Attachment 7- MACC JBAB Environmental Standards.pdf

PDF 213 KB Posted

Attached to
Multiple Award Construction Contract (MACC) JB Andrews and JB Anacostia-Bolling
Solicitation number
FA286020R0045
Issued by

About this file

This document outlines requirements for a Multiple Award Construction Contract (MACC) opportunity for the Department of the Air Force. The MACC is an Indefinite-Delivery, Indefinite-Quantity contract to provide maintenance, repair, and minor construction services at Joint Base Andrews, Maryland and Joint Base Anacostia-Bolling, Washington, D.C. Requirements include tasks across various trades such as demolition, site work, electrical, and mechanical work. Contractors will also develop design documentation from statements of work. The base contract period is one year with six one-year option periods, for a total estimated ceiling value of $100 million per year or $700 million over seven years. The North American Industry Classification System code is 236220 with a size standard of $39.5 million. Contractors must be registered in the System for Award Management and be U.S.-owned entities to submit proposals for this solicitation by the response date.

View the file

Other files

File Type Posted
Solicitation Amendment FA286020R00450005 SF 30.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
MACC REQUEST FOR INFORMATION 24 AUGUST - 1 SEPTEMBER UPDATE.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Solicitation Amendment FA286020R00450004 SF 30.pdf PDF
MACC REQUEST FOR INFORMATION 24 AUGUST.pdf PDF
Attachment 16_Present Past Performance Information PPPI.docx DOCX document
Attachment 15 - MACC Past Performance Questionnaire.docx DOCX document
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Solicitation Amendment FA286020R00450003 SF 30 (1).pdf PDF
Attachment 19_FA286020R0045 MACC Site Visit Minutes.pdf PDF
Solicitation Amendment FA286020R00450002 SF 30.pdf PDF
MACC REQUEST FOR INFORMATION 11 August.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Solicitation Amendment FA286020R00450001 SF 30(s).pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 9 - MACC Fire Protection Standards.pdf PDF
MACC Solicitation - FA286020R0045.pdf PDF
Attachment 8 - MACC Mechanical Sys Standard Requirements.pdf PDF
Attachemnt 1 - MACC SOW Mar2020.pdf PDF
Attachment 6- MACC JBA Environmental Standards.pdf PDF
Attachment 3 - Task Order Procedured May2020.pdf PDF
Attachment 2 - MACC General Requirements.pdf PDF
Attachment 11 - MACC JBA Architectural Guideline.pdf PDF
Attachment 13 - MACC JBA Section 01 45 35 Special Conditions.pdf PDF
Attachment 16_Present Past Performance Information PPPI.pdf PDF
Attachment 5- MACC Electrical Standard Requirements 2019.pdf PDF
Attachment 14 - MACC JBA Section 01 14 00 Work Restrictions.pdf PDF
Attachment 4 - On Ramp Off Ramp Procedures April2020.pdf PDF
Attachment 12 - MACC Section 01 33 00 Submittal Procedures.pdf PDF
Attachment 10 - MACC Communications Site Specific Standard.pdf PDF
Attachment 15 - MACC Past Performance Questionnaire.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACC

Attachment 7

JOINT BASE ANACOSTIA-BOLLING

ENVIRONMENTAL PROTECTION STANDARDS for CONTRACTS

June 2020

PART 1 GENERAL

1.1 SUMMARY

These standards address general environmental protection requirements for all construction, renovation, repair, and service contracts at Joint Base Anacostia- Bolling (JBAB), DC. The U.S. Government, The U.S. Air Force, and JBAB, require that all contractors (to include all subcontractors) involved in the planning and execution of projects shall apply the general requirements identified herein to their specific projects and ensure compliance as applicable.

This plan is not intended to be all-inclusive, but is to be used for all applicable contracts. It is the responsibility of the contractor to comply with all federal, state and local environmental laws and regulations in carrying out tasks associated with their project and it is the Air Force’s responsibility to ensure that these standards are adhered to. This is a living document which is intended to be updated on a periodic basis as needed.

1.2 REFERENCES

All contractors and subcontractors shall comply with all applicable local (District of Columbia Municipal Regulations (DCMR)) and federal regulations;

all relevant Department of Defense and Air Force Instructions (AFI); and all JBAB policies, plans, and programs. These include but are not limited to the following:

Regulation Topic 40 CFR Parts 1500-1508 National Environmental Policy Act 32 CFR Part 989 Air Force Environmental Impact Analysis Process 40 CFR Parts 260-282 Hazardous Waste Management 49 CFR Parts 105-180 Transportation of Hazardous Material DCMR Title 20 Chapters 42&43 Hazardous Waste Management AFI 32-7042 Hazardous Waste Management JBAB HMM PLAN Hazardous Waste Management Plan AFI 32-7086 Hazardous Materials Management 40 CFR Parts 61.115 & 763 Hazardous Materials Management AFI 32-1052 Asbestos DCMR Title 20 Chapter 33 Facility Asbestos Management 40 CFR Parts 112.1 – 112.3 & 300 Lead DCMR Title 20 Chapters 55-67 and 70 Oil Pollution International Fire Code (IFC) and National Fire Protection Association (NFPA) 30, 30A, and 31

Underground Storage Tanks

JBAB, Spill Prevention, Control, & Counter Measure Aboveground Storage Tanks

Plan; JBAB MWR Marina Tier 1 SPCC Plan; 40 CFR

40 CFR Part 761 Emergency Response

Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use Prohibitions

Regulation Topic 40 CFR Parts 60, 61, 63, 68 & 80 Air Quality DCMR Title 20 Chapters 1 - 15 Air Quality 40 CFR Parts 122 & 141 Water Quality DCMR Title 21 Chapters 5,6,11,14,19, and 22 Water Quality and Pollution DCMR Title 21 Chapter 5 Stormwater Management JBAB Storm Water Pollution Prevention Plan (SWPPP)

Stormwater Management

EPA National Pollutant Discharge Elimination System (NPDES) Multi Sector General Permit (MSGP) for Industrial Activities

Stormwater Management

District of Columbia MS4 Permit Stormwater Management

District of Columbia Erosion & Sediment Control Manual and Field Handbook

Erosion & Sediment Control

District of Columbia 2020 Stormwater Management Guidebook

Stormwater Management

U.S. Army Corps of Engineers (USACE) and D.C. Official Code §§8-

103.06 and §§8-103.13.

