Appendix_D.pdf

PDF 85 KB Posted

Attached to
Mx & Repair Bldg 500 Federal contract opportunity
Solicitation number
FA4600-16-R-0012
Issued by
Department of the Air Force Air Combat Command

About this file

Appendix D

View the file

Other files for this federal contract opportunity

Other files attached to Mx & Repair Bldg 500, newest first.
File Type Posted
Answers-Vendor_Questions_4_Final.pdf PDF
FA4600-16-R-0012-0002_Amendment_2.pdf PDF
Att_20-Performance_Work_Statement_6-13-17.pdf PDF
Answers-Vendor_Questions_3_Final.pdf PDF
Answers-Vendor_Questions_2_Final.pdf PDF
Answers-Vendor_Questions_Final.pdf PDF
FA4600-16-R-0012-0001_Amendment_1.pdf PDF
Appendices_A_B_C.pdf PDF
Appendix_B_Plumbing_Equipment.xlsx XLSX spreadsheet
Appendix_B_Fire_Protection_Equipment.xlsx XLSX spreadsheet
Appendix_M.pdf PDF
Appendix_B_HVAC_Equipment.xlsx XLSX spreadsheet
Appendix_B_Pegasus_Supplemental.XLSX XLSX spreadsheet
Appendix_B_MISC.xlsx XLSX spreadsheet
Appendices_E_F_G_H_I_J_K_L.pdf PDF
Appendix_B_Electrical_Equipment.xlsx XLSX spreadsheet
Att_6_NDA_Agreement_(new).pdf PDF
Att_12_Pst_Perf_Info_(PPI)_Doc.doc DOC document
Att_14_Pst_Prsnt_Perf_Qstnr.docx DOCX document
Att_6_NDA_Agreement.pdf PDF
Att_1_Maps_drwngs_eqpt_list.pdf PDF
Att_15_Pst_Perf_Trkng_Rec.docx DOCX document
Att_2_Pricing_Model.xlsx XLSX spreadsheet
Att_16_Sub-KT_Tm_Consent_Ltr.docx DOCX document
Att_17_Client_Auth_Letter.docx DOCX document
Att_3_QASP.pdf PDF
Att_9_Contractor_Validation.xls XLS spreadsheet
Att_4_CoI.pdf PDF
Att_22_Work_Order_historical_data.xlsx XLSX spreadsheet
Att_13__PPQ_Cover_Letter.docx DOCX document
Att_5_SF328.pdf PDF
Att_20-Performance_Work_Statement.pdf PDF
Att_8_DODM_5200.01,_Vol._4.pdf PDF
Att_7_DODI_8582.01.pdf PDF
Att_19_EAL.xlsx XLSX spreadsheet
Att_11_OFCCP_EEOC_Clrnc_Req.doc DOC document
Att_21_List_of_Required_Reports.pdf PDF
FA4600-16-R-0012.pdf PDF
Att_18_Local_Instructions.pdf PDF
Att_10_Wg_Dtrmntn.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USSTRATCOM PERFORMANCE WORK STATEMENT

APPENDIX D – FACILITY DRAWINGS

For planning and pricing purposes, the Contractor may be provided the floorplans via CD‐ROM upon their request, submission of documents below, and approval from the government Security manager of this requirement. Media will be provided once it is available.

All drawings pertaining to the Bldg 500 (LeMay) complex are ‘For Official Use Only’ (FOUO). The scope given in para. 5.2 of this PWS directs that the Contractor use FOUO documents to create additional FOUO documents. Therefore, compliance with Governmental guidance on handling unclassified but sensitive information is mandatory. Any references to US Strategic Command, USSTRATCOM, or Offutt AFB shall be removed from all contractor unclassified or FOUO drawings. Specific guidance is listed below.

The prime contractor shall be responsible for compliance to the below guidance of all sub‐contractors and/or employees supporting the Bldg 500 Mx & Repair. The Government may require any of the below forms to be submitted in order to receive the maps and drawings.

B.1 Certificate Pertaining to Foreign Interests: Standard Form (SF) 328, included in RFP attachments must be completed and submitted prior to obtaining FOUO documents. The form shall be signed by the company president or general manager on behalf of the company and employees.

Companies will require approval from Government security representatives prior to obtaining FOUO documents. The Government reserves the right to deny a bidder FOUO documents, establishing the bidder as unqualified to perform the scope of this contract.

B.2 Nondisclosure Agreement: Included in the RFP attachments, must be completed and submitted prior to obtaining FOUO documents. This nondisclosure agreement (NDA) was developed for any contractor working with information pertaining to the B500 complex. The form shall be signed by the company president or general manager on behalf of the company and employees.

B.3 DOD Guidance: Two DOD publications outline specific measures concerning the handling, transmittal, and disposal of information/material not intended for public release. The contractor shall comply with and actively engage in all measures outlined in the below publications. Failure to do so shall be considered a breach of the nondisclosure agreement.

B.3.1 DODI 8582.01: The contractor shall reference Enclosure 3 of title document included in RFP attachments for handling soft copy materials.

B.3.2 DODM 5200.1, Volume 4: The contractor shall reference Enclosure 3, paragraph 2e of title document included in RFP attachments for handling hard copy materials.

B.4 Contractor Validation Data: The winning bidder shall be required to complete data entry pertaining to their own company, any subcontractors, and any subcontractors to each subcontractor, and major suppliers of materials and services to each. Failure to complete the

USSTRATCOM PERFORMANCE WORK STATEMENT

form in good faith to represent the total contractor’s team shall be considered a breach of the NDA. The Contractor shall use the formatting provided in RFP attachment titled Contractor Validation Data.

B.5. Products may not be labeled in a way that refers to sensitive missions or equipment, special access controls, or similar designations.

Generally this requirement is interpreted as only labeling products with room number only.

File details come from the government source that posted it. Updated .