Multiple Award Construction Contract (MACC) JB Andrews and JB Anacostia-Bolling

Closed Solicitation Posted

Solicitation number
FA286020R0045
Agency
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

Place of performance
JB Andrews MD 20762 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for multiple indefinite-delivery, indefinite-quantity construction contracts to provide maintenance, repair, and minor construction services at Joint Base Andrews, Maryland and Joint Base Anacostia-Bolling, Washington D.C. The Department of the Air Force is procuring these services over a potential seven-year period with a one-year base period and six one-year option periods. Evaluation will be based on technical acceptability and past performance, with proposals due by October 9, 2020.

The solicitation is set aside as an 8(a) small business competitive acquisition for the Mid-Atlantic region. The primary NAICS code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The potential total contract value is $700 million over seven years with an annual ceiling of $100 million. Task orders will range from $500,000 to $15 million. Performance will take place at Joint Base Andrews and Joint Base Anacostia-Bolling. There are no incumbent contractors as this is a new procurement.

Notice text

6 versions

Update #6 · Latest ·

Amendment 05 - The purpose of this amendment is to:

1) Provide clarification in Section L5.0(d) regarding bonding requirements.  Section L has been updated accordingly.

No other changes were made as part of this amendment.

==============

Amendment 04 - The porpose of the amendment is to:

1) Extend the proposal due date to 09 October 2020, 04:00PM EST

2) Extend the Financial Responsibility due date to 10 September 2020, 04:00PM EST 

3) Update Section M, paragraph M.5.1.2

4) Post additional Q&As related to the MACC solicitation 

Sections L, Attachemnt 17, and M, Attachment 18, of this solicitation have been updated accordingly. 

Offerors are reminded that if they do not see a response specific to their RFI submitted, please go back and compare the question submitted with the contents of the RFP.  The USG has reviewed all questions submitted, and in a number of instances, the answer to those questions was already addressed in the RFP.  The government will not repetitively provide RFP information/references to questions submitted by Offerors.

No other changes were made as part of this amendment. 

===============

This update it strictly to do the following:

1) Post the Government's responses to the clarification RFI's submitted IAW section L

2) Provide a WORD (.docx) version of Attachment 15, PPQ, and Attachment 16, PPI, as it has been noted to ADOBE versions have been difficult to use. 

================

Amendment 03 - The purpose of this amendment is to extend the due date of the Financial Resource submittal requirement from 17 August 202o to 24 August 2020.  Section L has been updated accordingly.  No other changes were made as part of this amendment. 

================

Amendment 02 - The purpose of Amendment 02 is to:

1) update the solicitation based on discrepancies

 2) clarify requirement information found in Section H and Section L

 3) Post site visit minutes &

4)  Post answers to 1 August 2020 RFIs

No other changes are made as a result of this amendment.

===============

Amendment 01 - The purpose of Amendment 01 is administrative in nature and is strictly to upload Attachment 17 (Section L - Instructions, Conditions, and Notices to Offerors) and Attachment 18 (Section M - Evaluation Factors for Award) that failed to upload previously.  No other updates/changes are made as a result of this amendment.

===============

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Update #5 ·

Amendment 04 - The porpose of the amendment is to:

1) Extend the proposal due date to 09 October 2020, 04:00PM EST

2) Extend the Financial Responsibility due date to 10 September 2020, 04:00PM EST 

3) Update Section M, paragraph M.5.1.2

4) Post additional Q&As related to the MACC solicitation 

Sections L, Attachemnt 17, and M, Attachment 18, of this solicitation have been updated accordingly. 

Offerors are reminded that if they do not see a response specific to their RFI submitted, please go back and compare the question submitted with the contents of the RFP.  The USG has reviewed all questions submitted, and in a number of instances, the answer to those questions was already addressed in the RFP.  The government will not repetitively provide RFP information/references to questions submitted by Offerors.

No other changes were made as part of this amendment. 

===============

This update it strictly to do the following:

1) Post the Government's responses to the clarification RFI's submitted IAW section L

2) Provide a WORD (.docx) version of Attachment 15, PPQ, and Attachment 16, PPI, as it has been noted to ADOBE versions have been difficult to use. 