Clean Water Act Sections 401/404 Permitting (authorizes certain work in waters of the United States within the District of Columbia, including wetlands, streams, waterways, and other regulated bodies of water)

AFI 32-7080 Pollution Prevention JBAB P2 Plan Pollution Prevention 40 CFR Part 247 Affirmative Procurement JBAB Green Procurement Plan Green Procurement Exec Order 13101 Recycling and Acquisition DCMR Title 21 Chapter 20 Solid Waste Management and Multi-Material Recycling DCMR Title 20 Chapters 7 & 8 Solid Waste JBAB SWMP Solid Waste Management Plan 29 CFR Part 1910.1200 Hazard Communication 40 CFR Part 230 Wetlands DCMR Title 21 Chapter 11 Tidal Wetlands 50 CFR Part 17 Endangered & Threatened Wildlife & Plants AFI 32-7064 Integrated Natural Resources Management 36 CFR Part 800 Protection of Historic Properties 32 CFR Part 229 Protection of Archeological Resources AFI 32-7065 Cultural Resources Management Executive Order 11990 Protection of Wetlands AFI 64-117, Section 2.10 Affirmative Procurement

Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management

JBAB Environmental Management System Management of Environmental Risk

1.3 ENVIRONMENTAL PROTECTION PLANNING REQUIREMENTS

The basic contracting requirements are as follows: 1) Provide and maintain environmental protection as required, during the life of the contract, 2) Plan for and provide environmental protective measures to control pollution that develops during normal construction activities or project execution, 3) Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary featuresassociated with the project, and 4) Comply with federal and local regulations pertaining to the environment including, but not limited to, water, air and ground pollution.

1.3.1 Environmental Impact Analysis

Environmental impact analysis process (EIAP) documents (AF Form 813, environmental assessment or environmental impact statement) prepared under provisions of the National Environmental Policy Act (NEPA) shall be incorporated into contract specifications. Compliance with requirements identified in the EIAP documents is mandatory. EIAP must be complete before obligating funds to implement a proposed action.

1.3.2 Environment Protection Planning

All contractors shall be required to demonstrate that they are capable of complying with all applicable environmental laws and regulations. It is the responsibility of each contractor to ensure environmental compliance requirements are properly identified and addressed in all meetings, site visits and included in all contract plans and submittals. In most instances a separate Environmental Compliance Plan, as identified by the Installation Management Flight Environmental Elementt through the contracting officer (CO) or their representative, may be required to ensure full site awareness and thorough compliance. Environmental planning conducted by the contractor shall, at a minimum, address the following as applicable:

1.3.2.1 Laws, Regulations and Required Permits

The contractor shall prepare a submittal identifying all applicable federal and local laws, regulations and permit requirements concerning environmental protection, pollution control, abatement, and the requirements imposed by those laws, regulations and permits. All submittals shall be IAW specification 01300 Submittals. All requirements shall be routed concurrently through the CO(R) and Installation Management Flight Environmental Elementt for review.

1.3.2.2 Protection of Environmental Features

The contractor shall determine methods for the protection of features to be preserved within the authorized work areas. The contractor shall submit methods to protect resources needing protection, including but not limited to:

trees, shrubs, grasses and ground cover; landscape features and soil; air and water quality; fish and wildlife; and historical, cultural and archeological resources; tidal and non-tidal wetlands; and critical habitat areas

1.3.2.3 Emergency Procedures

The contractor shall submit procedures to be followed as necessary in order to mitigate pollution of the environment from their construction site due to accident, natural causes or equipment failure.

1.3.2.4 Drawings

The contractor shall submit drawings showing locations of any proposed temporary or permanent excavations or embankments, haul roads, drainage systems, stream crossings, material storage areas, structures, parking areas, equipment storage areas, sanitary facilities, stockpiles of earth materials, disposal areas for excess earth material/unsatisfactory earth materials, informational boring, utility-related modification and any other project-related temporary disturbance.

1.3.2.5 Environmental Monitoring and Sampling Plans

The contractor shall include environmental monitoring and sampling plans for all applicable soil, water and air compliance requirements.

1.3.2.6 Work Area Plan

The contractor shall submit a work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or non-use. The plan shall include measures for marking the limits of use areas. The proposed work areas shall not exceed those limitations or boundaries identified in the environmental document prepared for this project.

1.3.3 Regulatory Approvals and Permits

The contractor shall be responsible for obtaining and complying with all required regulatory approvals and permits prior to the commencement of construction, if the necessary regulatory approvals and permits are not provided. In addition, the contractor shall complete the necessary studies or documentation to obtain said approvals and permits. The contractor may be required to maintain, correct, update, or reapply for mandatory approvals and permits, even if originally provided by another entity.

