under Load Monthly x x x x 12 Drain Water from Fuel System Monthly x x x x 13 Disconnect Power From Main Semi‐Annually x x 14 Change Fuel Filters Annually x 15 Change Oil and Lube Filters Annually x 16 Clean Airbox and Change Air Filter Annually x
Change Coolant and Filter Flush Radiator Annually x
Equipment Type:
Component: Fuel Tank Inspections Task Frequency
PM Components (Task Description) Frequency W M Q S A
1 Check leak detector for indication of fluid Weekly x x x x x 2 Check for leaks Weekly x x x x x
Check piping and fittings for rust, paint, powder coat decay Weekly x x x x x
4 Check fuel gauge for operation Weekly x x x x x 5 Check fill containment for debris Weekly x x x x x 6 Check for cracks in tank Weekly x x x x x 7 Check signage Weekly x x x x x 8 Check for water in primary tank Monthly x x x x 9 Inspect ground Monthly x x x x
10 Replace fuel filter Annually x 11 Inspect leak detection device wiring Annually x
12 Inspect emergency relief vent Annually x 13 Calibrate fuel gauge Annually x
Component: Generator Monitoring Task Frequency
PM Components (Task Description) Frequency W M Q S A
Inspect wiring connections/clean control box Monthly x x x x
2 Ensure system is in operational order Monthly x x x x
Equipment Type: D5090210Generators (by kW)
Component: EAID Inspection Task Frequency
PM Components (Task Description) Frequency W M Q S A
1 General Site and Generator Conditions Weekly x x x x x 2 Inspect Fluid Levels Weekly x x x x x 3 Inspect Batteries and DC Charging System Weekly x x x x x 4 Inspect Cooling System and Louvers Quarterly x x x 5 Test Coolant Quarterly x x x 6 Ensure Belt Proper Tension Quarterly x x x 7 Check Fuel System for Leaks Quarterly x x x 8 Inspect Day Tank and Test Aux Pump Quarterly x x x 9 Inspect Unit Grounding and Wires Quarterly x x x
10 Inspect Controls/Gauges Condition Quarterly x x x 11 Operate Generator Under Load Quarterly x x x 12 Drain Water from Fuel System Quarterly x x x 13 Connect to run under facility load Annually x 14 Change Fuel Filters Annually x 15 Test/Change Oil and Lube Filters Annually x 16 Clean Airbox and Change Air Filter Annually x 17 Change Coolant and Filter Flush Radiator Annually x 18 Inspect/adjust magnetic pick‐up Annually
Component: Automatic Transfer Switch Task Frequency
PM Components (Task Description) Frequency W M Q S A
1 Inspect Wiring and Connections Monthly x x x x 2 Inspect Contact Condition Monthly x x x x
Check Components and Controls for Proper operation Monthly x x x x
Inspect Indicator Lights and Instrumentation Monthly x x x x
5 Inspect Timers for Suitable Settings Monthly x x x x 6 Re‐torque Lug Connections Annually x 7 Clean and Lubricate Switch Annually x
Component: Fire Deluge Pump Task Frequency
PM Components (Task Description) Frequency W M Q S A
1 General Site and Generator Conditions Weekly x x x x x 2 Inspect Fluid Levels Weekly x x x x x 3 Inspect Batteries and DC Charging System Weekly x x x x x 4 Inspect Cooling System and Louvers Monthly x x x x 5 Check Fuel System for Leaks Monthly x x x x 6 Inspect Unit Wires and Start System Monthly x x x x 7 Inspect Controls/Gauges Condition Monthly x x x x 8 Operate Pump Under Load Monthly x x x x 9 Drain Water from Fuel System Monthly x x x x
10 Change Fuel Filters Annually x 11 Change Oil and Lube Filters Annually x 12 Change Air Filter Annually x