================

Amendment 03 - The purpose of this amendment is to extend the due date of the Financial Resource submittal requirement from 17 August 202o to 24 August 2020.  Section L has been updated accordingly.  No other changes were made as part of this amendment. 

================

Amendment 02 - The purpose of Amendment 02 is to:

1) update the solicitation based on discrepancies

 2) clarify requirement information found in Section H and Section L

 3) Post site visit minutes &

4)  Post answers to 1 August 2020 RFIs

No other changes are made as a result of this amendment.

===============

Amendment 01 - The purpose of Amendment 01 is administrative in nature and is strictly to upload Attachment 17 (Section L - Instructions, Conditions, and Notices to Offerors) and Attachment 18 (Section M - Evaluation Factors for Award) that failed to upload previously.  No other updates/changes are made as a result of this amendment.

===============

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Update #4 ·

This update it strictly to do the following:

1) Post the Government's responses to the clarification RFI's submitted IAW section L

2) Provide a WORD (.docx) version of Attachment 15, PPQ, and Attachment 16, PPI, as it has been noted to ADOBE versions have been difficult to use. 

================

Amendment 03 - The purpose of this amendment is to extend the due date of the Financial Resource submittal requirement from 17 August 202o to 24 August 2020.  Section L has been updated accordingly.  No other changes were made as part of this amendment. 

================

Amendment 02 - The purpose of Amendment 02 is to:

1) update the solicitation based on discrepancies

 2) clarify requirement information found in Section H and Section L

 3) Post site visit minutes &

4)  Post answers to 1 August 2020 RFIs

No other changes are made as a result of this amendment.

===============

Amendment 01 - The purpose of Amendment 01 is administrative in nature and is strictly to upload Attachment 17 (Section L - Instructions, Conditions, and Notices to Offerors) and Attachment 18 (Section M - Evaluation Factors for Award) that failed to upload previously.  No other updates/changes are made as a result of this amendment.

===============

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Update #3 ·

Amendment 03 - The purpose of this amendment is to extend the due date of the Financial Resource submittal requirement from 17 August 202o to 24 August 2020.  Section L has been updated accordingly.  No other changes were made as part of this amendment. 

================

Amendment 02 - The purpose of Amendment 02 is to:

1) update the solicitation based on discrepancies

 2) clarify requirement information found in Section H and Section L

 3) Post site visit minutes &

4)  Post answers to 1 August 2020 RFIs

No other changes are made as a result of this amendment.

===============

Amendment 01 - The purpose of Amendment 01 is administrative in nature and is strictly to upload Attachment 17 (Section L - Instructions, Conditions, and Notices to Offerors) and Attachment 18 (Section M - Evaluation Factors for Award) that failed to upload previously.  No other updates/changes are made as a result of this amendment.

===============

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Update #2 ·

Amendment 01 - The purpose of Amendment 01 is administrative in nature and is strictly to upload Attachment 17 (Section L - Instructions, Conditions, and Notices to Offerors) and Attachment 18 (Section M - Evaluation Factors for Award) that failed to upload previously.  No other updates/changes are made as a result of this amendment.

===============

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Update #1 ·

The Multiple Award Constuction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is for a broad range of maintenance, repair, and minor construction requirements affecting real property at JB Andrews, Maryland and JB Anacostia-Bolling, Washington, DC.

Requirements include, but are not limited to the furnishing of all personnel, equipment, tools, materials, supervision,
and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or
new construction work on various real property facilities. The projects will include tasks in a variety of trades such as
demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including
HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.
Contractor efforts generally also include the development of design documentation from a statement of work and/or
other preliminary requirements documents. Contractor designs shall include industry standard and Air Force, JB
Andrews, and JB Anacostia-Bolling specific requirements including, but not limited to, drawings, specifications,
design analysis that is representative of various design efforts (as identified within each Task Order).

Review all attachments to ensure understanding of the MACC and its specifications.


PERFORMANCE LOCATION: JB Andrews, Maryland, JB Anacostia-Bolling, Washington, DC, and tenant units/locations.