The contractor shall provide concurrently to the CO(R) and Installation Management Flight Environmental Elementt, copies of all environmental approval and permit applications and supporting documents before submission to any regulatory agency. Upon issuance, the contractor will provide the CO(R) with copies of the approved approval(s), concurrence(s) and permit(s), the CO(R) will provide copies of all approval(s) and permit(s) to the Installation Management Flight Environmental Element.

The contractor may be required to provide any or all notifications or reports to regulatory agencies in accordance with the approvals, concurrences and permits. Reporting and notification procedures will either be detailed with the contract statement of work or at the project kickoff meeting and may be amended, as necessary.

1.3.4 Environmental Training

The contractor shall ensure that all of its personnel are properly trained, equipped and aware of all applicable environmental regulations and requirements. In addition, the contractor shall be accountable for ensuring all of its personnel comply with said requirements. The contractor shall maintain documentation of this environmental training and provide Installation Management Flight Environmental Element (via the CO) access to those training records as required.

PART 2 EXECUTION

2.1 HAZARDOUS MATERIALS

2.1.1 Hazardous Materials Use

The contractor shall provide a list of all hazardous materials to be used to the CO(R) and Installation Management Flight Environmental Element, concurrently. IAW AAFBI 32-9003 a “Contractor HazMat Notification Sheet” shall be filled out identifying types and quantities brought on base, used on base as part of a contract, and removed from base upon contract completion. In addition, all Safety Data Sheets (SDS) shall be provided to the CO and Installation Management Flight Environmental Element. Compliance with 29 CFR§ 1910.1200, Hazard Communication Requirements, is mandatory at all times.

2.1.2 Hazardous Material Prohibitions

The use of Class I ozone depleting compounds, asbestos containing materials, polychlorinated biphenyls (PCBs), and mercury containing materials are prohibited. In addition, products containing EPA-17 compounds are discouraged. In all cases Installation Management Flight Environmental Element, in conjunction with the CO and upon contractor request, may waive in writing any prohibited material IAW applicable laws and regulations.

2.1.3 Unforeseen Hazardous Materials

If a material that is not indicated on any contract documents or drawings is encountered, and determined to be potentially dangerous to human health upon disturbance during construction operations, the contractor shall stop that portion of work and notify the CO immediately. This would include polychlorinated biphenyls (PCB), lead paint, asbestos, contaminated soils, etc. The CO will determine the appropriate course of action.

2.1.4 Hazardous Waste

All hazardous waste generated by or as a result of contractor activities shall be managed, stored, transported and disposed of in accordance with all applicable federal and local regulations.

Hazardous waste storage on site shall be limited to initial accumulation point criteria. Each waste stream generated shall be limited to no more than 55 gallons of hazardous waste or 1 quart of acute hazardous waste on site at any one time.

Establishment of hazardous waste storage sites shall be pre- coordinated via the CO with Installation Management Flight Environmental Element Hazardous Waste Manager (301-981-2337).

All hazardous waste shall be properly classified and profiled by the contractor in order to ensure proper disposal.

Management of any hazardous waste generated as the result of contractor activities shall be the sole responsibility of the contractor. The contractor must ensure that any hazardous waste generated through the contractor’s activities is properly removed from the site and disposed of in accordance with applicable law.

No hazardous waste shall be left at the site upon completion of contract operations.

All hazardous waste shall be properly manifested and transported IAW CFR Title

49. All hazardous waste manifests shall be coordinated with and signed by Installation Management Flight Environmental Element through the CO, unless otherwise changed in writing by the CO. Fully executed copies of manifests will be returned to Installation Management Flight Environmental Element for recordkeeping, in accordance with federal law.

2.1.5 Spills

The contractor shall take all necessary precautions to prevent spills of hazardous materials to include oils and hazardous wastes. In the event of a spill, the contractor shall immediately contact JBAB Emergency Dispatch/JBAB Fire Department at 202-433-3333 and the JBAB Tanks and Spill Program Manager at 202-767-4407.. The contractor shall ensure that the applicable requirements of federal and state regulations as well as JBAB spill provisions are complied with. The contractor shall have on hand the necessary resources (Absorbent pads, booms, spill absorbent materials, drain plugs) to properly respond to and clean up any spill caused by their operations. Any direction from the CO or the JBAB incident commander concerning a spill or release that is required to protect human health or the environment shall be immediately and properly executed.

2.2 AIR QUALITY

2.2.1 Required Air Permits

Air quality construction and or operation permits may be required for any stationary equipment or device that emits pollutants to the atmosphere or controls emissions to the atmosphere unless exempted by regulation.

Typical stationary sources which require analysis for applicable air quality permitting requirements are (list is not all-inclusive):

(a) Fuel burning equipment such as boilers, heaters, dryers, incinerators, ovens, etc.

(b) Stationary generators or fire pump engines;

(c) Fuel storage, transfer, and dispensing operations (petroleum storage tanks, loading racks, and/or dispensers);

(d) Paint booths, abrasive blasters, solvent based parts washers/degreasers;

(e) Aircraft or helicopter engine testing; and

(f) HVAC equipment, dry-cleaning facilities, fire fighter training, small arms firing ranges, ethylene oxide sterilizers, landfills, munitions open burn/open detonation sites, wastewater treatment plants, wet cooling towers, and welding/woodworking operations.

Prior to the start of construction activities, the contractor shall prepare applications for any Air Permits required by the District of Columbia Department of Energy & Environment (DOEE).

All applications shall be submitted to the CO(R) for and the Installation Management Flight Environmental Element, concurrently for review and approval, prior to submission to the DOEE. The contractor shall ensure adequate time for the preparation and submission of permit applications to avoid any adverse impacts and/or delays to their project. The contractor shall be responsible for the payment of all applicable permit fees.

Once a permit is approved and issued by DOEE, and the source is installed or modified, the contractor shall provide PWD Environmental information via the COR as requested, such as: manufacturer’s operating and maintenance manual (s) including maintenance requirements, maintenance procedures, maintenance schedule, manufacturer specification sheet (s), design builds (s) /engineering drawing(s), model / serial number(s), power rating(s), capacities, production rate(s), exhaust stack information, etc.

2.2.2 Emissions

Visible emissions shall not be emitted into the outdoor atmosphere from stationary sources, except as noted in DCMR Title 20 Chapter 6 Section 606.

Fuel burning equipment shall not discharge visible emissions.

Boilers, furnaces, water heaters and other fuel burning equipment shall utilize low NOx technologyor or similar technology, if possible.

Contractor shall not conduct open burning at any sites on base.

Contractor shall respond appropriately to minimize dust emissions. Soils at the site and on unpaved access roads shall be treated with dust suppressants. Use of dry power brooms and air blowing is not authorized.

Wet cutting shall be used for all masonry type cutting such as concrete, concrete blocks, stone, etc. Contractor shall provide tarpaulin drop cloths and windscreens under and around sandblasting operations to confine and collect dust, sand, paint, and other debris for disposal.

Contractor shall not use or apply cutback asphalt in any paving operations, except in the situations noted in DCMR Title 20 Chapter 7.

Contactor shall use architectural coatings that comply with the Volatile Organic Compound (VOC) limits and coatings that comply with the miscellaneous metal, aerospace and vehicle refinishing limits identified in DCMR Title 20 Chapter 7.

Contractor shall not vent or cause to be vented to the atmosphere chlorofluorocarbon (CFC) or hydrochlorofluorocarbon (HCFC) refrigerants, halon or other similar ozone depleting compounds. Contractor shall have available refrigerant recovery/recycling equipment and personnel certified to operate said equipment. All reclaimed refrigerant and halon shall be disposed of through an approved reclamation center or be properly reused on the project (in some cases specific CFCs and halons remain the property of the government and must be returned to the Defense Logistics Agency CFC/Halon Bank). Proof of proper disposal shall be provided to the CO and Installation Management Flight Environmental Element.

Contractors performing work on facility Heating Ventilation and Air Conditioning (HVAC) equipment shall coordinate with the 11 CES/CEO HVAC Shop (through the CO) to provide required information on service performed and the amount and type of refrigerant disposed of.

2.3 WATER RESOURCES

2.3.1 Design for Stormwater Management

For any project that is a major land-disturbing activity or a major substantial improvement activity per the DC regulatory definition, the contractor shall prepare and submit a Stormwater Management Plan (SWMP) to DOEE prior to beginning construction. The contractor is subject to, but not limited to the following guidelines:

(a) Contractors shall reference the most current version DC’s Stormwater Management Guidebook and associated DC regulations for preparation of the SWMP plan.

(b) The SWMP plan will be submitted utilizing the DC Stormwater Database (SWDB) and will be included within the JBAB Organization within the SWDB.

(c) The contractor shall schedule all required inspections by the Department of Energy and Environment (DOEE) inspectors.

(d) Design plans, required maintenance schedule, and any operational information for the new stormwater best management practices (BMPs) must be provided to the stormwater program manager via the COR prior to DOEE submission.

Note that while not a District requirement, any land-disturbing activity over 5,000sf requires compliance with the Energy Independence and Security Act (EISA), Section 438. Technical guidance for EISA is available from the U.S. EPA at https://www.epa.gov/sites/production/files/2015-09/documents/eisa- 438.pdf and from the Unified Facilities Criteria, Low Impact Development, UFC-3-210-10.

The Contractor will make use of Environmental Site Design (ESD), which highlights the use of non-structural Best Management Practices (BMPs) as the first priority when designing stormwater management controls.

The contractor may use structural BMPs only after all practical non-structural options are exhausted. Exposed stormwater management ponds, especially ones that contain standing water, are to be used only as a last resort.

2.3.2 Existing Government Stormwater Resources

The contractor will refer, as applicable, to the current version of the following base plans when designing post-construction stormwater management for projects:

JBAB BMP Inventory JBAB Stormwater Pollution Prevention Plan (SWPPP) JBAB Floodplain Maps JBA Spill Prevention, Control and Countermeasures (SPCC) Plan

The contractor can find information on the District’s stormwater management requirements online at:

https://doee.dc.gov/node/610622.

2.3.3 Stormwater Approvals and Permits

The contractor must comply with all District requirements for erosion and sediment control, post- construction stormwater management, and other water management issues as specified in DCMR Title 21 Chapter 5. Where applicable, the contractor shall prepare the appropriate plan application(s) for submission to Department of Energy and Environment (DOEE). For projects over an acre, the contractor may also have to prepare and submit a National Pollutant Discharge Elimination System (NPDES) discharge permit application prior to the start of construction activities.

For any project involving the disturbance of land equal to or in excess of 50 ft2, the contractor shall submit an erosion and sediment control (ESC) plan to the DOEE and obtain approval prior to beginning construction. The contractor shall schedule all required inspections by DOEE inspectors. Contractors should reference DOEE’s online erosion and sediment control resources found at https://doee.dc.gov/esc.

The contractor is subject to, but not limited to the following guidelines:

(a) Contractors shall reference DC’s Erosion and Sediment Control Manual for preparation of the ESC plan.

(b) The ESC plan will be submitted utilizing the DC Stormwater Database (SWDB) and will be included within the JBAB Organization within the SWDB.

(c) ESC practices will be properly maintained during the duration of the project until final stabilization has been achieved. Note: If construction has concluded but final stabilization has not been achieved, it is still the contractor’s responsibility to maintain ESC measures until final stabilization is achieved.

(d) Contractors are subject to DC’s ESC regulatory requirements.

(e) In the event that an ESC plan must be changed during construction, the contractor is required to submit a revised ESC plan to the DOEE for approval.

(f) Projects requiring 5,000 ft2 or more of land disturbance must have a DC-licensed “Responsible Person” on site per DCMR 547.

Regardless of the applicability of the Erosion and Sediment Control Plan requirement, nothing from a construction site is permitted to enter JBAB’s stormwater system to include but not limited to sawcut slurry, chlorinated water, and sediment. The contractor is required to have POL spill response materials onsite and is responsible for the immediate clean-up of any spills or leaks associated with their activity.

The Contractor shall obtain the final approval(s), authorization(s), and plan(s) from DOEE and make all necessary notifications before construction begins. A copy of the approval(s), authorization(s) and plan(s), and all other applicable documents shall be maintained at the job site or a centralized and accessible location and made ready for no-notice inspection by JBAB and regulatory authorities.

Disturbances exceeding 1 acre are regulated by EPA’s NPDES Construction General Permit and must submit a Stormwater Pollution Prevention Plan (SWPPP) to both DOEE and EPA Region 3 that is compliant with the requirements of this permit. The Contractor will submit a Notice of Intent (NOI) for coverage under the General Permit for projects with a limit of disturbance greater than 1 acre.

The NOI shall be submitted to the CO(R) and the Installation Management Flight Environmental Element concurrently prior to submission to EPA and DOEE. The Contractor shall obtain the approved NOI from EPA and make all necessary notifications before construction start. A Stormwater Pollution Prevention Plan (SWPPP) must be developed and maintained in accordance with the general permit. Weekly inspections of stormwater management and sediment and erosion controls must be performed and documented. A copy of the NOI, the EPA General Stormwater Permit for Construction Activities, the SWPPP, inspection records and all other applicable documents shall be maintained at the job site or a centralized and accessible location and made ready for no-notice inspection by JBAB and regulatory authorities.

2.3.4 Stormwater Management Plan

The contractor shall prepare and submit a Stormwater Management Plan (SWMP) for projects that exceed 5,000 square feet in size or qualify as a substantial improvement activity per DOEE. The SWMP shall be coordinated with the Installation Management Flight Environmental Element through the CO prior to submission to the DOEE. The contractor shall comply with the conditions set forth in the plan/approval.

2.3.5 Erosion and Sediment Control Plans

The contractor shall prepare an Erosion and Sediment Control Plan for all projects that exceed 50 square feet. The plans shall be coordinated with the CO and Installation Management Flight Environmental Element before submission to the DOEE. The contractor shall comply with the conditions set forth in the plan/approval.

2.3.6 Erosion and Sediment Control Protection

The contractor shall implement and maintain all necessary controls to prevent sedimentation runoff to stormwater for all construction projects regardless of size or scope. The contractor shall use the current version of the District’s Erosion and Sediment Control Manual.

The contractor shall ensure a properly trained and certified individual (holder of a “MDE Green Card”) is on site during applicable activities.

Discharge of sediment to stormwater (including storm drains) is prohibited.

The contractor shall execute soil stabilization to include seeding, hydro seeding, etc., within 7 days after soil disturbance on slopes and 14 days in other areas.Contractor shall employ appropriate measures to prevent discharge of sediment to stormwater during construction dewatering activities.

Excess materials generated from contractor activities to include soil, slurry, gravel, concrete or other similar materials must be removed from JBAB. Disposal or dumping of these materials on base is not authorized. The only exception to this is if the materials are to be reused on the project that generated the excess material. Temporary storage is only authorized within the project area and must implement all required sedimentation and erosion control measures.

DOEE inspectors regularly inspect construction sites on JBAB to ensure compliance with approved plans and permits. Violations may subject the contractor to warnings, fines, penalties, or work stoppage. Correction of violations and enforcement actions, including fines and penalties, are the responsibility of the Contractor and not the government. Delays to regulatory enforcement actions are not compensable to the Contactor and may subject the Contractor to any penalties within the contractor for not meeting project deadlines.

2.3.7 Borrow Material

No material shall be borrowed from onsite locations without the approval of Installation Management Flight Environmental Element and the

CO(R).

Fill material from off-base shall be tested for the presence of petroleum constituents (TPH, BTEX), TCLP Metals, ignitability, corrosivity, and reactivity. It shall contain less than 5 parts per million (ppm) of TPH, less than 5 parts per billion (ppb) of benzene, less than 5,000 ppb of the sum of benzene, toluene, ethylbenzene, and xylenes, and shall not fail the TCLP test. TPH concentrations shall be determined by using EPA Methods 8015B (TPH-GRO) and 8015B (TPH-DRO). Benzene and BTEX concentrations shall be determined using EPA Method 8021, and the TCLP test shall be conducted using EPA Method 1311. The tests shall be conducted on a composite sample of the fill material, with at least one test being conducted for each borrow site from which the fill material was obtained. The fill material shall not be brought onsite until the tests have been reviewed and approved by 11CES/CEIE.

No excess borrow material shall be disposed of on site. The temporary storage of borrow material shall be accomplished within the project site implementing all required sedimentation & erosion control measures.

2.3.8 Releases to Waterways

Discharges of any petroleum, oil and lubricants, hazardous material, sewage or other regulated substances to waterways, including storm drains, ditches or similar contrivances are strictly prohibited. Contractor shall employ all necessary measures to preclude contamination of waterways from the construction site.

Contractor shall take necessary precautions to prevent damage to buried pipelines, sewage lines, tanks and other infrastructure. Damage to such infrastructure shall be contact JBAB Emergency Dispatch/JBAB Fire Department at 202-433-3333 and the JBAB Tanks and Spill Program Manager at 202-767-4407.

2.3.9 Wastewater

Contractors shall comply with the conditions of the DC Water Non- Significant Industrial User Wastewater Discharge Permit (No. NS1001-4) issued to JBAB. The Contractor may also refer to the most current WSSC Plumbing and Gas Code for additional requirements and guidance, which is available online at: http://www.wsscwater.com/home/jsp/content/plumb-gas-code.faces.

At a minimum, only standard domestic sewage is authorized for discharge to the base sanitary sewer system. No industrial waste, hazardous waste, hazardous material, oil, fuel, or other regulated substances may be discharged to the base sanitary sewer system. Contractors must contact the Installation Management Flight Environmental Element prior to contract start in order to make alternate waste disposal arrangements.

New or existing facilities with food handling capability (food service) must comply with DC Water regulations for the installation of best management practices (BMPs)and other requirements for the proper handling and disposal of waste food, oils, and greases so that they do not negatively impact the wastewater collection system. The Contractor shall comply with these requirements if applicable to the project.

2.3.10 Drinking Water

If the project will provide a new connection to an existing sanitary sewer or potable water line, contact either the wastewater or drinking water contact program manager via the COR as appropriate for further instructions.

If the project involves the construction of a new building will increase the population served by more than 100 people, contact the drinking water program manager via the COR for further instructions.

If the project involves changing external potable water lines, contact PWD GIS POC to update system maps.

2.3.11 Oil Water Separators

Installation of below ground oil water separators (OWS) is highly discouraged and shall be authorized only where no other engineering option exists. OWS installations shall typically be above ground and of a high performance design to adequately “treat” the effluent being discharged to below sanitary sewer discharge criteria (as defined by base sanitary sewer discharge permit).

Process OWS shall be connected to the sanitary sewer system. OWS connections to stormwater are prohibited except where designed and approved to “treat” stormwater discharges.

OWS installations shall comply with all applicable construction codes and federal and state regulations.

2.4 TOXIC MATERIALS

2.4.1 Asbestos

The use of asbestos containing materials (ACM) is prohibited.

Any construction activity by any organization designed to encapsulate, enclose, repair or otherwise disturb asbestos containing material, regardless of quantity, shall be pre-coordinated, via the CO, with Installation Management Flight Environmental Element (Asbestos Program Manager) and 79 AMDS/SGPB. All required asbestos related plans shall be coordinated through the CO, and Installation Management Flight Environmental Element and 79 AMDS/SGPB shall review and approve them prior to the commencement of any project.

After coordination with Installation Management Flight Environmental Element, contractor shall make proper notification to DOEE and possibly the US Environmental Protection Agency (EPA) for all projects where more than 260 linear feet, 160 square feet, or 35 cubic feet of ACM that is friable or likely to become friable as result of construction activities, will be disturbed. DOEE will require an approved permit. Contractor shall maintain documentation of notifications, permit applications, and submittal of permit fees and shall provide, via the CO, Installation Management Flight Environmental Element access to those records, as required.

Contractor shall ensure that all personnel are properly trained and certified to US EPA and DOEE standards. Contractor shall maintain documentation of this training and certification and shall provide, via the CO, Installation Management Flight Environmental Element access to those training records, as required.

Contractor shall comply with all requirements to post warning signs and notifications for any projects where disturbance of ACM is planned.

Contractor shall comply with all applicable measures to ensure asbestos is not released to the environment.

Contractor shall ensure that all waste ACM is properly containerized, labeled, manifested and disposed of at an authorized site. All waste manifests shall be coordinated with the CO for Installation Management Flight Environmental Element review and signature prior to shipping.

Contractor shall ensure that all post project requirements are complied with, to include cleanup, sampling and regulatory notification. All post project reports and data shall be sent to the CO with a copy for Installation Management Flight Environmental Element and 79 AMDS/SGPB. Fully readable copies of waste manifests, signed by the transporter and a representative of the disposal site, shall be sent to Installation Management Flight Environmental Element (Asbestos Program Manager) within 30 days from the date the waste left the base.

2.4.2 Lead Based Paint (LBP)

The use of paints containing lead is prohibited.

Any construction activity that disturbs LBP must be pre-coordinated via the CO with Installation Management Flight Environmental Element (301-981- 2337) and 79 AMDS/SGPB (240-857-

3380). Planned renovation or demolition of buildings constructed prior to 1978 will be generally suspected to have the potential to disturb lead-based paint. This work must be preceded by sampling to determine if lead based paint is present. The results of this sampling must be provided via the CO to Installation Management Flight Environmental Element and 79 AMDS/SGPB to determine whether lead paint is present or not, and with a recommendation for whether abatement is required or not.

Any required lead-based paint abatement plans shall be coordinated via the CO with Installation Management Flight Environmental Element and 79 AMDS/SGPB prior to the commencement of any project. Next the contractor shall make proper notification to the DOEE and or EPA for all projects where LBP is to be disturbed.

The contractor shall ensure all personnel are properly trained and certified to US EPA and DOEE standards. The contractor shall maintain documentation of this training and certification and shall provide to CO, and allow Installation Management Flight Environmental Element access to those training records as required.

The contractor shall comply with all requirements to post warning and notifications for any projects where disturbance of LBP is planned. The contractor shall comply with all applicable measures to ensure LBP is not released to the environment.

Contractor shall ensure all waste LBP is properly containerized, labeled, manifested and disposed of at an authorized site. All waste manifests shall be coordinated with CO for Installation Management Flight Environmental Element signature prior to shipping, and fully executed copies of the manifest must be returned to Installation Management Flight Environmental Element.

2.4.3 PCBs

The use of products containing PCBs is prohibited.

Any PCB containing materials identified during construction activities shall be brought to the attention of the CO and Installation Management Flight Environmental Element immediately.

The contractor shall comply with all applicable measures to ensure PCBs are not released to the environment.

Contractor shall ensure all waste PCBs are properly containerized, labeled, manifested and disposed of at an authorized site. All waste manifests shall be coordinated with the CO for Installation Management Flight Environmental Element signature prior to shipping, and fully executed copies of the manifest must be returned to Installation Management Flight Environmental Element.

2.5 TANKS

2.5.1 Installation of underground storage tanks (USTs) is strongly discouraged and shall be authorized by 11 CES/CD only where safety or security provisions outweigh the associated environmental risks. Aboveground storage tanks (ASTs) shall be the preferred installation. All new non-temporary tank installations must be coordinated with JBAB Tanks and Spill Program Manager at 202-767-4407. .

2.5.2 All AST installations shall comply with Title 40 CFR Part 112 requirements for secondary containment and release prevention.

2.5.3 All temporary tank installations shall be ASTs. Temporary ASTs (TASTs) used to support construction operations shall comply with UL-142 and applicable National Fire Protection Association (NFPA) criteria. TASTs shall be double walled with adequate secondary containment at the fill port and discharge port to collect spills. The Contractor is responsible for maintaining a supply of spill response materials to respond to small spills in the work area, including absorbent pads and the capability to prevent a spill from entering a nearby storm drain or waterway using a plug, dike, or boom. Upon completion and demobilization of the AST, the area will be subject to inspection by the CO or delegated authority.

2.5.4 Permanent ASTs (PASTs) shall comply with UL-2085, and applicable

NFPA criteria. PASTs shall be double walled with adequate secondary containment at the fill port and discharge port to collect spills.

All approved UST installations shall comply with all Title 40 CFR Part 280.

40,41,44 requirements to include containment, leak detection equipment (automatic tank gauging), cathodic protection (as applicable), and monitoring systems. Tank systems shall also comply with DCMR Title 20 Chapters 55-67 and 70, which details tank construction requirements and release detection and inspection requirements.

2.5.6 All tank installations shall be properly signed and labeled with contents, capacity, any applicable hazards (e.g., flammable) and restrictions (e.g., no smoking within 50 feet).

2.6 RECYCLING

Recycling is mandatory for all personnel that live on or work for or on behalf of JBAB. This includes all host and tenant organizations as well as all contractor personnel. The following requirements apply to all contractors:

2.6.1 The contactor shall recycle, reclaim or reuse all materials to avoid, to the greatest extent possible, disposing of waste generated as part of the project in landfills. The contractor, through the CO shall report quantity of all waste generated and quantity recycled or reused to Installation Management Flight Environmental Element on a quarterly basis.

2.6.2 Construction debris shall be recycled or reused to the maximum extent possible. Contractor shall obtain containers for temporary storage as needed.

2.6.3 Residential and office-type recyclable materials such as white paper, cardboard, metal cans, glass bottles, plastic bottles, etc. shall be recycled, to the greatest extent possible. Contractors shall coordinate recycle material pick up.

2.6.4 Green waste, such, as trees, limbs and other vegetation shall be processed, to the greatest extent possible, for composting.

2.6.5 Industrial type wastes such as tires, motor oil, batteries, etc., generated because of contractor project operations shall be recycled.

2.6.6 The contractor shall procure and use products with recycled content to the greatest extent possible. In addition, environmentally preferred alternative products shall be given consideration to the greatest extent possible.

2.6.7. Green Procurement is the government’s program designed to give preference to the purchase of materials with recycled content and/or bio-based content to include services that use such products. Comprehensive Procurement Guidelines are published by the EPA for those items that must legally be considered when making purchases. The Recommended Material Advisory Notices give guidance on specific percentages of recycled content in those materials listed by the EPA, for example the 30% requirement for copy paper. These documents can be found at http://www.epa.gov/cpg/backgrnd.htm.

Green procurement requirements apply to all federal agencies, as well as any state agency or contractor using appropriated federal funds. Written justification must be provided to purchase items that do not meet the minimum recovered material standards, using one of the following exemptions:

The item is not available within a reasonable timeframe The performance of the recycled content item is inadequate The item is unavailable at a sufficient level of competition The price of the recycled content item is unreasonable

Please refer to AFI 64-117, Section 2.10, for more information regarding affirmative procurement.

Examples of readily available products with recycled content include commercial carpeting, rugs, partitions, and other building systems.

2.7 CONTAMINATED MEDIA (SOIL and GROUNDWATER)

2.7.1 Prior to any digging or trenching, the contractor shall comply with all conditions identified, as part of the approval. Digging or trenching within 6 feet of an existing groundwater monitoring well is prohibited.

Contractors shall be liable to any damages to monitoring wells resulting from their activities. Should a well need to be abandoned; the work must follow District of Columbia Municipal Regulations (DCMR) Title 21 Chapter 18 for well “Abandonment Standards”. This regulation requires an abandonment report which will have to be generated and signed by a District of Columbia certified well driller and provided to 11CES/CEIE.

2.7.2 Any contaminated soils that are encountered during construction activities shall be immediately reported to the CO and Installation Management Flight Environmental Element (301-981- 9612).

2.7.3 Construction projects that occur in locations where soil or groundwater contamination is known to exist or identified during construction activities shall comply with all applicable environmental and health and safety provisions. Contractor shall coordinate via the CO with Installation Management Flight Environmental Element prior to construction activities for a potential site visit by a DOEE inspector. In addition the following provisions shall apply:

2.7.3.1 A written Site Specific Health and Safety Plan (HASP) shall be prepared by the contractor IAW CFR Title 29, approved by a Certified Industrial Hygienist and coordinated with Installation Management Flight Environmental Element through the CO prior to commencement of any construction activities.

2.7.3.2 All personnel working in the construction area shall be familiar with all aspects of the Site Specific HASP. Personnel shall be trained in hazardous waste operations to the extent required by 29 CFR Part 1910.120.

2.7.3.3 During excavation, soils shall be monitored with a photo ionization detector for evidence of contamination. When PID readings above 10 ppm are encountered continuous screening of the excavated soil is required. Soils with PID readings of less than 50 ppm (taken from headspace in a bag) are considered “clean” and can be reused as backfill for the excavation, if suitable. Excavated soil, which exhibits signs of visual impact, shall be considered “contaminated.” Also, soils with PID readings of 50 ppm or greater, shall be considered “potentially contaminated.” If contamination or potential contamination is observed, the material shall be segregated from non-contaminated soils. The material shall be sampled for characterization before off-site disposal at a licensed waste management facility. Sampling and testing of excavated contaminated soils shall be conducted as specified in Section 2.7.3.5 and all requirements of DOEE.

2.7.3.4 Excavated soil shall be placed in temporary storage (protected stockpiles or covered roll-off box) immediately after excavation. Stockpiles shall be constructed to isolate contaminated material from the environment including a geo-membrane liner on the ground surface, as well as a liner covering the material to prevent precipitation from entering the stockpile.

The ground surface on which the liner is placed shall be free of rocks greater than 0.5 inches in diameter and any other object, which could damage the membrane. The cover material shall be anchored to prevent it from being removed by wind.

Samples of stored material shall be collected at a frequency of once per 25 cubic yards or per each roll-off container, whichever is less. Samples shall be tested for TPH using EPA Methods 8015B (TPH-GRO) and 8015B (TPH-DRO). If the stockpile is known or suspected to have been impacted by/contained hydrocarbons heavier than No. 6 Fuel Oil (e.g., motor oil, lubricants, grease), then in addition to the listed methods, it shall also be tested for TPH using EPA Method 1664M. Stored materials with a TPH concentration that exceeds 50 ppm shall be considered contaminated and shall be treated offsite.

2.7.3.5 Contaminated soil shall be sampled prior to disposal IAW disposal site criteria. Prior to transportation the contaminated soil shall be tested for the following:

Ignitability Percent Moisture pH Level VOCs (8260) PCBs (8080) TPH (8015 Modified – Purge & Trap) TPH (8015 Modified – Solvent Extraction) TCLP Metals (1311 for 8 RCRA Metals) Reactivity

TPH (1664M)*

TOX/Total Organic Halides (9020)*

* = These analyses are only necessary when characterizing impacts from waste oil or fuels heavier than No. 6 Fuel Oil (e.g., motor oil, lubricants, grease)

All collected analysis data shall be provided via the CO to Installation Management Flight Environmental Element.

2.7.3.6 Contaminated liquids collected from excavations and stockpiles shall be temporarily stored in appropriate and approved containers. Liquid storage containers shall be watertight and stored to prevent any environmental risk from leaks or spills.

2.7.3.7 Contaminated liquid collected from excavations or stockpiles shall be sampled to the extent necessary to determine appropriate disposal methods IAW federal, state and disposal site regulations. Documentation of all analyses performed shall be furnished to the CO, who will forward to Installation Management Flight Environmental Element and the treatment facility.

2.7.3.8 Contaminated materials from excavations or stockpiles shall be transported for off base disposal IAW federal and state regulations. All waste manifests shall be coordinated through the CO with Installation

Management Flight Environmental Element for signature prior to shipping, with fully executed copies provided upon disposal.

2.7.3.9 Excavations shall be backfilled with clean material immediately after all contaminated materials have been removed and the satisfactory results of confirmation tests for backfill material, specified in Section 2.3.5, have been approved by Installation Management Flight Environmental Element.

2.7.3.10 The contractor shall prepare a letter and submit it via the CO to Installation Management Flight Environmental Element within 45 calendar days of completing work at the site. The report shall be labeled with the contract number, project name, location, date and name of the general contractor completing the work. The letter shall include the following information as a minimum:

Type of work performed Field screening readings Quantity of materials removed Sampling locations and sampling methods Sample chain-of-custody forms Source of backfill Chemical and physical test results Disposal manifests Certifications of final disposal Drawings to show limits of excavation and contamination and sample locations Photographs to document the soil removal, sampling procedures, contaminated material storage, fill placement and grading, and site post-construction

2.8 NATURAL RESOURCES

2.8.1 Any work on base by the contractor may not fill, trench, dredge, drain or create crossings through any wetlands or within the 25-foot (100 feet in some cases) wetlands buffer without appropriate Clean Water Act sections 404 and 401 permitting by regional regulatory agencies and proper clearance via the CO from Installation Management Flight Environmental Element. Wetland areas must be protected at all times by using proper Soil/Erosion Control Measures (see section) or other US Army Corps of Engineers or state approved methods.