PERIOD OF PERFORMANCE (PoP): The period of performance is expected to be one (1) twelve (12) month base
contract period, with 6 (six) twelve (12) month option periods.


ESTIMATED CONTRACT VALUE: The estimated ceiling value for this requirement is $100M per year, for a total of $700M
over seven years.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 236220 SIZE STANDARD: $39.5M. In
accordance with FAR 52.204-7, contractors must be registered in the System for Award Management (SAM) database.
There is no cost to use SAM, please go to https://www.sam.gov for more information. Prime contractors who intend to
submit a proposal for this solicitation must be US-owned entities. Contractors shall be registered in SAM prior to any
contract award.

Files

File Type Posted
Solicitation Amendment FA286020R00450005 SF 30.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
MACC REQUEST FOR INFORMATION 24 AUGUST - 1 SEPTEMBER UPDATE.pdf PDF
Solicitation Amendment FA286020R00450004 SF 30.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 15 - MACC Past Performance Questionnaire.docx DOCX document
MACC REQUEST FOR INFORMATION 24 AUGUST.pdf PDF
Attachment 16_Present Past Performance Information PPPI.docx DOCX document
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Solicitation Amendment FA286020R00450003 SF 30 (1).pdf PDF
Solicitation Amendment FA286020R00450002 SF 30.pdf PDF
Attachment 19_FA286020R0045 MACC Site Visit Minutes.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
MACC REQUEST FOR INFORMATION 11 August.pdf PDF
Solicitation Amendment FA286020R00450001 SF 30(s).pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 6- MACC JBA Environmental Standards.pdf PDF
Attachment 3 - Task Order Procedured May2020.pdf PDF
Attachment 16_Present Past Performance Information PPPI.pdf PDF
Attachment 9 - MACC Fire Protection Standards.pdf PDF
MACC Solicitation - FA286020R0045.pdf PDF
Attachment 12 - MACC Section 01 33 00 Submittal Procedures.pdf PDF
Attachment 7- MACC JBAB Environmental Standards.pdf PDF
Attachment 15 - MACC Past Performance Questionnaire.pdf PDF
Attachment 8 - MACC Mechanical Sys Standard Requirements.pdf PDF
Attachment 11 - MACC JBA Architectural Guideline.pdf PDF
Attachemnt 1 - MACC SOW Mar2020.pdf PDF
Attachment 10 - MACC Communications Site Specific Standard.pdf PDF
Attachment 2 - MACC General Requirements.pdf PDF
Attachment 4 - On Ramp Off Ramp Procedures April2020.pdf PDF
Attachment 13 - MACC JBA Section 01 45 35 Special Conditions.pdf PDF
Attachment 5- MACC Electrical Standard Requirements 2019.pdf PDF
Attachment 14 - MACC JBA Section 01 14 00 Work Restrictions.pdf PDF
Show all 35

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Multiple Award Construction Contract (MACC) JB Andrews and JB Anacostia-Bolling Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY27 MACC Shaw Air Force Base, Poinsett Weapons Range, Wateree Recreation Facility, and other multiple mini-mute sites, not to include Military Family Housing, as requirements arise. Shaw AFB, South Carolina 29152, United States · NAICS 236220 Air Combat Command Total Small Business
JB Charleston Multiple Award Construction Contract South Carolina 29404, United States · NAICS 236220 Air Mobility Command No set-aside
2027-2034 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC) Wright-Patterson Air Force Base 45433 · NAICS 236220 AFLCMC Wright Patterson AFB Total Small Business
HAFB Multiple Award Construction Contract V (MACC V) Hill AFB, UT (Davis County) Utah Test and Training Range (Uttr) Little Mountain Test Facility (Lmtf) Utah Air National Guard (Utang) Base Boulder Seismic Site, WY Other: Geographically separated units (GSU) under the responsibility of 75 ABW/CC · NAICS 236220 Air Force Sustainment Center Total Small Business
NIH multiple-award construction contract (MACC) for general construction services Bethesda, Maryland 20892, United States · NAICS 236220 NIH Construction No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors